Home / Browse projects / Mumbai Suburban, Maharashtra / Manhattan Residency (A4) - 15th to 18th Floor
Manhattan Residency (A4) - 15th to 18th Floor
By Rare Townships Private Limited
RG-MH-76366 · RERA P51800000733 · Last updated on MahaRERA portal: 18 Aug 2026
Source: official MahaRERA filing
Red flags
- 4 complaints at MahaRERA
- Completion date moved by 18 months
- 2 extensions taken
- Rs 296.00 crore secured on the land, in favour of SWAMIH Investment Fund
- The charge is held by SWAMIH Investment Fund, a distressed-debt buyer or stressed-asset fund rather than an originating lender
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Manhattan Residency (A4) - 15th to 18th Floor is a Residential / Group Housing project by Rare Townships Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000733 on 23 Jul 2017. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 18 months from the original filing. 16 of the 16 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 4 complaints are on record with the regulator.
At a glance
Project
- NameManhattan Residency (A4) - 15th to 18th Floor
- TypeResidential / Group Housing
- Location
- Mankhurd Ghatkopar Link Road
- Ghatkopar East
- Ghatkopar
- Kurla
- Mumbai Suburban
- 400077
- Pincode400077
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800000733
- ReraGenie IDRG-MH-76366
Builder
- NameRare Townships Private Limited
- Entity typeCompany
- DirectorsShrenik Rasik Mehta, Dattatreya V Prabhu
- Other registrations15 more →
- Completed9 of 16
- No longer live5 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 Jul 2017
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed146 files
Current status
Figures as on 18 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Rising City - Manhattan Residency - 15 TO 18 Floor | NA | 4 | 4 | 16 | 0 | 16 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Rising City - Manhattan Residency - 15 TO 18 Floor: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 95% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed26
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Rising City - Manhattan Residency - 15 TO 18 Floor | NA | Rs 6.75 cr | Rs 6.72 cr |
| - | NA | Rs 47.00 lakh | Rs 45.00 lakh |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Citygold Management Service Private Limited |
| Architect | AAKAR ARCHITECTS (Mr. UMESH PAWAR) |
| Engineer | PANDURANG MOHITE |
| Engineer | JW Consultant LLP (Mr.Achyut Watve) |
| Chartered Accountant | Sanket R Shah & Associates Chartered Accountants |
| Chartered Accountant | NDDA & ASSOCIATES LLP CHARTERED ACCOUNTANT |
| Chartered Accountant | Maloo Rathod and Company |
| Chartered Accountant | Niraj D. Adatia & Associates |
| Partner | Role in project |
|---|---|
| Rare Townships Private Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterApplication for extension under Rule 6 of MahaRERA Act, 2016.
Reason as filed by the promoterDelay was due to oversight by the concerned team
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000199268 | Dr. Arun Vasantray Sheth | Rare Townships Private Limited | 03/12/2021 |
| CC006000000530685 | RARE TOWNSHIPS PRIVATE LIMITED | Dr. Arun Vasantray Sheth | 15/06/2024 |
| CC12600066 | RARE TOWNSHIPS PRIVATE LIMITED | Mr Sanjay Trivedi | 05/01/2026 |
| CC12600067 | RARE TOWNSHIPS PRIVATE LIMITED | Mrs Rupal Kishor Vyas | 05/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Aug 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Mar 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed146
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: A4-A5- Full OC.pdf | 18 Aug 2026 |
| Form 2A (FY 2025-2026)File: Manhatten 15th to 18th floor.pdf | 31 Jul 2026 |
| Withdrawal Update Form 1File: FORM - I P51800000733 - RTPL MANHATTAN RESIDENCY (A4) 15TH TO 18TH FLOORS.pdf | 29 Jul 2026 |
| Withdrawal Update Form 2File: FORM-II A4 - 15th to 18th Floor.pdf | 29 Jul 2026 |
| Withdrawal Update Form 3File: FORM - III A4-P2 signed.pdf | 29 Jul 2026 |
| Withdrawal Update Form 1File: FORM - I P51800000733 - RTPL MANHATTAN RESIDENCY (A4) 15TH TO 18TH FLOORS.pdf | 28 May 2026 |
| Withdrawal Update Form 2File: FORM - II -15th to 18th FL.pdf | 28 May 2026 |
| Withdrawal Update Form 3File: Form III - Manhattan Residency (A4) (Mar-26) - 15th to 18th Flr.pdf | 28 May 2026 |
| Layout approvalFile: A4-P2- HIGHLIGHTED NEW SACNTIONED LAYOUT.pdf | 31 Mar 2026 |
| Withdrawal Update Form 1File: PHASE_2_P51800000733_FORM_1_RTPL MANHATTAN RESIDENCY (A4) 15TH TO 18TH FLOORS.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: PHASE_2_P51800000733_FORM_2_RTPL MANHATTAN RESIDENCY (A4) 15TH TO 18TH FLOORS.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: RTPL-Manhattan Residency (A4)- 15th to 18th floor.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: P51800000733 - RTPL MANHATTAN RESIDANCY (A4) 15 TH TO 18TH FLOORS.pdf | 27 Nov 2025 |
| Withdrawal Update Form 2File: Tower_A4_-_15_to_18th_Flr[1].pdf | 27 Nov 2025 |
| Withdrawal Update Form 3File: FORM-III_RTPL_A4_1518F.pdf | 27 Nov 2025 |
| Form 5 (FY 2024-2025)File: FORM5 - A4-1518th FL.pdf | 5 Oct 2025 |
| Form 1File: P51800000733 - RTPL MANHATTAN RESIDENCY (A4) 15TH TO 18TH FLOORS.pdf | 14 Aug 2025 |
| Form 2File: Form II_Manhattan Residency-15th to 18th floor.pdf | 14 Aug 2025 |
| Form 3File: CA Form III_Manhattan Residency_15th to 18th floor.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Manhattan Residency_15th to 18th floor.pdf | 14 Aug 2025 |
| Form 1File: P51800000733 - RTPL MANHATTAN RESIDENCY (A4) 15TH TO 18TH FLOORS.pdf | 29 May 2025 |
| Form 2File: Manhattan Residency (A4) - 15th to 18th Floor.pdf | 29 May 2025 |
| Form 3File: RTPL Form 3 A4-PH-2-31-03-25.pdf | 29 May 2025 |
| Certificates of CA (Form 3)File: RTPL Form 3 A4-PH-2-31-03-25_compressed.pdf | 22 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800000733 - RTPL MANHATTAN RESIDENCY (A4) 15TH TO 18TH FLOORS.pdf | 30 Apr 2025 |
| Certificates of CA (Form 3)File: RTPL Form 3 A4-PH-2-31-12-24_compressed.pdf | 30 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Manhattan Residency (A4) - 15th to 18th Floor.pdf | 30 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Manhattan Residency (A4) - 15th to 18th Floor.pdf | 30 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800000733 - RTPL MANHATTAN RESIDENCY (A4) 15TH TO 18TH FLOORS.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: A4-Phase II.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RTPL Form 5 A4-PH-2-31-03-24.pdf | 14 Nov 2024 |
| Certificates of CA (Form 3)File: RTPL Form 3 A4-PH-2-30-09-24.pdf | 22 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A4-Ph-II.pdf | 19 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 A-4 Flr 15 to 18.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Documents of sold-Man 2.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A4-PH-II.pdf | 20 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A-4 Flr 15 to 19.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Manhattan Residency_Ph II.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: RTPL Form 3 A4-PH-2-30-06-24.pdf | 20 Jul 2024 |
| Certificates of CA (Form 5)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) (2).pdf | 6 Jun 2024 |
| Certificates of CA (Form 5)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (4).pdf | 6 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: RTPL Sale CC - Revalidated till 10022025.pdf | 3 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MR - 2.pdf | 3 May 2024 |
| Building plan approvalFile: RTPL- Amended building plan approval 29122023.pdf | 25 Apr 2024 |
| Building plan approvalFile: A4-PH-II-LAYOUT_compressed.pdf | 25 Apr 2024 |
| Building plan approvalFile: A4-PH-II-BUA_compressed.pdf | 25 Apr 2024 |
| Layout approvalFile: A4-PH-II-LAYOUT_compressed.pdf | 25 Apr 2024 |
| Details of encumbrancesFile: Encumbrance Certificate-MR-2.pdf | 25 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: A4-PH-II-LAYOUT_compressed.pdf | 25 Apr 2024 |
| Building Plan Approval (IOD)File: RTPL- Amended building plan approval 29122023.pdf | 25 Apr 2024 |
| Building Plan Approval (IOD)File: A4-PH-II-LAYOUT_compressed.pdf | 25 Apr 2024 |
| Building Plan Approval (IOD)File: A4-PH-II-BUA_compressed.pdf | 25 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: FCC-03012024.pdf | 25 Apr 2024 |
| Declaration about Commencement CertificateFile: A4-PH-II.pdf | 25 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A4-II.pdf | 25 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A-4-MR-15 to 18.pdf | 25 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Seperate bank account letters-MR-2.pdf | 25 Apr 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200303820330_Manhattan Residency.pdf | 25 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: A4-Phase_2.pdf | 25 Apr 2024 |
| Certificates of CA (Form 3)File: RTPL Form 3 A4-PH-2-31-12-23_compressed.pdf | 25 Apr 2024 |
| Certificates of CA (Form 3)File: RTPL Form 3 A4-PH-2-31-03-24.pdf | 25 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest_SM.pdf | 25 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest_DVP.pdf | 25 Apr 2024 |
| Proforma of Agreement for saleFile: A4-AFS.pdf | 25 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate bank account letters-MR-2.pdf | 25 Apr 2024 |
| Other - FinanceFile: Merged documents_MR 2.pdf | 25 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: A-4 15 to 18.pdf | 5 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A4-II.pdf | 1 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: RTPL Sale CC - Revalidated till 10022025.pdf | 22 Feb 2024 |
| Building plan approvalFile: RTPL- B1 Ammendement approval 29122023.pdf | 21 Feb 2024 |
| Building plan approvalFile: Drawing 01-08_11zon.pdf | 21 Feb 2024 |
| Building plan approvalFile: Drawing 09-15_11zon.pdf | 21 Feb 2024 |
| Building plan approvalFile: Drawing 16-22_11zon.pdf | 21 Feb 2024 |
| Building plan approvalFile: Drawing 23-29_11zon.pdf | 21 Feb 2024 |
| Layout approvalFile: Layout plan-rtpl.pdf | 21 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: Layout plan-rtpl.pdf | 21 Feb 2024 |
| Building Plan Approval (IOD)File: RTPL- B1 Ammendement approval 29122023.pdf | 21 Feb 2024 |
| Building Plan Approval (IOD)File: Drawing 01-08_11zon.pdf | 21 Feb 2024 |
| Building Plan Approval (IOD)File: Drawing 09-15_11zon.pdf | 21 Feb 2024 |
| Building Plan Approval (IOD)File: Drawing 16-22_11zon.pdf | 21 Feb 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 15 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 146 filed documents as one ZIP, foldered, with a manifest
Keep Manhattan Residency (A4) - 15th to 18th Floo on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ghatkopar East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 340 registered projects within 2 km.
Mahindra Rainforest Phase 1
Anthurium Developers Limited
Mahindra Rainforest Phase 2
Anthurium Developers Limited
CRYSTAL PRIME MERIDIAN
ARYAMAAN DEVELOPERS PRIVATE LIMITED
AARADHYA ONEPARK
MICL CREATORS LLP
CENTRONA ZEN-A
ELEVATED AVENUE REALTY LLP
CENTRONA ZEN-B
ELEVATED AVENUE REALTY LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Rare Townships Private Limited
Rare Townships Private Limited has 16 registrations on MahaRERA, including North Sea Heights (A1) - 19th floor and North Sea Heights (A1) - upto 14th floor. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Manhattan Residency (A4) - 15th to 18th Floor is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Manhattan Residency (A4) - 15th to 18th Floor?
The registered promoter entity is Rare Townships Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Manhattan Residency (A4) - 15th to 18th Floor?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Manhattan Residency (A4) - 15th to 18th Floor?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Manhattan Residency (A4) - 15th to 18th Floor?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Manhattan Residency (A4) - 15th to 18th Floor?
The professionals named in the filing: Architect: Citygold Management Service Private Limited; Architect: AAKAR ARCHITECTS (Mr. UMESH PAWAR); Engineer: PANDURANG MOHITE; Engineer: JW Consultant LLP (Mr.Achyut Watve); Chartered Accountant: Sanket R Shah & Associates Chartered Accountants; Chartered Accountant: NDDA & ASSOCIATES LLP CHARTERED ACCOUNTANT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Manhattan Residency (A4) - 15th to 18th Floor?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback