MANA VERDANT TERRACES
By MANA PROJECTS PRIVATE LIMITED
RG-KA-95547 · RERA PRM/KA/RERA/1251/446/PR/041225/008303 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
MANA VERDANT TERRACES is a Residential/Group Housing project by MANA PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/041225/008303 on 4 Dec 2025. Possession is promised by 31 Dec 2031. 41 of the 318 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameMANA VERDANT TERRACES
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560035
- Pincode560035
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/041225/008303
- ReraGenie IDRG-KA-95547
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on4 Dec 2025
- Promised completion31 Dec 2031
- Revised completionNone
- Buildings2 building records
- Documents filed190 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | - | - | - | 159 | 0 | 159 |
| Tower 2 | - | - | - | 159 | 0 | 159 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 50%.
Building: 4% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 50% |
| Foundation footing work | 15% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 11% |
| Sewage and Drainage System | Yes | 12% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 5% |
| Energy management | Yes | 3% |
| Fire protection and fire safety requirements | Yes | 2% |
| Solid waste management and disposal | Yes | 8% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 3% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership9
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Bhagyamma | - | - |
| Mana projects pvt ltd | - | - |
| Gowramma | - | - |
| MANA PROJECTS PVT LTD Its managing Director D Kishore Reddy | - | - |
| Guramma | - | - |
| Chandra Reddy | - | - |
| Munireddy | - | - |
| MANA PROJECTS PVT LTD Represented by managing D KISHORE REDDY Director | - | - |
| MANA PROJECTS PVT LTD Represented by managing D KISHORE REDDY Director | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 302.00 cr | Rs 14.82 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 25.50 cr | Rs 1.49 cr |
| On-site expenditure-Site Overhead | Rs 11.00 cr | Rs 1.02 cr |
| On-site expenditure-Consultants Fees | Rs 7.00 cr | Rs 2.00 lakh |
| On-site expenditure-Salaries of workers | Rs 5.00 cr | Rs 3,930 |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 2.50 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | jayant Vaitha |
| Engineer | Ambrish G |
| Chartered Accountant | Krishna Reddy Gundluri |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed190
As listed on the registration, under the names the promoter filed them with; the newest 80 of 190 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/041225/008303 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 C A MVT RERA (QU) 30-09-2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form -5 Architect MVT RERA (QU) 30-09-2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi MVT RERA (QU) 30-09-2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 C A MVT (QU) 30-06-2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form -5 Archt MVT (QU) 30-06-2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi MVT (QU) 30-06-2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 C A MVT (QU) 31-03-2026.pdf | 29 Jun 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form -5 Archt MVT (QU) 31-03-2026.pdf | 29 Jun 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi MVT (QU) 31-03-2026.pdf | 29 Jun 2026 |
| Q4 2025-26 Water supply and sewage board | 29 Jun 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 29 Jun 2026 |
| Q4 2025-26 KPTCL- BESCOM | 29 Jun 2026 |
| Q4 2025-26 Fire and Safety | 29 Jun 2026 |
| Q4 2025-26 Airport Authority of India | 29 Jun 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 29 Jun 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: RERA -Form 4 CA MVT (QU) 31-12-2025.pdf | 19 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: RERA -Form 5 ARCHT MVT (QU) 31-12-2025.pdf | 19 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi MVT (QU) 31-12-2025.pdf | 19 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 19 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 19 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 19 Feb 2026 |
| Q3 2025-26 Fire and Safety | 19 Feb 2026 |
| Q3 2025-26 Airport Authority of India | 19 Feb 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 19 Feb 2026 |
| 1) ACC- (CA) RERA-form -01File: Acc-1-Form 1 - C A RERA REG Certificate Mana Verdant Terrraces.pdf | 2 Dec 2025 |
| 2) ACC- Bank AffidavitFile: Acc-2-BANK AFFIDAVIT 02-12-2025.pdf | 2 Dec 2025 |
| 3) ACC- Sources of fundsFile: Acc-3-Mana Verdant Terrace- Souce of funds.pdf | 2 Dec 2025 |
| 1) Thasildhar - MR showing flow of title SY NO 21/3File: SL no - 1 Sy No 21-3 - MR H6-2019-20.pdf | 2 Dec 2025 |
| 1) Thasildhar - MR showing flow of title SY NO 21/4File: SL no - 1 Sy No 21-4 - MR 9-2003-04.pdf | 2 Dec 2025 |
| 1) Thasildhar - MR showing flow of title SY NO 161File: SL no - 1 Sy No 161 MR SALE DEED.pdf | 2 Dec 2025 |
| 1) Thasildhar - MR showing flow of title SY NO 162File: SL no - 1 Sy No 162 MR H 15.pdf | 2 Dec 2025 |
| 2) Title deed of current owner in sy no 21/2aFile: SL No - 2 Sy No 21-2A & 2B WILL Deed.pdf | 2 Dec 2025 |
| 2) Title deed of current owner in sy no 21/2BFile: SL No - 2 Sy No 21-2A & 2B WILL Deed.pdf | 2 Dec 2025 |
| 2) Title deed of current owner in sy no 21/4File: SL No - 2 SY NO 21-4 SALE DEED.pdf | 2 Dec 2025 |
| 2) As per Inheritance certificate katha transfer to Current Owner sy no 21/4File: SL no - 1 Sy No 21-4 - MR 9-2003-04.pdf | 2 Dec 2025 |
| 2) Title deed of current owner in sy no 21/6File: SL No - 2 Sy No 21-6 Inhertiance certificate.pdf | 2 Dec 2025 |
| Old Sy no is 21/1A after inhertance its phoded to new sy no 21/6 MRFile: Sy no 21 MR PHODI .pdf | 2 Dec 2025 |
| 2) Title deed of current owner in sy no 21/7File: SL No - 2 SY NO 21-7 8 Partition Deed.pdf | 2 Dec 2025 |
| 2) Old sy no 21/1A its meged to sy no 21 after it will phoded to new sy no 21/7 and 8File: Sy no 21-1 merged MR.pdf | 2 Dec 2025 |
| 2) phodi MR 21/7File: Sy no 21-6 7 8 MR PHODI.pdf | 2 Dec 2025 |
| 2) Title deed of current owner in sy no 21/8File: SL No - 2 SY NO 21-7 8 Partition Deed.pdf | 2 Dec 2025 |
| 2) Title deed of current owner in sy no 161File: SL No - 2 SY NO 161 SALE DEED.pdf | 2 Dec 2025 |
| 2) Title deed of current owner in sy no 162File: SL No - 2 SY NO 162 SALE DEED.pdf | 2 Dec 2025 |
| 3) EC from 1-4-2010 to till date Sy no 21/BFile: EC 2004 to till date SY NO 21-2B .pdf | 2 Dec 2025 |
| 3) EC from 1-4-2010 to till date Sy no 21/3File: SL No -3 Sy No 21-3 Ec 2004 to till date.pdf | 2 Dec 2025 |
| 3) EC from 1-4-2010 to till date Sy no 21/4File: EC 2004 TO TILL DATE SY NO 21-4.pdf | 2 Dec 2025 |
| 3) EC from 1-4-2010 to till date old sy no 21 new Sy no 21/6File: EC 2004 TO TILL DATE SY NO 21-6.pdf | 2 Dec 2025 |
| 3) EC from 1-4-2010 to till date Sy no 161File: EC 2004 TO TILL DATE SY NO 161.pdf | 2 Dec 2025 |
| 3) EC from 1-4-2010 to till date Sy no 162File: EC 2004 TO TILL DATE SY NO 162.pdf | 2 Dec 2025 |
| 4) Clarifiacation of JDA and Promoter current land owner of sy no 21/4 161 162File: SL No - 4 Clarification Letter to RERA(MANA VERDANT TERRACES).pdf | 2 Dec 2025 |
| 5) Notarized Non-litigation AffidavitFile: SL No - 5 NON LITIGATION AFFIDAVIT MPPL.pdf | 2 Dec 2025 |
| 6) Notarized Form-B affidavitFile: SL No - 6 FORM B - AFFIDAVIT.pdf | 2 Dec 2025 |
| 7) Propsed All sy no E KathaFile: SL No - 7 E Katha All Sy Nos.pdf | 2 Dec 2025 |
| 1) Building LicenseFile: SL No - 1 Building licences.pdf | 2 Dec 2025 |
| )ADLR Certified survey sketchFile: SL No - 2 ADLR Survey Sketch.pdf | 2 Dec 2025 |
| 3) Location of the project demarcation of land dedicatedFile: SL No - 3 GOOGLE MAP MANA VERDANTH TERRACESS.pdf | 2 Dec 2025 |
| 3) Location of the project demarcation of land dedicatedFile: SL No - 3 Project location decmocration of land alo.pdf | 2 Dec 2025 |
| 4) Demarcation of proposed land in Approved Master planFile: SL No - 4 Masater plan CDP MANA VERDANTH TERRACESS.pdf | 2 Dec 2025 |
| 5) Demarcation of proposed land in original Village mapFile: SL No - 5 VILLAGE MAP MANA VERDANTH TERRACESS.pdf | 2 Dec 2025 |
| 5) Demarcation of proposed land in original Village mapFile: SL No - 5 Doddkanehalli village map.pdf | 2 Dec 2025 |
| 1) Project address is updatedFile: SL NO - 1 upadated the project address in project details.pdf | 2 Dec 2025 |
| 2) Project Cost details as per CA certificate and engineer certificate.File: Form 1 - C A certificate.pdf | 2 Dec 2025 |
| 2) Project Cost details as per CA certificate and engineer certificate.File: SL NO - 4 Form -3 Engineer RERA REG Certificate - Mana Verdant Terraces (1).pdf | 2 Dec 2025 |
| 3) Engineer certificate form-3File: SL NO - 4 Form -3 Engineer RERA REG Certificate - Mana Verdant Terraces (1).pdf | 2 Dec 2025 |
| 4) Structural stability certificateFile: SL No - 2 Structural and stablity certicate.pdf | 2 Dec 2025 |
| 4) Structural Engineer self attached certificateFile: SL NO 4 Structural Engineer Self attached Certificate.pdf | 2 Dec 2025 |
| 5) Project specificationsFile: SL NO - 5 Project specifications.pdf | 2 Dec 2025 |
| 6) Proforma of agreement (AFS)File: SL NO - 6 AGREEMENT FOR SALE MANA VERDANTH TERRACES.pdf | 2 Dec 2025 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| MANA DALE | Survey number 60/1, Sarjapur Extension , Kodathi Village ,Varthur Hobli , Bangalore East Taluk , Kodathi Village , Bengaluru East | Ongoing | Dec 2032 | Not due yet |
| mana vista | Sy no 191, Sy no 190/1, 190/2, 190/3, and 190/4 Gattahalli Village, Sarjapura hobli, Anekal Taluk, , Banglaore Urban District, Bangalore. , Anekal , Bengaluru Urban, Karnataka - 560099 | Ongoing | Dec 2030 | Not due yet |
| mana cresta | Sy no 1/1 near govt school chikkanayakanahalli village varthuru hobli bangalore east taluk , Bangalore 560103 , Sy no 1/1 naer govt school chikkanayakanahalli village varthuru hobli bangalore east taluk , Bengaluru East | Ongoing | Dec 2028 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep MANA VERDANT TERRACES on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 44 registered projects within 2 km.
BIRLA EVARA
VARDHITA PROPERTIES PRIVATE LIMITED
DSR HIGHLAND GREENZ
DSR INFRA PROJECTS
TRIFECTA VANTO PHASE-1
TRIFECTA PROJECTS PRIVATE LIMITED
GODREJ LAKESIDE ORCHARD
Godrej Properties Limited
Adarsh Tropica (Phase-2)
ORCHIDS APARTMENTS PVT LTD
East Park Residences
Ramsons Trendsquares Realty LLP
See every Bengaluru Urban project, with the district possession charts
Builder: MANA PROJECTS PRIVATE LIMITED
MANA PROJECTS PRIVATE LIMITED has 4 registrations on RERA Karnataka, including MANA VISTA and MANA VERDANT TERRACES. Its filings declare 4 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if MANA VERDANT TERRACES is delayed beyond 31 Dec 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of MANA VERDANT TERRACES?
The registered promoter entity is MANA PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U45202KA2009PTC049111 and GSTIN 29AAFCM8997G1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in MANA VERDANT TERRACES?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at MANA VERDANT TERRACES?
The professionals named in the filing: Architect: jayant Vaitha; Engineer: Ambrish G; Chartered Accountant: Krishna Reddy Gundluri. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MANA VERDANT TERRACES?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.