Red flags

  • Completion date moved by 44 months
  • 3 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2024Possession promisedmoved 44 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 133 documents Report an error

MANIKCHAND 117FF is a Residential/Group Housing project by Rajarajeshware builddcon private limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/170915/000063 on 15 Sep 2017. Possession is promised by 31 Mar 2024. The completion date has moved by 44 months from the original filing.

At a glance

Project

  • NameMANIKCHAND 117FF
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/170915/000063
  • ReraGenie IDRG-KA-18769

Builder

  • NameRajarajeshware builddcon private limited
  • Entity typeCompany
  • Authorized SignatoryRAMANLAL M SHA

Key dates

this monthRegisteredSep 2017First promiseJul 2020Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Sep 2017
  • Promised completion31 Mar 2024
  • Revised completionRevised to 31 Mar 2024 (originally 31 Jul 2020)
  • Buildings1 building record
  • Documents filed133 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-1(Manikchand)---1140114

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 30 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 30 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,712 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 97.08 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKEMBHAVI ARCHITECTURE FOUNDATION
EngineerPrasad Consultants

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJul 2020 → not stated

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/220711/000063not stated → Apr 2022

Reason as filed by the promoterApplied for modification

ExtensionApr 2022 → Mar 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed133

As listed on the registration, under the names the promoter filed them with; the newest 80 of 133 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/170915/000063 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
BESCOM_Final Approval LetterFile: BESCOM_Final Approval for Service.pdf30 Nov 2022
BESCOM_Final Approval Service letter for all Floor_as per modification of the planFile: BESCOM_Service Approval for 28 Floors.pdf30 Nov 2022
BWSSB_Final Approval & Service letterFile: BWSSB_Final Approval for Service.pdf30 Nov 2022
Building drawingS 1 OF 5File: Building drawing_1.pdf17 Feb 2022
Building drawingS 2 OF 5File: Building drawing_2.pdf17 Feb 2022
Building drawingS 3 OF 5File: Building drawing_3.pdf17 Feb 2022
Building drawingS 4 OF 5File: Building drawing_4.pdf17 Feb 2022
Building drawingS 5 OF 5File: Building drawing_5.pdf17 Feb 2022
consent letters of 2/3rd allottees_1-10File: Consent letters-1-10.pdf17 Feb 2022
consent letters of 2/3rd allottees_11-20File: Consent letters-11-20.pdf17 Feb 2022
consent letters of 2/3rd allottees_21-26File: Consent letters-21-26.pdf17 Feb 2022
BESCOM LetterFile: BESCOM Letter.pdf17 Feb 2022
Power Sanction LetterFile: Power sanction.pdf17 Feb 2022
Airport Authority_NOCFile: AIRPORT.pdf17 Feb 2022
BSNL_NOCFile: BSNL-NOC.pdf17 Feb 2022
BWSSB LetterFile: BWSSB Letter.pdf17 Feb 2022
FIRE_NOCFile: Fire-25_compressed.pdf17 Feb 2022
Covid extension certificateFile: 1_1_1_Rera Extn-PRMKARERA1251310PR170915000063.pdf17 Feb 2022
RERA registration certificateFile: 1_1_RERA Certificate.pdf17 Feb 2022
revised form -B mentioning revised end date in RERA prescribed formFile: 1_2_Affidavit cum Declaration FORM B.pdf17 Feb 2022
New Building Licence for 25 FloorsFile: 2_1_Building licence 25 floors.pdf17 Feb 2022
commencement certificateFile: 2_1_Commencement Certificate (CC).pdf17 Feb 2022
KSPCB_NOCFile: 2_3_1_CFO consent (KSPCB).pdf17 Feb 2022
SEIAA-MOEF_NOCFile: 2_3_SEIAA-MOEF.pdf17 Feb 2022
Absract Unit DetailsFile: 3_1_ABSRACT OF SOLD AND UNSOLD DETAILS.pdf17 Feb 2022
Project Members DetailsFile: 3_2_Project member details.pdf17 Feb 2022
Development Details_BHK WiseFile: 3_3_Development details- BHK wise.pdf17 Feb 2022
Cost DetailsFile: 3_4_cost of details.pdf17 Feb 2022
Project SpecificationFile: 3_5_Project Specifications.pdf17 Feb 2022
Affidiavt with regards to Delay CompensationFile: 3_6_Affidavit dealy compensation.pdf17 Feb 2022
Engineer CertificateFile: 3_8_Engineers Certificate.pdf17 Feb 2022
STP Drawing & LayoutFile: 3_9_STP drawing & layout.pdf17 Feb 2022
Performa of AOS as per GOKFile: 3_10_Agreement to Sell proforma.pdf17 Feb 2022
Performa of Sale DeedFile: 3_11_Sale Deed Proforma.pdf17 Feb 2022
Performa of AllotmentFile: 3_12_Allotment letter.pdf17 Feb 2022
sanctioned letter with Conditions & full copy of Plan sanction letter issued by planning authority.File: sanction letter with conditions.pdf9 Feb 2022
KSPCB NOC Letter with Clarification & DeclearationFile: CFO(KSPCB).pdf9 Feb 2022
BWSSB NOC Letter with Clarification & DeclearationFile: BWSSB Letter.pdf9 Feb 2022
SEIAA NOC Letter with Clarification & DeclearationFile: SEIAA Letter.pdf9 Feb 2022
SEIAA NOCFile: SEIAA.pdf9 Feb 2022
BESCOM Power Sanction LetterFile: Power sanction.pdf9 Feb 2022
BESCOM NOC Letter with Clarification & DeclearationFile: BESCOM Letter.pdf9 Feb 2022
consent letters of 2/3rd Allottees_1- 10 NosFile: Consent letters-1-10 Allottes.pdf9 Feb 2022
consent letters of 2/3rd Allottees_11- 20 NosFile: Consent letters-11-20 Allottes.pdf9 Feb 2022
consent letters of 2/3rd Allottees_21- 26 NosFile: Consent letters-21-26 Allottes.pdf9 Feb 2022
Certificate from Registered Engineer indicating the structural safety of the building.File: Stability Certificate.pdf9 Feb 2022
Modified Building license letter issued by planning authorityFile: Modified Building License Letter.pdf11 Jan 2022
Applied for extension (Screenshot)File: Project Extension Submission.PNG11 Jan 2022
Abstract of Sold and unsold detailsFile: Abstract of Sold and Unsold.pdf11 Jan 2022
BESCOM Power Sanction LetterFile: Power sanction.pdf11 Jan 2022
Proforma Agreement of Sale (AOS) notified by Govt. of KarnatakaFile: Agreement to Sell proforma.pdf11 Jan 2022
Proforma sale deed as notified by GOKFile: Sale Deed Proforma.pdf11 Jan 2022
STP DrawingsFile: STP Drawings.pdf11 Jan 2022
Board ResolutionFile: Board Resolution.pdf11 Jan 2022
KSPCB NOC Request LetterFile: Pollution Control Board.jpg11 Jan 2022
Clarification with regards to the renewal of NOCFile: Covering Letter.pdf11 Jan 2022
Chartered Accountant CertificateFile: Modification- CA certificate.pdf30 Dec 2021
Commencement certificateFile: Commencement certificate.pdf30 Dec 2021
Relinquishment DeedFile: Relinquishment deed.pdf30 Dec 2021
Breakup development details as per registered planFile: Development details as per Registered plan.pdf30 Dec 2021
Breakup details with flat size and numbers as per Modified planFile: Total No sold & unsold units with sizes.pdf30 Dec 2021
Abstract of Sold and unsold detailsFile: Absract of Sold & Unsold details.pdf30 Dec 2021
FIRE FORCEFile: Fire-25_compressed.pdf30 Dec 2021
AIRPORTFile: AIRPORT.pdf30 Dec 2021
BESCOMFile: BESCOM.pdf30 Dec 2021
BWSSBFile: BWSSB.pdf30 Dec 2021
KSPCBFile: KSPCB.pdf30 Dec 2021
SEIAAFile: SEIAA.pdf30 Dec 2021
BSNLFile: BSNL-NOC.pdf30 Dec 2021
CertificateFile: Registration certificate.pdf-
Project Details-
Already registered project ongoing detailsFile: ongoing details.pdf-
Modified plan details site plan, floor plans, Plan Licence LetterFile: License-25Floors.pdf-
Elevation, Sections, Specifications ( If changes are there )File: ELEVATION & SECTION.pdf-
List Of AllotteesFile: List of allottee.pdf-
Consent LetterFile: Consent_Letter_Compressed_5mb.pdf-
Chartered Accountant CertificateFile: Form 4, RMD_Modification- CA_compressed.pdf-
Notarized AffidavitFile: Notarized Affidavit.pdf-
Engineer CertificateFile: Form-6_Engg_Modification.pdf-
Architect CertificateFile: FORM 5_Arch_Modification.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 44 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep MANIKCHAND 117FF on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmMANIKCHAND 117FFOther 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: Rajarajeshware builddcon private limited

Rajarajeshware builddcon private limited has 1 registration on RERA Karnataka, including MANIKCHAND 117FF. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if MANIKCHAND 117FF is delayed beyond 31 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MANIKCHAND 117FF?

The registered promoter entity is Rajarajeshware builddcon private limited, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MANIKCHAND 117FF?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at MANIKCHAND 117FF?

The professionals named in the filing: Architect: KEMBHAVI ARCHITECTURE FOUNDATION; Engineer: Prasad Consultants. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANIKCHAND 117FF?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANIKCHAND 117FF. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANIKCHAND 117FF to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.