MANTHAN PARK

By UNITED BUILDCON

RG-MH-08492 · RERA P51100026409 · Last updated on MahaRERA portal: 23 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 78 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nanded registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedmoved 78 months from the original
28 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 90%
80 of 174Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 145 documents Report an error

MANTHAN PARK is a Residential / Group Housing project by UNITED BUILDCON in Nanded, Maharashtra, registered with MahaRERA as P51100026409 on 17 Sep 2020. Possession is promised by 31 Mar 2029. The completion date has moved by 78 months from the original filing. 94 of the 174 units on this registration are recorded sold or booked, and 28 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMANTHAN PARK
  • TypeResidential / Group Housing
  • Location
    • MOUJE VAZIRABAD
    • NANDED
    • Nanded Waghala (M Corp.)
    • 431601
  • Pincode431601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51100026409
  • ReraGenie IDRG-MH-08492

Builder

  • NameUNITED BUILDCON
  • Entity typePartnership
  • PartnersKISHOR MADHUSUDANJI LAHOTI, DNYANESHWAR RAMBHAU KADAM
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredSep 2020First promiseSep 2022Revised toMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Sep 2020
  • Promised completion31 Mar 2029
  • Revised completionRevised to 31 Mar 2029 (originally 30 Sep 2022)
  • Buildings4 building records
  • Documents filed145 files

Current status

54%94 of 174 units booked
49.0%Work done, per cost certificate

Figures as on 23 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BHAGYASHREENA7640040
PRAGATINA7640040
VAISHANVINA7747047
YASHNA7747047

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

BHAGYASHREE100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PRAGATI73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
VAISHANVI66%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
YASH47%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Closed/Covered64
BuildingClosed/CoveredTotal
BHAGYASHREE1616
PRAGATI1616
VAISHANVI1616
YASH1616

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,000 sq m
Land owned byThe promoter
Named landowners1
LandownerVillageDistrict
MANTHAN PARK SAHKARI GRUH NIRMAN SANSTHANanded Waghala (M Corp.)Nanded

Approvals and building plan

Sanctioning authorityNANDED WAGHALA CITY MUNICIPAL CORPORATION
Permissible FSI10206.0
Proposed, not sanctioned10,206 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIP ROAD NANDED
Estimated costRs 33.85 cr
Cost incurredRs 16.60 cr
Work done49.04%
BuildingWingEstimatedIncurred
VAISHANVINARs 9.92 crRs 1.30 cr
YASHNARs 9.92 crRs 1.29 cr
BHAGYASHREENARs 7.01 crRs 7.01 cr
PRAGATINARs 7.01 crRs 7.01 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectsatish chitalkar
ArchitectAshish S Bhandge
EngineerSatish Chitalkar
EngineerSatyanarayan S Dudhmal
Chartered Accountantsarfaraz naviwala
Chartered AccountantMayur Praful Agrawal
PartnerRole in project
UNITED BUILDCON-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51100012620Sep 2022 → Mar 2025

Reason as filed by the promoterWE HAVE FACED LABOUR PROBLEM DUE TO CORONA AND RAIN. WE HAVE NOT ACCEPTED ANY BOOKING TILL DATE AS WE WERE NOT SURE ABOUT THE MARKET DUE TO COVID. NOW WE ARE READY TO ACCEPT BOOKING AND COMPLETE THE PROJECT WITHIN PROPOSED TIME LIMIT.

EXT51100028099Sep 2022 → Mar 2029

Reason as filed by the promoterThe delay in completion of the Manthan Park project (RERA Reg. No. P51100026409) occurred due to multiple unforeseen and uncontrollable circumstances, including the delayed receipt of the Commencement Certificate for Buildings VAISHNAVI (C1 & C2) and YASH (D1 & D2), which was issued only on 08.01.2024 due to regulatory changes under the UDCPR that required revised FSI calculations, plan modifications, and re-approvals. The project was further affected by legal litigation related to the project land, during which construction activities had to be paused or slowed to maintain legal compliance; a

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502847Ramesh KesareUNITED BUILDCON14/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed145

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 145 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Q2 FY 25-26.pdf23 May 2026
Withdrawal Update Form 1File: From-1 Q3 FY 25-26.pdf23 May 2026
Withdrawal Update Form 2File: From-2 Q2 FY25-26.pdf23 May 2026
Withdrawal Update Form 2File: Form-2 Q3 FY 25-26.pdf23 May 2026
Withdrawal Update Form 3File: Form 3-_007_compressed.pdf23 May 2026
Withdrawal Update Form 3File: Form 3 Q3 FY 25-26 Final.pdf23 May 2026
Withdrawal Update Form 1File: Archiects Certificate.pdf22 May 2026
Withdrawal Update Form 1File: Form 1- Architecture Certificate June 25.pdf22 May 2026
Withdrawal Update Form 2File: Engineer Certificate_compressed.pdf22 May 2026
Withdrawal Update Form 2File: Form_2_-_Engineer_Certificate_Jun.pdf22 May 2026
Withdrawal Update Form 3File: Form-3_002.pdf22 May 2026
Withdrawal Update Form 3File: Form 3 Q1 25-26 new_compressed.pdf22 May 2026
Building plan approvalFile: B1-B2.pdf16 May 2025
Building plan approvalFile: A1-A2.pdf16 May 2025
Building Plan Approval (IOD)File: B1-B2.pdf16 May 2025
Building Plan Approval (IOD)File: A1-A2.pdf16 May 2025
Declaration in FORM BFile: Affidavit Cum Declaration FORM B.pdf13 May 2025
Declaration in FORM BFile: Affidavit Cum Declaration Society.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold-booked Inventory.pdf13 May 2025
Other - TechnicalFile: Declaration cum Undertaking softcopy.pdf13 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf13 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf13 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form 5 24-25.pdf13 May 2025
Declaration in FORM BFile: Affidavit Cum Declaration FORM B.pdf13 May 2025
Declaration in FORM BFile: Affidavit Cum Declaration Society.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold-booked Inventory.pdf13 May 2025
Other - TechnicalFile: Declaration cum Undertaking softcopy.pdf13 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf13 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf13 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form 5 24-25.pdf13 May 2025
Building plan approvalFile: block 1_11zon.pdf12 May 2025
Building plan approvalFile: block 2_11zon.pdf12 May 2025
Building plan approvalFile: block 3_11zon.pdf12 May 2025
Building plan approvalFile: block 4_11zon.pdf12 May 2025
Building plan approvalFile: block 1_11zon.pdf12 May 2025
Building plan approvalFile: block 2_11zon.pdf12 May 2025
Building plan approvalFile: block 3_11zon.pdf12 May 2025
Building plan approvalFile: block 4_11zon.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 22.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 25.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 24.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 24.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 24.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec23.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 23.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 23.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 23.pdf12 May 2025
Commencement Certificates / NA Order for plotted developmentFile: UB PERMISSION PRAGATI AND BHAGYASHRI.pdf12 May 2025
Building Plan Approval (IOD)File: block 1_11zon.pdf12 May 2025
Building Plan Approval (IOD)File: block 2_11zon.pdf12 May 2025
Building Plan Approval (IOD)File: block 3_11zon.pdf12 May 2025
Building Plan Approval (IOD)File: block 4_11zon.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Discloure Of Sold Inventory.pdf12 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Adobe Scan 12 May 2025.pdf12 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A_001.pdf12 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A_003.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 22.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 25.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 24.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 24.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 24.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec23.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 23.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 23.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 23.pdf12 May 2025
Commencement Certificates / NA Order for plotted developmentFile: UB PERMISSION PRAGATI AND BHAGYASHRI.pdf12 May 2025
Building Plan Approval (IOD)File: block 1_11zon.pdf12 May 2025
Building Plan Approval (IOD)File: block 2_11zon.pdf12 May 2025
Building Plan Approval (IOD)File: block 3_11zon.pdf12 May 2025
Building Plan Approval (IOD)File: block 4_11zon.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Discloure Of Sold Inventory.pdf12 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Adobe Scan 12 May 2025.pdf12 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A_001.pdf12 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A_003.pdf12 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 23.pdf10 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 23.pdf10 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 5 22-23.pdf10 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 23.pdf10 May 2025

How this compares with Nanded

54%of this project is bookeddistrict median 6%
3%of Nanded projects moved their completion datethis one moved by 78 months
25%of Nanded registrations have lapsed or been cancelledthis one is on the register

Computed across the 100+ Nanded projects on ReraGenie, from their own filings.

Keep MANTHAN PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NANDED100+ in Nanded

2 kmMANTHAN PARKCompleted 7Lapsed / revoked 2Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: UNITED BUILDCON

UNITED BUILDCON has 2 registrations on MahaRERA, including MANTHAN PARK and Nayantara Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nanded district page.

Frequently asked questions

What are my rights if MANTHAN PARK is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANTHAN PARK?

The registered promoter entity is UNITED BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANTHAN PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MANTHAN PARK?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MANTHAN PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANTHAN PARK?

The professionals named in the filing: Architect: satish chitalkar; Architect: Ashish S Bhandge; Engineer: Satish Chitalkar; Engineer: Satyanarayan S Dudhmal; Chartered Accountant: sarfaraz naviwala; Chartered Accountant: Mayur Praful Agrawal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANTHAN PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANTHAN PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANTHAN PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.