ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / MARS MOUNT

Registration approved Residential/Group Housing project

MARS MOUNT

By Mars Builders

RG-KA-75198 · RERA PRM/KA/RERA/1251/310/PR/170922/000583

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka

Clear

  • Completion date never moved
  • Separate project account declared
Jun 2019Possession promisedno revision filed
1Complaints at RERA Karnatakaon this registration
Jump to the 32 documents Report an error

MARS MOUNT is a Residential/Group Housing project by Mars Builders in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/170922/000583 on 22 Sep 2017. Possession is promised by 5 Jun 2019. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMARS MOUNT
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/170922/000583
  • ReraGenie IDRG-KA-75198

Builder

  • NameMars Builders
  • Entity typePartnership Firm
  • Authorized SignatoryNaresh Kumar H

Key dates

this monthRegisteredSep 2017PromisedJun 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on22 Sep 2017
  • Promised completion5 Jun 2019
  • Revised completionNone
  • Buildings1 building record
  • Documents filed32 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mars Mount---1240124

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityNoNot applicable
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,477 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 35.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAdithya. G. Kashyap
EngineerAdithya. G. Kashyap

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01219/2025-Mars Builders23/09/2025

Documents filed32

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/170922/000583 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Mars Builders Partnership.jpg-
Commencement Certificate-
HPSC1330-compressed-
sale agreement-
jda3-
sECTION PLAN-
ROUCHER-
POLLUTION BOARD-
sPECIFICATION-
EC-
Khata-
BWSSB NOC-
Balance Sheet 2015 - 2016File: Mars Builders_Balance Sheet_2015-16-compressed.pdf-
Balance Sheet 2014 - 2015File: Mars Builders_Balance Sheet-2014-15.pdf-
Balance Sheet 2013 - 2014File: Mars Builders _Balance Sheet _2013-14.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Mars Builders_P&L Ac_2015-16-compressed.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Mars Builders_Profit and Loss-2014-15.pdf-
Audited Profit and Loss Statement 2013 - 2014File: Mars Builders _Profit and Loss _2013-14.pdf-
Auditor's Report 2015 - 2016File: 2015 3CB-compressed.pdf-
Auditor's Report 2014 - 2015File: 2014 CB-compressed.pdf-
Auditor's Report 2013 - 2014File: 2013 3CB-compressed.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: 2015.jpg-
Income Tax Return Acknowledgement 2014 - 2015File: 2014.jpg-
Income Tax Return Acknowledgement 2013 - 2014File: 2013.jpg-
Form B-
Prospectus/BrochureFile: mars mount Broucher.pdf-
Advertisement Copy 1File: mars mount Broucher.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_170922_000583.xlsx-
Occupancy CertificateFile: 30-11-2018_Occupancy Certificate.pdf-
Completion certificateFile: 20-09-2018_106.pdf-
Registered Agreement of SaleFile: 28-12-2018_112.pdf-
Registered conveyance deed for an individual unitFile: 03-01-2019_225.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep MARS MOUNT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmMARS MOUNTOther 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: Mars Builders

Mars Builders has 1 registration on RERA Karnataka, including MARS MOUNT. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if MARS MOUNT is delayed beyond 5 Jun 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MARS MOUNT?

The registered promoter entity is Mars Builders, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MARS MOUNT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MARS MOUNT?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at MARS MOUNT?

The professionals named in the filing: Architect: Adithya. G. Kashyap; Engineer: Adithya. G. Kashyap. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MARS MOUNT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARS MOUNT. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARS MOUNT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.