Home / Browse projects / Bengaluru Urban, Karnataka / MANE-BS49

Registration approved No litigation declared Residential/Group Housing project

MANE-BS49

By Eternity Structures Private Limited

RG-KA-87211 · RERA PRM/KA/RERA/1251/472/PR/250825/008026 · Last updated on RERA Karnataka portal: 19 Jul 2025

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Apr 2028Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 72 documents Report an error

MANE-BS49 is a Residential/Group Housing project by Eternity Structures Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/250825/008026 on 25 Aug 2025. Possession is promised by 30 Apr 2028.

At a glance

Project

  • NameMANE-BS49
  • TypeResidential/Group Housing
  • Location
    • Yelahanka
    • Bengaluru Urban
    • 560064
  • Pincode560064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/472/PR/250825/008026
  • ReraGenie IDRG-KA-87211

Builder

  • NameEternity Structures Private Limited
  • Entity typeCompany
  • CINU70100KA2012PTC062336
  • GSTIN29AADCE0079K1ZF
  • Authorized SignatoryK Vijaya Prasad Reddy
  • DirectorsK Vijaya Prasad Reddy, K Vijaya Prasad Reddy
  • Project HeadK Vijaya Prasad Reddy

Key dates

this monthRegisteredAug 2025PromisedApr 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on25 Aug 2025
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1---1140114

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 19 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 19 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,248 sq m
Named landowners1
LandownerVillageDistrict
M Muniswamy--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 36.00 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 36.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnkith J
EngineerChethan Kumar
Chartered AccountantPhani & Bharadwaz

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed72

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/250825/008026 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Demarcated MapFile: Demarcated Village Map.jpg19 Jul 2025
CDPFile: Demarcted CDP.png20 Jun 2025
Sale Deed 1File: 49-1 20 G.pdf20 Jun 2025
Sale Deed 2File: 49-6 SD 3 Guntas.pdf20 Jun 2025
Sale Deed 3File: ABSOLUTE SALE DEED 49-8.pdf20 Jun 2025
Sale Deed 4File: 49-1 17 G.pdf20 Jun 2025
Building LicenceFile: BBMP01.pdf20 Jun 2025
Title FlowFile: Legal Opinion.pdf20 Jun 2025
PlanFile: Plan 1.pdf20 Jun 2025
Amalgamated Khata BBMPFile: BBMP.pdf20 Jun 2025
Amalgamation of Khata DocumentFile: AMALGAMATION OF KHATHAS.pdf20 Jun 2025
BBMP License VALIDFile: BBMP License.pdf20 Jun 2025
Basement PlanFile: Basement and Ground Floor Plan.pdf30 May 2025
ECFile: EC 01_merged.pdf30 May 2025
Approved PlanFile: Plan 1.pdf30 May 2025
Section PlanFile: Section and Elevation Plan.pdf30 May 2025
Building LicenceFile: BBMP01.pdf30 May 2025
RTCFile: RTC Eternity.pdf30 May 2025
CDP DemarcatedFile: Demarcted CDP.png30 May 2025
BESCOM FeeFile: BESCOM Fee Paid Receipt.pdf30 May 2025
Engineer LicenceFile: Engi Lice.pdf30 May 2025
Engineer CertificateFile: Form-3 engineer Certificate Eternity.pdf30 May 2025
Water NOCFile: BWSSB NOC.pdf30 May 2025
AOSFile: Agreement of Sale Proforma.pdf30 May 2025
Form BFile: Form B.pdf30 May 2025
JD AffidavitFile: JD Affidavit.pdf30 May 2025
No Litigation AffidavitFile: No Litigation Affidavit.pdf30 May 2025
Sec 3 AffidavitFile: Sec 3 Affidavit.pdf30 May 2025
SpecificationsFile: Specifications.pdf30 May 2025
MRFile: M&R.pdf30 May 2025
Legal OpinionFile: Legal Opinion.pdf30 May 2025
Sale DeedFile: Sale deed - 1897.pdf30 May 2025
Sale DeedFile: Sale deed - 7297.pdf30 May 2025
Sale DeedFile: Sale deed doc Masti - 3431.pdf30 May 2025
KhataFile: BBMP.pdf30 May 2025
Land COstFile: Guidline Value.pdf30 May 2025
KSPCB STPFile: KSPCB NOC.pdf30 May 2025
Allotment LetterFile: Allotment Letter.pdf30 May 2025
Registration CertificateFile: Certificate of Incorporation.pdf-
Memorandum of AssociationFile: Certificate of Incorporation.pdf-
Article of AssociationFile: Certificate of Incorporation.pdf-
GST CertificateFile: Eternity GST Final.pdf-
Certificate issued by CA Form 1File: Form 1 CA.pdf-
Certificate issued by Architect Form 2File: Form-2 Architect Certificate Eternity.pdf-
Certificate issued by Engineer Form 3File: Form-3 engineer Certificate Eternity.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: No Litigation Affidavit.pdf-
Balance Sheet 2023 - 2024File: Balance Sheet.pdf-
Balance Sheet 2022 - 2023File: Balance Sheet.pdf-
Balance Sheet 2021 - 2022File: Balance Sheet.pdf-
Audited Profit and Loss Statement 2023 - 2024File: Additional Information.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Additional Information.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Eternity Additional Information.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: AY2024-25.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: AY 2023-24.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: AY2022-23.pdf-
Auditor's Report 2023 - 2024File: Auditor Report.pdf-
Auditor's Report 2022 - 2023File: Auditor Report.pdf-
Auditor's Report 2021 - 2022File: Auditor Report.pdf-
BBMP01-
Plan 1-
Section and Elevation Plan-
Agreement of Sale Proforma-
AllotmentLetter-
Form B-
Sec 3 Affidavit-
JD Affidavit-
m&G-
BWSSB NOC-
KSPCB NOC-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep MANE-BS49 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmMANE-BS49Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: Eternity Structures Private Limited

Eternity Structures Private Limited has 1 registration on RERA Karnataka, including MANE-BS49. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if MANE-BS49 is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MANE-BS49?

The registered promoter entity is Eternity Structures Private Limited, a company as per the filing. Its CIN U70100KA2012PTC062336 and GSTIN 29AADCE0079K1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MANE-BS49?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at MANE-BS49?

The professionals named in the filing: Architect: Ankith J; Engineer: Chethan Kumar; Chartered Accountant: Phani & Bharadwaz. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANE-BS49?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANE-BS49. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANE-BS49 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.