RG-KA-18759 · RERA PRM/KA/RERA/1251/310/PR/171017/000505 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • 18 complaints at RERA Karnataka
  • Completion date moved by 92 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
Dec 2027Possession promisedmoved 92 months from the original
16 of 17Construction stages donefurthest along: Electrification, 98%
23 of 85Units unsoldnot recorded sold or booked
18Complaints at RERA Karnatakaon this registration
Jump to the 97 documents Report an error

Mantri Blossom1 is a Residential/Group Housing project by Gardenview Abode Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171017/000505 on 17 Oct 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 92 months from the original filing. 62 of the 85 units on this registration are recorded sold or booked, and 16 of 17 construction stages are filed complete. 18 complaints are on record with the regulator.

At a glance

Project

  • NameMantri Blossom1
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/171017/000505
  • ReraGenie IDRG-KA-18759

Builder

  • NameGardenview Abode Private Limited
  • Entity typeCompany
  • CINU45203KA2011PTC060228
  • Authorized SignatoryGirish Gupta H.S
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2017First promiseApr 2020Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Oct 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Apr 2020)
  • Buildings2 building records
  • Documents filed97 files

Current status

73%62 of 85 units booked
2.4%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---43043
B---42042

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 17 construction stages are filed complete. The stage furthest along is Electrification, at 98%.

Building: 100% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Retaining wall (All types)100%
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
RCC or MS Framed structure100%
Masonry construction: Bricks, Concrete blocks etc100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing98%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network100%
Weather Proof work(tile,concrete)100%
Painting100%
Elevation work100%
Internal and External work including landscapes as per santioned drawings100%

Progress on shared amenities41

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes98%
Internal Roads & FootpathsYes100%
Sewage and Drainage SystemYes100%
Parks & Tree plantingYes100%
Street LightingYes100%
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes100%
Solid waste management and disposalYes100%
Water conservationYes100%
Energy managementYes100%
Fire protection and fire safety requirementsYes100%
Education/Health/Other public amenitiesYes100%
Electricity supply transformer and substationYes100%
Emergency Evacuation servicesYes100%
Storm water drainsYes100%
Use of renewable energyYes100%
Water conservation/rain water harvesting/recharge of ground waterYes100%
ElectricityYes100%
Smart Home AutomationYes96%
CCTV SurveillanceYes100%
Club HouseYes100%
Community HallYes100%
Outdoor Sports facilityYes100%
Indoor Sports facilityYes100%
Swimming PoolYes98%
GymYes100%
ParksYes100%
Power BackupYes100%
GasYes100%
Water and SanitationYes100%
Air Conditioning And incerntionYes100%
StaircasesYes100%
LiftsYes100%
Staircases and Lift lobbies, corridor,lobbies, corridorYes100%
Fire escapesYes100%
Common entrance and exit for the building / common portico/foyer/verandahYes100%
BasementYes100%
TerraceYes98%
Outer WallYes100%
Open parking areas and common storage spacesYes100%
Provision for lodging of management staff and security staffYes100%
Water conservation and renewable energyYes100%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,267 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 214.61 cr
Cost incurredRs 5.17 cr
Spent of the estimate2.41%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 148.50 crRs 3.94 cr
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 51.26 cr-
On-site expenditure-Salaries of workersRs 4.45 cr-
On-site expenditure-Site OverheadRs 4.45 crRs 30.97 lakh
On-site expenditure-Consultants FeesRs 2.97 crRs 91.69 lakh
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 2.97 cr-

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Hafeez Contractor
EngineerMr. Praveen Kadam,

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionApr 2020 → Oct 2020

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/240418/000505Oct 2020 → Oct 2021

Reason as filed by the promoterFinancial crunch

ExtensionOct 2021 → Dec 2027

No reason recorded in the filing

Complaints filed with RERA Karnataka18

Case no.ComplainantRespondentFiled
CMP/190530/0003205-Mantri Gardenview Homes Private Ltd30/05/2019
CMP/210512/0007947-Mantri Gardenview Homes Private Ltd12/05/2021
00964/2023-Gardenview Abode Private Limited23/06/2023
01817/2023-Gardenview Abode Private Limited09/12/2023
01249/2025-Gardenview Abode Private Limited08/10/2025
01250/2025-Gardenview Abode Private Limited08/10/2025
01284/2025-Gardenview Abode Private Limited15/10/2025
01416/2025-Gardenview Abode Private Limited20/11/2025
01417/2025-Gardenview Abode Private Limited20/11/2025
01135/2026-Gardenview Abode Private Limited19/09/2026
01136/2026-Gardenview Abode Private Limited19/09/2026
01137/2026-Gardenview Abode Private Limited21/09/2026
01140/2026-Gardenview Abode Private Limited21/09/2026
01144/2026-Gardenview Abode Private Limited23/09/2026
01145/2026-Gardenview Abode Private Limited23/09/2026
01162/2026-Gardenview Abode Private Limited29/09/2026
01169/2026-Gardenview Abode Private Limited01/10/2026
01214/2026-Gardenview Abode Private Limited12/10/2026

Documents filed97

As listed on the registration, under the names the promoter filed them with; the newest 80 of 97 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171017/000505 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU Sep 26.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU Sep 26 Blossom 1.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU Sep 26 Blossom 1.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU June 26.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU June 26.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU June 26.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU March 26.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU March 26.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU March 26.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU Dec 25.pdf7 Mar 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU Dec 25.pdf7 Mar 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engieer Certificate QU Dec 25.pdf7 Mar 2026
Q3 2025-26 Water supply and sewage board7 Mar 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)7 Mar 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)7 Mar 2026
Q3 2025-26 KPTCL- BESCOM7 Mar 2026
Q3 2025-26 Fire and Safety7 Mar 2026
Q3 2025-26 Airport Authority of India7 Mar 2026
Q3 2025-26 BSNL/Telecommunication Department7 Mar 2026
CertificateFile: COI-MGHPL.PDF-
Project Details-
Architect Certificate for Work Completion Schedule till DateFile: Mantri Blossom 1 Architect Certificate-Work Done.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Mantri Blossom 1 Engineer Certificate-Work Done.pdf-
CA Certificate for Funds UtilizationFile: Mantri Blossom 1 CA certificate - funds Utilised.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Mantri Blossom 1 Architect Certificate - Work Pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Mantri Blossom 1 Engineer Certificate - Work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: Mantri Blossom 1 CA certificate - funds required.pdf-
AffidavitFile: Affidavit Seeking Exn of Registration.pdf-
Latest Encumbrance CertificateFile: 3 EC.pdf-
Details Of Sold/ Un-sold UnitsFile: SOLD & UNSOLD.xlsx-
Document 1File: Affidavit for Consent by Allotees.pdf-
Document 2File: Affidavit Seeking Exn of Registration.pdf-
Document 3File: FORM B.pdf-
Document 4File: 4 Bank Stat 2017 - 2020.pdf-
Blossom-CC 2015-
Approved Building Plan-
Approved Building Plan-
Customer Sale Deed-
Agreement of Construction - Page 1-
Sale deed-
Approved Section-
Approved Building Plan-
Blossom I - Allottment letter-
MGHPL-
BESCOM 2013-
Specifications and Amenities - Blossom-
Blossom - EC-
A&M Opinion-
FIRE 2013-
HAL 2012-
BESCOM 2013-
MODIFIED BWSSB NOC 27-9-2014-
KSPCB 2014-
MOEF- 2016-
BSNL 2013-
Balance Sheet 2015 - 2016File: Mantri Gardenview Homes- 2016-BS.pdf-
Balance Sheet 2014 - 2015File: Gardenview Homes- 2015-BS.pdf-
Balance Sheet 2013 - 2014File: Gardenview Homes _ 2014-BS.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Mantri Gardenview Homes- 2016-PL.pdf-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Mantri Blossom 2-OngoingJul 2017Not delivered

How this compares with Bengaluru Urban

73%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one moved by 92 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Mantri Blossom1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Gardenview Abode Private Limited

Gardenview Abode Private Limited has 2 registrations on RERA Karnataka, including Mantri Blossom1 and Mantri Blossom 2. Its filings declare 2 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Mantri Blossom1 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Mantri Blossom1?

The registered promoter entity is Gardenview Abode Private Limited, a company as per the filing. Its CIN U45203KA2011PTC060228 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Mantri Blossom1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Mantri Blossom1?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Mantri Blossom1?

The professionals named in the filing: Architect: Architect Hafeez Contractor; Engineer: Mr. Praveen Kadam,. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mantri Blossom1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mantri Blossom1. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mantri Blossom1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.