MANA JARDIN NEO
RG-KA-75981 · RERA PRM/KA/RERA/1251/446/PR/181223/006500 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
MANA JARDIN NEO is a Residential/Group Housing project by MANA CONSTRUCTIONS LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/181223/006500 on 18 Dec 2023. Possession is promised by 30 Dec 2032. 22 of the 78 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameMANA JARDIN NEO
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560037
- Pincode560037
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/181223/006500
- ReraGenie IDRG-KA-75981
Builder
- NameMANA CONSTRUCTIONS LLP
- Entity typePartnership Firm
- LLPINABZ-2650
- GSTIN29ABVFM6883H1Z8
- Authorized SignatoryD KISHORE REDDY
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Dec 2023
- Promised completion30 Dec 2032
- Revised completionNone
- Buildings2 building records
- Documents filed174 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER-A | - | - | - | 42 | 0 | 42 |
| TOWER-B | - | - | - | 40 | 0 | 40 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 98%.
Building: 35% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 98% |
| Foundation footing work | 98% |
| Upto Plinth Level | 98% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 90% |
| Retaining wall (All types) | 65% |
| RCC or MS Framed structure | 45% |
| Masonry Construction | 12% |
| Plastering inside , outside & Ceiling | 15% |
| Joinery: Doors, Windows, Ventilators etc | 15% |
| Basic work of Water supply, Sanitary and Electrification | 9% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 8% |
| Railing and Grill fixing | 8% |
| Electrification, Water supply and Sanitary Finishing | 17% |
| Painting | 8% |
| Fire prevention and fire fighting fitting and fixture with network | 25% |
| Weather Proof work(tile,concrete) | 8% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 8% |
| Internal and External work including landscapes as per sanctioned drawings | 8% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 48% |
| Sewage and Drainage System | Yes | 39% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 22% |
| Energy management | Yes | 25% |
| Fire protection and fire safety requirements | Yes | 40% |
| Solid waste management and disposal | Yes | 25% |
| Emergency Evacuation services | Yes | 22% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 18% |
| Storm water drains | Yes | 5% |
| Use of renewable energy | Yes | 5% |
| Sewage Treatment Plant (STP) | Yes | 35% |
| Parks & Tree planting | Yes | 2% |
| Street Lighting | Yes | 12% |
| Electricity | Yes | 14% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 32% |
| Club House | Yes | 12% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 22% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 16% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VENKATAMMA | - | - |
| VENKATAMMA | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 134.00 cr | Rs 3.67 cr |
| Payment of charges | Rs 10.30 cr | - |
| Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for construction | Rs 7.20 cr | Rs 53.47 lakh |
| On-site expenditure-Site Overhead | Rs 4.00 cr | Rs 39.85 lakh |
| On-site expenditure-Salaries of workers | Rs 2.50 cr | Rs 7,135 |
| On-site expenditure-Consultants Fees | Rs 2.00 cr | Rs 3.13 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 2.00 cr | Rs 24,500 |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Jayantilal Amrutlal Vaitha |
| Engineer | AMBRISH G |
| Chartered Accountant | KRISHNA REDDY GIUNDLURI |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed174
As listed on the registration, under the names the promoter filed them with; the newest 80 of 174 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/181223/006500 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 C A Mana Jardin Neo (QU) 30-9-2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Mana Jardin Neo (QU) 30-09-2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi Mana Jardin Neo (QU) 30-09-2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 C A Mana Jardin Neo (QU) 30-06-2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form -5 Archt Mana Jardin Neo (QU) 30-06-2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi Mana Jardin Neo (QU) 30-06-2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 C A Mana Jardin Neo (QU) 31-03-2026.pdf | 29 Jun 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form -5 Archt Mana Jardin Neo (QU) 31-03-2026.pdf | 29 Jun 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi Mana Jardin Neo (QU) 31-03-2026.pdf | 29 Jun 2026 |
| Q4 2025-26 Water supply and sewage board | 29 Jun 2026 |
| Q4 2025-26 KPTCL- BESCOM | 29 Jun 2026 |
| Q4 2025-26 Fire and Safety | 29 Jun 2026 |
| Q4 2025-26 Airport Authority of India | 29 Jun 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 29 Jun 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 C A Mana Jardin Neo (QU) 31-12-2025.pdf | 19 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form -5 Archt Mana Jardin Neo (QU) 31-12-2025.pdf | 19 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi Mana Jardin Neo (QU) 31-12-2025.pdf | 19 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 19 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 19 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 19 Feb 2026 |
| Q3 2025-26 Fire and Safety | 19 Feb 2026 |
| Q3 2025-26 Airport Authority of India | 19 Feb 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 19 Feb 2026 |
| Annuel Audit ReportFile: Annuel Audit Report.pdf | 14 Dec 2023 |
| Form1 C A RERA REG Certificate Mana Jardin NeoFile: Form1 C A RERA REG Certificate Mana Jardin Neo.pdf | 14 Dec 2023 |
| Mana Jardin Neo Estimation and Source of FundsFile: Mana Jardin Neo Estimation and Source of Funds.pdf | 14 Dec 2023 |
| QU Updates Request ManaFile: QU Updates Request Mana.pdf | 14 Dec 2023 |
| Affidavit_Non Litigation_AtttestedFile: Affidavit_Non Litigation_Atttested.pdf | 9 Dec 2023 |
| Agreement of Sale ProformaFile: Agreement of Sale Proforma.pdf | 9 Dec 2023 |
| ambrish Structural Engineer BBMP Certificate_AttestedFile: ambrish Structural Engineer BBMP Certificate_Attested.pdf | 9 Dec 2023 |
| Architect License Copy _ Jayant VaithaFile: Architect License Copy _ Jayant Vaitha.pdf | 9 Dec 2023 |
| COA Certificate_Jayant Vaitha - AttestedFile: COA Certificate_Jayant Vaitha - Attested.pdf | 9 Dec 2023 |
| Conversion Order Copy 194_3 & 195_3File: Conversion Order Copy 194_3 & 195_3.pdf | 9 Dec 2023 |
| Estimation and Source of Funds_AttestedFile: Estimation and Source of Funds_Attested.pdf | 9 Dec 2023 |
| Financials MPPL FY 202021File: Financials MPPL FY 202021.pdf | 9 Dec 2023 |
| Form1_CA RERA REG Certificate Mana Jardin NeoFile: Form1_CA RERA REG Certificate Mana Jardin Neo.pdf | 9 Dec 2023 |
| Jayant Vaitha_Director Principal ArchitectFile: Jayant Vaitha_Director Principal Architect.pdf | 9 Dec 2023 |
| Land cost calculation sheet_AttestedFile: Land cost calculation sheet_Attested.pdf | 9 Dec 2023 |
| Letter Water thru tankersFile: Letter Water thru tankers.pdf | 9 Dec 2023 |
| MANA JARDIN NEO _ RERA Form 2File: MANA JARDIN NEO _ RERA Form 2.pdf | 9 Dec 2023 |
| MANA JARDINFile: MANA JARDIN.pdf | 9 Dec 2023 |
| MPPL Financials FY 201920File: MPPL Financials FY 201920.pdf | 9 Dec 2023 |
| MPPL FINANCIALS FY 202122File: MPPL FINANCIALS FY 202122.pdf | 9 Dec 2023 |
| Quarterly Update Details Mana Verdant June 2023File: Quarterly Update Details Mana Verdant June 2023.pdf | 9 Dec 2023 |
| Quarterly Update Details UVII June 2023 (1)File: Quarterly Update Details UVII June 2023 (1).pdf | 9 Dec 2023 |
| Quarterly Update Details UVII June 2023File: Quarterly Update Details UVII June 2023.pdf | 9 Dec 2023 |
| Quarterly Update Details UVII March 2023File: Quarterly Update Details UVII March 2023.pdf | 9 Dec 2023 |
| RERA Quartely Details UVIIFile: RERA Quartely Details UVII.pdf | 9 Dec 2023 |
| Section 3(1)_AtttestedFile: Section 3(1)_Atttested.pdf | 9 Dec 2023 |
| Single Plot Layout OrderFile: Single Plot Layout Order.pdf | 9 Dec 2023 |
| Single Plot LayoutFile: Single Plot Layout.pdf | 9 Dec 2023 |
| Site and Basement-1 Plan_compressedFile: Site and Basement-1 Plan_compressed.pdf | 9 Dec 2023 |
| Specification document_Architect CertifiedFile: Specification document_Architect Certified.pdf | 9 Dec 2023 |
| Sy no 195_3 E kathaFile: Sy no 195_3 E katha.pdf | 9 Dec 2023 |
| RERA Queries - 4 Dec 2023File: RERA Queries - 4 Dec 2023.pdf | 9 Dec 2023 |
| RERA Quarterly Details Mana VerdantFile: RERA Quarterly Details Mana Verdant.pdf | 9 Dec 2023 |
| RERA Quarterly Details Macasa EmeraldFile: RERA Quarterly Details Macasa Emerald.pdf | 9 Dec 2023 |
| Sale Deed 194_3 and 195_3File: Sale Deed 194_3 and 195_3.pdf | 9 Dec 2023 |
| AC Order RA (BE) 104 of 2013_14File: AC Order RA (BE) 104 of 2013_14.pdf | 9 Dec 2023 |
| Relinquishment DeedFile: Relinquishment Deed.pdf | 9 Dec 2023 |
| UdayavaniFile: Udayavani.pdf | 9 Dec 2023 |
| RTC, survey 194/3 | - |
| Mutation, survey 194/3 | - |
| Encumbrance Certificate, survey 194/3 | - |
| Conversion/Alienation Order, survey 194/3 | - |
| JDA, survey 194/3 | - |
| Khatha, survey 194/3 | - |
| RTC, survey 195/3 | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep MANA JARDIN NEO on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 41 registered projects within 2 km.
MAITHRI SPRINGWOODS
MAITHRI DEVELOPERS
Century Mirai Ph1
Century Silicon City Private Limited
MYHNA ORCHID
MYHNA ESTATE PROJECTS
INNOVATIVE PALACIA
SHUBANKARA DEVELOPERS
Saideep Hiranya
Shri Saideep Srinidhi Buildcon LLP
77° LIFE
DivyaSree Infrastructure Projects Private
See every Bengaluru Urban project, with the district possession charts
Builder: MANA CONSTRUCTIONS LLP
MANA CONSTRUCTIONS LLP has 1 registration on RERA Karnataka, including MANA JARDIN NEO. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if MANA JARDIN NEO is delayed beyond 30 Dec 2032?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of MANA JARDIN NEO?
The registered promoter entity is MANA CONSTRUCTIONS LLP, a partnership firm as per the filing. Its LLPIN ABZ-2650 and GSTIN 29ABVFM6883H1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in MANA JARDIN NEO?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at MANA JARDIN NEO?
The professionals named in the filing: Architect: Jayantilal Amrutlal Vaitha; Engineer: AMBRISH G; Chartered Accountant: KRISHNA REDDY GIUNDLURI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MANA JARDIN NEO?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.