Home / Browse projects / Bengaluru Urban, Karnataka / MANA SKANDA THE RIGHT LIFE T789

Registration approved No litigation declared Residential/Group Housing project

MANA SKANDA THE RIGHT LIFE T789

By NEOBUILD VENTURES LLP

RG-KA-13469 · RERA PRM/KA/RERA/1251/308/PR/210325/007611 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Dec 2029Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 80%
486 of 825Units unsoldnot recorded sold or booked
1Complaints at RERA Karnatakaon this registration
Jump to the 400 documents Report an error

MANA SKANDA THE RIGHT LIFE T789 is a Residential/Group Housing project by NEOBUILD VENTURES LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/210325/007611 on 21 Mar 2025. Possession is promised by 31 Dec 2029. 339 of the 825 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMANA SKANDA THE RIGHT LIFE T789
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/308/PR/210325/007611
  • ReraGenie IDRG-KA-13469

Builder

  • NameNEOBUILD VENTURES LLP
  • Entity typePartnership Firm
  • LLPINACA-3481
  • GSTIN29AAVFN0923E1Z2
  • Authorized SignatoryRachapalli Vijaya Kumar Reddy
  • Other registrations6 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredMar 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on21 Mar 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed400 files

Current status

41%339 of 825 units booked
6.6%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower No 7---2750275
TOWER 8---2750275
Tower 9---2750275

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 80%.

Building: 16% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work80%
Foundation footing work75%
Upto Plinth Level45%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)15%
Retaining wall (All types)2%
RCC or MS Framed structure30%
Masonry Construction15%
Plastering inside , outside & Ceiling12%
Joinery: Doors, Windows, Ventilators etc5%
Basic work of Water supply, Sanitary and Electrification8%
Dadoing, Skirting, Flooring, Tiles work (All types)5%
Railing and Grill fixing5%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes18%
Sewage and Drainage SystemYes18%
Water conservation/rain water harvesting/recharge of ground waterYes12%
Energy managementYes20%
Fire protection and fire safety requirementsYes18%
Solid waste management and disposalYes12%
Emergency Evacuation servicesYes14%
Internal Roads & FootpathsYes1%
Electricity supply transformer and substationYes2%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes25%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasYes0%
Water and SanitationYes0%
Air ConditioningYes0%
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership31

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners31
LandownerVillageDistrict
C. Umashankar--
C DHANASHEKAR--
HEMARAJ C--
C DHANASHEKHAR--
HEMARAJ C--
BHARGAV SUNIL KUMAR PARVATANENI--
RAMANOLTA SRI VARA LAKSHMI--
D R GAYATHRI--
SKANDAAVANI SHELTERS PVT LTD--
NEO BUILD VENTURES LLP--
SKANDA AVANI SHELTERS PVT. LTD--
SKANDA AVANI SHELTERS PVT. LTD--
SWAROOPA NAGA RAMANOLLA--
R.PRASANA--
R.PRASANA--
SKANDA AVANI SHELETERS PVT LTD--
GAYATRI D R--
K C V MADHUKAR--
SKANDAAVANI SHELTERS PVT LTD--
SKANDAAVANI SHELTERS PVT LTD--
MANNE UDAYA SWAPNA--
SKANDAAVANI SHELTERS PVT LTD--
N S REVATHI--
K C V MADHUKAR--
RACHAPALLI VIJAYA KUMAR REDDY--
N SHEKAR REDDY--
R LOKESH--
LOKESH R--
B A JAGANNATHA REDDY--
KHATA RAJASHEKHARA REDDY--
BHARGAVA SUNIL KUMAR PARVATHANENI--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 661.00 cr
Cost incurredRs 43.62 cr
Spent of the estimate6.6%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 532.00 crRs 22.16 cr
Admin and Marketing costRs 60.00 crRs 16.54 cr
Principal sum and interest payable to financial institutions-Scheduled BanksRs 30.00 crRs 2.27 cr
On-site expenditure-Site OverheadRs 14.00 cr-
On-site expenditure-Consultants FeesRs 12.00 crRs 79.61 lakh
On-site expenditure-Salaries of workersRs 8.00 crRs 67.64 lakh
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 5.00 cr-
Payment of taxes-Rs 1.17 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnup Naik
EngineerPARAMESH GOWDA M R
Chartered AccountantKrishna Reddy Gundluri

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00738/2026-NEOBUILD VENTURES LLP24/06/2026

Documents filed400

As listed on the registration, under the names the promoter filed them with; the newest 80 of 400 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/210325/007611 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 C A MSTRL -T789 RERA (QU) 30-09-2026-Finall.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form -5 Archt MSTRL -T789 RERA (QU) 30-09-2026-Final.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi MSTRL -T789 RERA (QU) 30-09-2026.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 C A MSTRL -T789 RERA (QU) 31-03-2026-Final.pdf15 Jul 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form -5 Archt MSTRL -T789 RERA (QU) 31-03-2026-Final.pdf15 Jul 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi MSTRL -T789 RERA (QU) 31-03-2026.pdf15 Jul 2026
Q4 2025-26 Water supply and sewage board15 Jul 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q4 2025-26 KPTCL- BESCOM15 Jul 2026
Q4 2025-26 Fire and Safety15 Jul 2026
Q4 2025-26 Airport Authority of India15 Jul 2026
Q4 2025-26 BSNL/Telecommunication Department15 Jul 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 C A MSTRL -T789 RERA (QU) 30-06-2026-Finall.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form -5 Archt MSTRL -T789 RERA (QU) 30-06-2026.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi MSTRL -T789 RERA (QU) 30-06-2026.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 C A MSTRL -T789 RERA (QU) 31-12-2025.pdf20 Feb 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form -5 Archt MSTRL -T789 RERA (QU) 31-12-2025.pdf20 Feb 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 ENGINEER RERA MSTRL -T789 (QU) 31-12-2025.pdf20 Feb 2026
Q3 2025-26 Water supply and sewage board20 Feb 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)20 Feb 2026
Q3 2025-26 KPTCL- BESCOM20 Feb 2026
Q3 2025-26 Fire and Safety20 Feb 2026
Q3 2025-26 Airport Authority of India20 Feb 2026
Q3 2025-26 BSNL/Telecommunication Department20 Feb 2026
Change the Poject Start date and project StatusFile: Changed The Project and ongoing status.pdf21 Mar 2025
the Form-6, Engineer certificate in the prescribed formatFile: Final Notice 2) Form-6-Enginner Certificate.pdf21 Mar 2025
the project section 3(1) notarized affidavitFile: Final Notice 3) Section-3- Notarised Affidavit.pdf21 Mar 2025
Sy No. 4/2-Absoulte Saled DeedFile: ABSOLUTE SALE DEED 4-2, Doc 2126_1999-2000.pdf18 Mar 2025
Sy No.- 4/5, 4/6, 4/7, 4/8 -Partition DeedFile: Partition Deed 4-5,6,7,8,.pdf18 Mar 2025
Sy No.-59/1, 59/2A, 60/4File: PARTITION DEED 59-1&2 & 60-4 Doc No- 13009-06-07.pdf18 Mar 2025
Sy.No.-19/2, 19/4-Release DeedFile: Release Deed 01311-2018-19 Sy No 19-2&4.pdf18 Mar 2025
JDA between landowner and developer for Sy No 60/4File: Rectification JDA Sy no 5 & 60-4.pdf18 Mar 2025
Sy No. 19/2-JDAFile: JDA 11539-2022-23 Sy no19-2.pdf18 Mar 2025
1)Approved Original Single Plot layout planFile: 1) Approved Single Plot Plan Approval-T789.pdf18 Mar 2025
2)Approved Original Single Plot layout plan order.File: 2) Sanction Letter and work order.pdf18 Mar 2025
3)Building License from Local Authority Original Copy.File: 3) Clarification of Building License.pdf18 Mar 2025
4)ADLR Certified survey sketch Certifying the Boundary of the Proposed landFile: 4) ADLR Survey Sketch-.pdf18 Mar 2025
5)Approved building planFile: 5) Building Approval Plan.pdf18 Mar 2025
6)Upload commencement certificate.File: 6) Sanction Letter and Intimation.pdf18 Mar 2025
7)Area/ No of units of KSPCB noc is not matching with sanction planFile: 7) Declaration on Approved Drawing Deails.pdf18 Mar 2025
8)Demarcation of proposed land in Approved Master plan Certified by the concern authority.File: 8) Demarcation of proposed land in Approved Master plan.pdf18 Mar 2025
9)Demarcation of proposed land in originalVillage map certified by the concern authority.File: 9) Demarcation of proposed land in originalVillage map.pdf18 Mar 2025
10)Approval/NOC under section 14 of the KTCP Act.File: 10) Clarification of KTCP Letter-.pdf18 Mar 2025
1) change the project start date according to actual date and change the project status toFile: SL No 1 Clarification of the project's ongoing status.pdf18 Mar 2025
2) the Engineer certificate in the prescribed format.File: SL No 2-Form-3-Engineer Certificate - MS TRL 7,8 & 9.pdf18 Mar 2025
3) the amenities and common area details properly on the project detail page and upload the calculatFile: SL No 3 Common Area Amenities Architect updated.pdf18 Mar 2025
4) the latest dated self-attested copy of the Engineer license certificate issued by the local DeveFile: SL No 4-Latest Date Self Attached Enginner Certificate.pdf18 Mar 2025
5) the project specification by incorporating the project Name and Project Address certified by theFile: SL No 5-Project Specifications Architect Attes.pdf18 Mar 2025
6) he project section 3(1) notarized affidavit.File: SL No 6-Section-3- Affidavit.pdf18 Mar 2025
7) proforma of the Allotment letter in the prescribed format.File: SL No 7-Allotment Letter MANA SKANDA THE RIGHT LIFE T789.pdf18 Mar 2025
8) pro forma of the Agreement for Sale.File: SL No 8-AGREEMENT FOR SALE-MANA SKANDA THE RIGHT LIFE T789Proforma.pdf18 Mar 2025
9) the two fire force NOC, Please clarify the same for two nocFile: SL No 9 Clarification of Fire NOC.pdf18 Mar 2025
10) the copy of the fee receipt paid towards the BESCOM and Water Supply NOCFile: SL No 10-BESCOM NOC - Fee Paid Reciept.pdf18 Mar 2025
12) specify the number of floors designed for the building in the statbility certificate in full detFile: SL No 12- Stability certificate .pdf18 Mar 2025
13) HAL NOCFile: SL No 13-HAL NOC.jpg18 Mar 2025
10) Clarification of Water NOC Fee ReceiptFile: SL No 10- Calarification Of Water NOC Fee Receipt.pdf18 Mar 2025
Clarification of Sy No. 60/4 measuring 1 Acre 34 GuntasFile: Clarification of Sy No 60-4 - 1 Acre 34 Guntas-.pdf18 Mar 2025
RTC, survey 4/2-
Mutation, survey 4/2-
Encumbrance Certificate, survey 4/2-
Conversion/Alienation Order, survey 4/2-
JDA, survey 4/2-
Khatha, survey 4/2-
RTC, survey 4/5-
Mutation, survey 4/5-
Encumbrance Certificate, survey 4/5-
Conversion/Alienation Order, survey 4/5-
JDA, survey 4/5-
Khatha, survey 4/5-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationStatusPromisedDelivered
THE RIGHT LIFESy No 4/3, Chikkavaderapura Village, Sarjapura Hobli, Anekal Taluk, Varthur,OngoingDec 2028Not due yet

How this compares with Bengaluru Urban

41%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep MANA SKANDA THE RIGHT LIFE T789 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: NEOBUILD VENTURES LLP

NEOBUILD VENTURES LLP has 7 registrations on RERA Karnataka, including MANA SKANDA THE RIGHT LIFE T10 & T11 and MANA SKANDA THE RIGHT LIFE T789. Its filings declare 6 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if MANA SKANDA THE RIGHT LIFE T789 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MANA SKANDA THE RIGHT LIFE T789?

The registered promoter entity is NEOBUILD VENTURES LLP, a partnership firm as per the filing. Its LLPIN ACA-3481 and GSTIN 29AAVFN0923E1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MANA SKANDA THE RIGHT LIFE T789?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MANA SKANDA THE RIGHT LIFE T789?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at MANA SKANDA THE RIGHT LIFE T789?

The professionals named in the filing: Architect: Anup Naik; Engineer: PARAMESH GOWDA M R; Chartered Accountant: Krishna Reddy Gundluri. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANA SKANDA THE RIGHT LIFE T789?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANA SKANDA THE RIGHT LIFE T789. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANA SKANDA THE RIGHT LIFE T789 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.