Home / Browse projects / Bengaluru Urban, Karnataka / Mantri Webcity2B
Mantri Webcity2B
By Propcare Developers Private Limited
RG-KA-38217 · RERA PRM/KA/RERA/1251/310/PR/171015/000620
Source: official RERA Karnataka filing
Red flags
- 23 complaints at RERA Karnataka
- Completion date moved by 21 months
- 2 extensions taken
Clear
- Separate project account declared
Saved.
Mantri Webcity2B is a Residential/Group Housing project by Propcare Developers Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171015/000620 on 15 Oct 2017. Possession is promised by 30 Dec 2023. The completion date has moved by 21 months from the original filing. 23 complaints are on record with the regulator.
At a glance
Project
- NameMantri Webcity2B
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/171015/000620
- ReraGenie IDRG-KA-38217
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on15 Oct 2017
- Promised completion30 Dec 2023
- Revised completionRevised to 30 Dec 2023 (originally 31 Mar 2022)
- Buildings3 building records
- Documents filed75 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| K | - | - | - | 147 | 0 | 147 |
| L | - | - | - | 147 | 0 | 147 |
| M | - | - | - | 147 | 0 | 147 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | Not applicable |
| Plastering inside , outside & Ceiling | Not applicable |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RSP |
| Engineer | NAGESH CONSULTANTS |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterFinancial crunch
Complaints filed with RERA Karnataka23
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/190319/0002378 | - | Mantri Developers Private Limited | 19/03/2019 |
| CMP/191122/0004784 | - | Mantri Developers Private Limited | 22/11/2019 |
| CMP/191208/0003140 | - | Mantri Developers Private Limited | 08/12/2019 |
| CMP/200217/0005440 | - | Mantri Developers Private Limited | 17/02/2020 |
| CMP/200228/0005588 | - | Mantri Developers Private Limited | 28/02/2020 |
| CMP/200415/0005827 | - | Mantri Developers Private Limited | 15/04/2020 |
| CMP/200602/0005953 | - | Mantri Developers Private Limited | 02/06/2020 |
| CMP/200719/0006222 | - | Mantri Developers Private Limited | 19/07/2020 |
| CMP/200729/0006227 | - | Mantri Developers Private Limited | 29/07/2020 |
| CMP/200924/0006572 | - | Mantri Developers Private Limited | 24/09/2020 |
| CMP/211126/0008648 | - | Mantri Developers Private Limited | 26/11/2021 |
| CMP/220416/0009360 | - | Mantri Developers Private Limited | 16/04/2022 |
| CMP/221104/0010182 | - | Mantri Developers Private Limited | 04/11/2022 |
| CMP/221107/0010198 | - | Mantri Developers Private Limited | 07/11/2022 |
| CMP/221107/0010199 | - | Mantri Developers Private Limited | 07/11/2022 |
| CMP/221107/0010205 | - | Mantri Developers Private Limited | 07/11/2022 |
| CMP/221107/0010208 | - | Mantri Developers Private Limited | 07/11/2022 |
| CMP/221107/0010218 | - | Mantri Developers Private Limited | 07/11/2022 |
| CMP/221107/0010219 | - | Mantri Developers Private Limited | 07/11/2022 |
| CMP/221119/0010365 | - | Mantri Developers Private Limited | 19/11/2022 |
| 00283/2023 | - | Mantri Developers Private Limited | 03/03/2023 |
| 01047/2024 | - | Mantri Developers Private Limited | 22/10/2024 |
| 00071/2026 | - | Mantri Developers Private Limited | 03/02/2026 |
Documents filed75
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171015/000620 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CertificateFile: COI_MDPL.pdf | - |
| Architect Certificate for Work Completion Schedule till DateFile: Arch Cert for Work Compltn till Webcity 2B.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Eng Cert for Work Compltn Webcity 2B.pdf | - |
| CA Certificate for Funds UtilizationFile: CA Cert for funds utilized Webcity 2B.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Arch Cert for Pending Work Webcity 2B.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Eng Cert for Pending Work Webcity 2B.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: CA Cert for funds required Webcity 2B.pdf | - |
| AffidavitFile: Seeking extension Affidavit.pdf | - |
| Latest Encumbrance CertificateFile: EC.PDF | - |
| Details Of Sold/ Un-sold UnitsFile: Sold and Unsold details.xlsx | - |
| Document 1File: EC- 2.pdf | - |
| Document 2File: EC- 3.pdf | - |
| Document 3File: EC- 4.pdf | - |
| Document 4File: EC-1.pdf | - |
| Webcity 2 BDA remodified Licence | - |
| Site Plan | - |
| Site Plan | - |
| Webcity - Customer Sale Deed | - |
| Mantri Webcity - Construction Agreement | - |
| Site Plan | - |
| Webcity2 Cross section | - |
| JDA-Hennur-II lands dated 29 06 2013 | - |
| Webcity2 Cross section | - |
| Re modified DP Site plan 180216 | - |
| Webcity 2B Allotment Letter | - |
| MDPL | - |
| AAI NOC -250711 | - |
| Specifications and Amenities - Webcity | - |
| Webcity 2B - EC Declaration | - |
| Webcity Amalgamated Khatha - Combined | - |
| Amnd JDA and GPA Combined | - |
| Any other document | - |
| Webcity 2B Conversion Orders Combined-Compressed | - |
| Section 14 of KTCP ACT | - |
| Utilization Certificaate NA | - |
| TDR NA | - |
| Reliquinshment Deed NA | - |
| Fire NOC - 211016 - WebcityParcel2 | - |
| AAI NOC -250711 | - |
| BESCOM -061210 | - |
| BWSSB -040308 | - |
| KSPCB CFO DTD-261215 | - |
| 2011 0916 MOEF NOC | - |
| BSNL -120307 | - |
| Noc in case of building proposals abutting to neighbouring properties | - |
| Unnamed document | - |
| Urban Land Ceiling | - |
| BMRCL | - |
| Bangalore Urban Arts Commission | - |
| Inspector of Factories Controller of explosives | - |
| Dist Magistrate | - |
| Coastal Regulation Zone Authority | - |
| Certificate from Registered Engineer | - |
| Webcity2 Cross section | - |
| Balance Sheet 2015 - 2016File: MDPL March 2016-BS.pdf | - |
| Balance Sheet 2014 - 2015File: MDPL_2015-BS.pdf | - |
| Balance Sheet 2013 - 2014File: MDPL_financials_FY14-BS.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: MDPL March 2016-P&L.pdf | - |
| Audited Profit and Loss Statement 2014 - 2015File: MDPL_2015-PL.pdf | - |
| Audited Profit and Loss Statement 2013 - 2014File: MDPL_financials_FY14-PL.pdf | - |
| Director's Report 2015 - 2016File: MDPL-March 2016-DR (2).pdf | - |
| Director's Report 2014 - 2015File: MDPL_2015-DR.pdf | - |
| Director's Report 2013 - 2014File: MDPL_financials_FY14-DR.pdf | - |
| Cash Flow Statement 2015 - 2016File: MDPL March 2016-Cashflow statement.pdf | - |
| Cash Flow Statement 2014 - 2015File: MDPL_2015-CFS.pdf | - |
| Auditor's Report 2015 - 2016File: MDPL March 2016-Auditor report.pdf | - |
| Auditor's Report 2014 - 2015File: MDPL_2015-AR.pdf | - |
| Auditor's Report 2013 - 2014File: MDPL_financials_FY14-AR.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: ITRV-AY-2016-17.pdf | - |
| Income Tax Return Acknowledgement 2014 - 2015File: ITRV-AY-2015-16.pdf | - |
| Income Tax Return Acknowledgement 2013 - 2014File: ITRV-AY-2014-15.pdf | - |
| Mantri Webcity 2B - Form B | - |
| Prospectus/BrochureFile: webcity-brochure.pdf | - |
| Advertisement Copy 1File: Mantri Home Rush - Hindu Jacket copy.pdf | - |
| Tower Excel SheetFile: 1-PRM_KA_RERA_1251_310_PR_171015_000620-Mantri Webcity-2b.xlsx | - |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Webcity 1 | - | Completed | Jul 2017 | No date filed |
| Mantri Webcity3C | - | Ongoing | Jul 2017 | Not delivered |
| Mantri Webcity3B | - | Ongoing | Jul 2017 | Not delivered |
| Mantri Webcity3A | - | Ongoing | Jul 2017 | Not delivered |
| Mantri Webcity2A | - | Ongoing | Jul 2017 | Not delivered |
| Mantri Centrium | - | Ongoing | Jul 2017 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Mantri Webcity2B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Propcare Developers Private Limited
Propcare Developers Private Limited has 7 registrations on RERA Karnataka, including Mantri Centrium and Mantri Webcity3C. Its filings declare 8 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Mantri Webcity2B is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Mantri Webcity2B?
The registered promoter entity is Propcare Developers Private Limited, a company as per the filing. Its CIN U70102KA1990PTC027924 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Mantri Webcity2B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Mantri Webcity2B?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Mantri Webcity2B?
The professionals named in the filing: Architect: RSP; Engineer: NAGESH CONSULTANTS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mantri Webcity2B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback