Red flags

  • 3 complaints at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Jun 2022Possession promisedmoved 9 months from the original
3Complaints at RERA Karnatakaon this registration
Jump to the 66 documents Report an error

Mantri Blossom 2 is a Residential/Group Housing project by Gardenview Abode Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171017/000507 on 17 Oct 2017. Possession is promised by 29 Jun 2022. The completion date has moved by 9 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameMantri Blossom 2
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/171017/000507
  • ReraGenie IDRG-KA-46128

Builder

  • NameGardenview Abode Private Limited
  • Entity typeCompany
  • CINU45203KA2011PTC060228
  • Authorized SignatoryGirish Gupta HS
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2017First promiseSep 2021Revised toJun 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Oct 2017
  • Promised completion29 Jun 2022
  • Revised completionRevised to 29 Jun 2022 (originally 29 Sep 2021)
  • Buildings2 building records
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C---48048
D---96096

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,267 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 253.38 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Hafeez Contractor
EngineerMr. Praveen Kadam,

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionSep 2021 → Jun 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka3

Case no.ComplainantRespondentFiled
CMP/221119/0010369-Mantri Gardenview Homes Private Limited19/11/2022
00840/2025-Gardenview Abode Private Limited12/06/2025
01132/2026-Gardenview Abode Private Limited18/09/2026

Documents filed66

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171017/000507 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: COI-MGHPL.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Arch Cert for Work Completion till Date.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Eng Cert for Work Completion till Date.pdf-
CA Certificate for Funds UtilizationFile: CA Certificate for Funds Utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arch Cert for Pending Work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Eng Cert for Pending Work.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate for Funds required.pdf-
AffidavitFile: Affidavit For Seeking Extension.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Consent letter from 2/3rd of AllotteesFile: Affidavit 2by3 Consent.pdf-
Details Of Sold/ Un-sold UnitsFile: Blossom II SoldUnsoldDetails.xlsx-
Document 1File: Section 3 1 Affidavit.pdf-
Document 2File: BESCOM NOC.pdf-
Document 3File: BSNL NOC.pdf-
Document 4File: Fire NOC.pdf-
Document 5File: HAL NOC.pdf-
Document 6File: KSPCB NOC.pdf-
Document 7File: MODIFIED BWSSB NOC.PDF-
Document 8File: MOEF NOC.pdf-
Document 9File: Form B Affidavit.pdf-
Document 10File: Commence Certificate.PDF-
Document 11File: Modified Sanction plan.pdf-
Document 12File: Reason for delay.pdf-
Document 13File: Remodified Sanction Plan.pdf-
Blossom-CC 2015-
Approved Building Plan-
Approved Building Plan-
Customer Sale Deed-
Agreement of Construction - Page 1-
Sale deed-
Approved Section-
Approved Building Plan-
Blossom II - Allottment letter-
MGHPL-
BESCOM 2013-
Specifications and Amenities - Blossom-
Blossom - EC-
A&M Opinion-
FIRE 2013-
HAL 2012-
BESCOM 2013-
MODIFIED BWSSB NOC 27-9-2014-
KSPCB 2014-
MOEF- 2016-
BSNL 2013-
Balance Sheet 2015 - 2016File: Mantri Gardenview Homes- 2016-BS.pdf-
Balance Sheet 2014 - 2015File: Gardenview Homes- 2015-BS.pdf-
Balance Sheet 2013 - 2014File: Gardenview Homes _ 2014-BS.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Mantri Gardenview Homes- 2016-PL.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Gardenview Homes- 2015-PL.pdf-
Audited Profit and Loss Statement 2013 - 2014File: Gardenview Homes _ 2014-PL.pdf-
Director's Report 2015 - 2016File: Mantri Gardenview Homes- 2016-DR.pdf-
Director's Report 2014 - 2015File: Gardenview Homes- 2015-DR.pdf-
Director's Report 2013 - 2014File: Gardenview Homes _ 2014-DR.pdf-
Cash Flow Statement 2015 - 2016File: Mantri Gardenview Homes- 2016-CFS.pdf-
Cash Flow Statement 2014 - 2015File: Gardenview Homes- 2015-CFS.pdf-
Auditor's Report 2015 - 2016File: Mantri Gardenview Homes- 2016-AR.pdf-
Auditor's Report 2014 - 2015File: Gardenview Homes- 2015-AR.pdf-
Auditor's Report 2013 - 2014File: Gardenview Homes _ 2014-AR.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITRV-AY-20161-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITRV-AY-2015-16.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: ITRV-AY-2014-15.pdf-
Mantri Blossom 2 - Form B-
Prospectus/BrochureFile: Blossom-Brochure.pdf-
Advertisement Copy 1File: Mantri Home Rush - Hindu Jacket copy.pdf-
Tower Excel SheetFile: 1-PRM_KA_RERA_1251_310_PR_171017_000507-Mantri Blossom 2.xlsx-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Mantri Blossom 1-OngoingJul 2017Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Mantri Blossom 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Gardenview Abode Private Limited

Gardenview Abode Private Limited has 2 registrations on RERA Karnataka, including Mantri Blossom1 and Mantri Blossom 2. Its filings declare 2 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Mantri Blossom 2 is delayed beyond 29 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Mantri Blossom 2?

The registered promoter entity is Gardenview Abode Private Limited, a company as per the filing. Its CIN U45203KA2011PTC060228 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Mantri Blossom 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Mantri Blossom 2?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Mantri Blossom 2?

The professionals named in the filing: Architect: Architect Hafeez Contractor; Engineer: Mr. Praveen Kadam,. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mantri Blossom 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mantri Blossom 2. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mantri Blossom 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.