Home / Browse projects / Bengaluru Urban, Karnataka / Maker Meridian
Maker Meridian
RG-KA-93346 · RERA PRM/KA/RERA/1251/309/PR/240822/005182 · Last updated on RERA Karnataka portal: 19 Aug 2022
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Maker Meridian is a Commercial project by Indiabuild Homes Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/240822/005182 on 24 Aug 2022. Possession is promised by 31 Dec 2024.
At a glance
Project
- NameMaker Meridian
- TypeCommercial
- Location
- Bengaluru North
- Bengaluru Urban
- 560008
- Pincode560008
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/240822/005182
- ReraGenie IDRG-KA-93346
Builder
- NameIndiabuild Homes Pvt Ltd
- Entity typeCompany
- CINU70200KA2010PTC055370
- GSTIN29AACCI5152L1ZA
- Authorized SignatoryAmit Garg
- DirectorsAmit Garg, Amit Garg, Deepak C Betageri
- Project HeadRajarathinam
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on24 Aug 2022
- Promised completion31 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed127 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Maker Meridian | - | - | - | 0 | 4 | 4 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 19 Aug 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 19 Aug 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership12
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| H Vinod Kumar | - | - |
| Komala H | - | - |
| Raghavendra Hanumantha Gowda | - | - |
| H Venkatalakshmamma | - | - |
| Chandravathi S | - | - |
| Manjula S | - | - |
| S Srinivas | - | - |
| G Kempamma | - | - |
| G Jayamma | - | - |
| G Kamakshi | - | - |
| Shanthamma G | - | - |
| H Harish Gowda | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 24.50 cr | - |
| On-site expenditure-Consultants Fees | Rs 48.23 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Thomas Consultants |
| Engineer | Design Tree Consultants |
| Chartered Accountant | Pinky G Bhonsley |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed127
As listed on the registration, under the names the promoter filed them with; the newest 80 of 127 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/240822/005182 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| BESCOM NOC with fee paid receiptFile: BESCOM NOC with fee paid receipt.pdf | 19 Aug 2022 |
| Final Notice ResponseFile: 1 Final Notice Response.pdf | 14 Aug 2022 |
| Partition DeedFile: 2 Partition Deed.pdf | 14 Aug 2022 |
| Property CardFile: 3 Property Card.pdf | 14 Aug 2022 |
| PT SheetFile: 4 PT Sheet.pdf | 14 Aug 2022 |
| Khatha ExtractFile: 5 Khatha Extract.pdf | 14 Aug 2022 |
| Advocate Search Report markedFile: 6 Advocate Search Report marked.pdf | 14 Aug 2022 |
| Joint Development AgreementFile: 7 Joint Development Agreement.pdf | 14 Aug 2022 |
| Building LicenseFile: 8 Building License.pdf | 14 Aug 2022 |
| Basement Floor Plan sheet 1File: 9 Basement Floor Plan sheet 1.pdf | 14 Aug 2022 |
| Ground Floor Plan sheet 2File: 10 Ground Floor Plan sheet 2.pdf | 14 Aug 2022 |
| Typical Floor Plan 1 to 3 sheet 3File: 11 Typical Floor Plan 1 to 3 sheet 3.pdf | 14 Aug 2022 |
| Site Plan Sheet 4File: 12 Site Plan Sheet 4.pdf | 14 Aug 2022 |
| Section and Elevation Plan sheet 5File: 13 Section and Elevation Plan sheet 5.pdf | 14 Aug 2022 |
| Village MapFile: 14 Village Map.pdf | 14 Aug 2022 |
| CDP ExtractFile: 15 CDP Extract.pdf | 14 Aug 2022 |
| Relinquishment Deed 20-03-2019File: 16 Relinquishment Deed 20-03-2019.pdf | 14 Aug 2022 |
| Electricity NOCFile: 18 Electricity NOC.pdf | 14 Aug 2022 |
| Proforma Agreement of SaleFile: 17 Proforma Agreement of Sale.pdf | 14 Aug 2022 |
| partition deed 1016/2010-11 as mentioned by promoterFile: 1 D_30_Partition_Deed_1016_10-11_Dt_02-12-2010.pdf | 28 Jul 2022 |
| Katha CertificateFile: 2 D_32_Khatha_Certificate_Dt_18-02-2016.pdf | 28 Jul 2022 |
| Katha ExtractFile: 2 D_33_Khatha_Extract_Dt_18-02-2016.pdf | 28 Jul 2022 |
| single plot layoutFile: Plot layout.pdf | 28 Jul 2022 |
| single plot layout Order/ Sanction letterFile: Sanction letter.pdf | 28 Jul 2022 |
| Extract of master plan Showing the Road WideningFile: Plot layout.pdf | 28 Jul 2022 |
| Showing the Road WideningFile: Road widening.pdf | 28 Jul 2022 |
| Clarification on cost detailsFile: Costing Details_MM.pdf | 28 Jul 2022 |
| Proforma of Agreement for saleFile: AGS Final Draft Ulsoor.pdf | 28 Jul 2022 |
| Sanctioned floor plans 1st to 3rd floorFile: Sanction plan Part wise.pdf | 28 Jul 2022 |
| Query ClarificationFile: Query Clarification.pdf | 28 Jul 2022 |
| BESCOM NOC ClarificationFile: BESCOM NOC letter.pdf | 28 Jul 2022 |
| 2018-19 Profit and loss accountFile: Profit and Loss.pdf | 8 Jul 2022 |
| 2018-19 balance sheetFile: Balance sheet.pdf | 8 Jul 2022 |
| 2018-19 auditors reportFile: Audit Report.pdf | 8 Jul 2022 |
| 2018-19 Cash flow statementFile: Cash Flow Statement.pdf | 8 Jul 2022 |
| 2018-19 Director's reportFile: IBH_Board Report_2018-19.pdf | 8 Jul 2022 |
| 2018-19 ITRFile: ITR Acknow FY 2018-19.pdf | 8 Jul 2022 |
| 2019-20 Balance sheetFile: Balancesheet.pdf | 8 Jul 2022 |
| 2019-20 Profit & LossFile: Profit and Loss.pdf | 8 Jul 2022 |
| 2019-20 Cashflow statementFile: Cash Flow Statement.pdf | 8 Jul 2022 |
| 2020-21 Balance sheetFile: Balancesheet.pdf | 8 Jul 2022 |
| 2020-21Profit & LossFile: Profit and Loss.pdf | 8 Jul 2022 |
| 2020-21 Cashflow statementFile: Cash Flow Statement.pdf | 8 Jul 2022 |
| title deed to e gopalapaFile: 1 SD 543-67-68.pdf | 8 Jul 2022 |
| Clarification on RTC and MR and conversion orderFile: 2 RTC & MR.pdf | 8 Jul 2022 |
| EC from 01/05/2005 to upto dateFile: 3 EC.pdf | 8 Jul 2022 |
| Clarification on KathaFile: 4 Katha Clarification.pdf | 8 Jul 2022 |
| Advocate search reportFile: 5 JMP Title Report.pdf | 8 Jul 2022 |
| Building licenseFile: 9 Sanction letter.pdf | 8 Jul 2022 |
| project specificationFile: Ulsoor - Specifications .pdf | 8 Jul 2022 |
| Proforma of Agreement for SaleFile: AGS Final Draft Ulsoor.pdf | 8 Jul 2022 |
| Proforma of Allotment LetterFile: Allotment Letter DRAFT.pdf | 8 Jul 2022 |
| Section 3(1) notarized affidavitFile: Section(3)1.pdf | 8 Jul 2022 |
| Receipt paid towards BWSSB NOCFile: BWSSB Payment receipt.pdf | 8 Jul 2022 |
| STP demarcation site planFile: Ulsoor - STP location.pdf | 8 Jul 2022 |
| STP design drawingFile: TAM-ULSOOR - STP LAYOUT - 25 KLD - 07-05-2022--STP LAYOUT.pdf | 8 Jul 2022 |
| BESCOM NOCFile: BESCOM NOC.pdf | 8 Jul 2022 |
| Joint affidavitFile: Joint Affidavit1.pdf | 8 Jul 2022 |
| Village Map DemarcationFile: Tippini.pdf | 8 Jul 2022 |
| Master plan Showing the Road WideningFile: Site layout & Elevation.pdf | 8 Jul 2022 |
| Commencement CertificateFile: Extension for CC.jpeg | 8 Jul 2022 |
| Site Layout & Elevation DrawingFile: Site layout & Elevation.pdf | 8 Jul 2022 |
| Section DrawingFile: Section_1.pdf | 8 Jul 2022 |
| Basement floorFile: Basement.pdf | 8 Jul 2022 |
| Ground floorFile: Ground floor.pdf | 8 Jul 2022 |
| 1st to terrace floorFile: 1st to 3rd floor.pdf | 8 Jul 2022 |
| Single LayoutFile: Single Layout.png | 8 Jul 2022 |
| Registration CertificateFile: COI IB Homes.jpg | - |
| Organization StructureFile: Organisation Chart.pdf | - |
| Certificate issued by CA Form 1File: Form 1 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form -2 Architect (PR).pdf | - |
| Certificate issued by Engineer Form 3File: Eng Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non Litigation.pdf | - |
| Certificate from Chartered AccountFile: Form 1 CA Certificate.pdf | - |
| Balance Sheet 2020 - 2021File: FY 21-22.pdf | - |
| Balance Sheet 2019 - 2020File: Balance Sheet.pdf | - |
| Balance Sheet 2018 - 2019File: Balance Sheet & Notes.pdf | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| The Central Regency Address | Khatha No 0821, Sy No 11, Ambalipura Village, Varthur Hobli, Ward No 150, Mahadevapura Zone, Bangalore | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Maker Meridian on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 7 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Indiabuild Homes Pvt Ltd
Indiabuild Homes Pvt Ltd has 1 registration on RERA Karnataka, including Maker Meridian. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Maker Meridian is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Maker Meridian?
The registered promoter entity is Indiabuild Homes Pvt Ltd, a company as per the filing. Its CIN U70200KA2010PTC055370 and GSTIN 29AACCI5152L1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Maker Meridian?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Maker Meridian?
The professionals named in the filing: Architect: Thomas Consultants; Engineer: Design Tree Consultants; Chartered Accountant: Pinky G Bhonsley. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Maker Meridian?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback