MAITREE VAJRA
RG-KA-69225 · RERA PRM/KA/RERA/1251/446/PR/110526/008641 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
MAITREE VAJRA is a Residential/Group Housing project by MAITREE DEVELOPERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/110526/008641 on 11 May 2026. Possession is promised by 31 Mar 2028. 4 of the 50 units on this registration are recorded sold or booked, and 2 of 15 construction stages are filed complete.
At a glance
Project
- NameMAITREE VAJRA
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560035
- Pincode560035
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/110526/008641
- ReraGenie IDRG-KA-69225
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on11 May 2026
- Promised completion31 Mar 2028
- Revised completionNone
- Buildings1 building record
- Documents filed112 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Maitree Vajra | - | - | - | 50 | 0 | 50 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 15 construction stages are filed complete. The stage furthest along is Foundation footing work, at 90%.
Building: 43% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 80% |
| Foundation footing work | 90% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 90% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 60% |
| Masonry Construction | 35% |
| Plastering inside , outside & Ceiling | 2% |
| Joinery: Doors, Windows, Ventilators etc | 5% |
| Basic work of Water supply, Sanitary and Electrification | 40% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 5% |
| Electrification, Water supply and Sanitary Finishing | 40% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 30% |
| Sewage and Drainage System | Yes | 30% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 10% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | No | Not applicable |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 50% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 30% |
| Club House | No | Not applicable |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 60% |
| Lifts | Yes | 20% |
| Corridor/Lobbies | Yes | 40% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 20% |
| Basement | Yes | 80% |
| Terrace | Yes | 40% |
| Outer Wall | Yes | 30% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Vajramurthy. M | - | - |
| VAJRAMURTHY M, MUNIRAJAMMA, H V SMITHA PATIL, SANDEEP H V H V RASHMI, M VARALAKSHMI OTHERS | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 23.40 cr | Rs 6.34 cr |
| Payment of taxes | Rs 5.00 cr | Rs 4.26 lakh |
| Good Will and Non Refundable Amount | Rs 4.52 cr | Rs 4.15 cr |
| On-site expenditure-Salaries of workers | Rs 3.00 cr | Rs 65.71 lakh |
| On-site expenditure-Consultants Fees | Rs 2.50 cr | Rs 71.31 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 25.00 lakh | Rs 2.16 lakh |
| On-site expenditure-Site Overhead | Rs 19.00 lakh | Rs 75.40 lakh |
| Payment of fees | Rs 15.44 lakh | Rs 2.15 lakh |
| Payment of cess | Rs 10.22 lakh | - |
| Payment of Premiums | Rs 4.00 lakh | Rs 2.12 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MAHESH P |
| Engineer | VARA PRASAD |
| Chartered Accountant | KOPALLI MALLIKARJUNA & CO |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed112
As listed on the registration, under the names the promoter filed them with; the newest 80 of 112 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/110526/008641 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA_FORM 4_Q2_FY_26-27_Maitree.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Q2-26-27 MD Vajara Form-5 Architect.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Q2-26-27 MD Vajara form-6 Engineer-1.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: From 4 Chartered Accountants Certificate.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Q1-26-27 MD Vajara Form-5 Architect.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Q1-26-27 MD Vajara form-6 Engineer (1).pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| MR COPYFile: MR 2_1.pdf | 11 May 2026 |
| MR 2_1 TO 2_5File: MR.jpeg | 11 May 2026 |
| STRUCTURAL ENGINEER LICENSEFile: Structural Engineer Certificate.pdf | 7 May 2026 |
| TITTLE DEEDFile: AshwathNarayana Reddy Sale Deed.pdf | 7 May 2026 |
| RTCFile: 4 RTC.pdf | 7 May 2026 |
| MRFile: MR T 2.pdf | 7 May 2026 |
| Title Flow MergedFile: 1 Title Flow Merged.pdf | 27 Apr 2026 |
| Notarized affidavit_land acquisition Owner and BuilderFile: 2 Notarized affidavit_land acquisition Owner and Builder.pdf | 27 Apr 2026 |
| Advocate Search Report and Openion by KavithaFile: 3 Advocate Search Report and Openion by Kavitha.pdf | 27 Apr 2026 |
| RTC - Vajramurthy kids and WifeFile: 4 RTC - Vajramurthy kids and Wife.pdf | 27 Apr 2026 |
| Master Plan Single Layout Sie Plan Basement Floor and TerraceFile: 1 Master Plan Single Layout Sie Plan Basement Floor and Terrace.pdf | 27 Apr 2026 |
| Village Map_Sketch_mergedFile: 2 Village Map_Sketch_merged.pdf | 27 Apr 2026 |
| Water facilitie Emergency Services and Renewable EneryFile: 4 Water facilitie Emergency Services and Renewable Enery.pdf | 27 Apr 2026 |
| Common Area to Asscation updatedFile: 1 Common Area to Asscation updated.xlsx | 27 Apr 2026 |
| Stability Certificate From ArchitectureFile: 2 Stability Certificate From Architecture.pdf | 27 Apr 2026 |
| AFS Pessession date and escrow account detailsFile: 3 AFS Pessession date and escrow account details.pdf | 27 Apr 2026 |
| STP Drawings signed by EngineerFile: 4 STP Drawings signed by Engineer.pdf | 27 Apr 2026 |
| BDA CLU (change of land)File: BDA CLU (change of land).pdf | 27 Apr 2026 |
| Halanayakanahalli 2 LUFile: Halanayakanahalli 2 LU.pdf | 27 Apr 2026 |
| Upload the Bank 100%, 70%, and 30% account pass sheets or statements, the bank account name should bFile: RERA Accounts.pdf | 31 Mar 2026 |
| What are all the sources of funds to complete the project? With supporting documents.File: Source Of funds For Completion of project_Partners Net Worth.pdf | 31 Mar 2026 |
| Authenticated copy of current year RTCFile: Authenticated copy of current year RTC .pdf | 31 Mar 2026 |
| MR showing flow of title to current owner before conversionFile: MR showing flow of title to current owner before conversion.pdf | 31 Mar 2026 |
| Title deed showing flow of title to current ownerFile: Title deed showing flow of title to current owner.pdf | 31 Mar 2026 |
| Conversion order issued by DCFile: Conversion order issued by DC_Halanayakanahalli.pdf | 31 Mar 2026 |
| clearly visible, defect free EC from 1-4-2010 to till date continuous, single documentFile: EC from 1-4-2010 to 31-03-2026_single document.pdf | 31 Mar 2026 |
| notarized affidavit regarding all pending or cleared litigations /non-litigation by clearly mentioniFile: Notarized affidavit_land acquisition.pdf | 31 Mar 2026 |
| date of completion of the project needs to be mentioned in DDMMYYYY format.File: Form B.pdf | 31 Mar 2026 |
| JD affidavitFile: JD affidavit.pdf | 31 Mar 2026 |
| advocate search report.File: Search report .pdf | 31 Mar 2026 |
| Akharband for all snosFile: Akharband for all snos_Index of land & Akarband.pdf | 31 Mar 2026 |
| B-karab land in project sno lands for public use and not encroaching the same by the landowner and dFile: Karab.pdf | 31 Mar 2026 |
| Single Plot layout plan Approved by the competent authority (Original and clearly visible)File: Single layout Plan.pdf | 31 Mar 2026 |
| Single Plot layout plan order Approved by the competent authority (Original and clearly visible)File: Single Layout Order Copy.pdf | 31 Mar 2026 |
| Building License from Local Authority Original Copy.File: Work order MD.pdf | 31 Mar 2026 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: Sketch.pdf | 31 Mar 2026 |
| Location details of the project, with clear demarcation of land dedicated for the project along withFile: Location details_with its boundaries including latitude and longitude of the end points.pd | 31 Mar 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevations.File: all original sanctioned drawings, floor plan, sectional drawings and elevations.pdf | 31 Mar 2026 |
| Area/ No of units of KSPCB noc is not matching with sanction planFile: NOC Pollution KSPCB.pdf | 31 Mar 2026 |
| Demarcation of proposed land in Approved Master plan Certified by the competent authority.File: Site Plan_0130.pdf | 31 Mar 2026 |
| Demarcation of proposed land in original Village map certified by the competent authority.File: Village Map.pdf | 31 Mar 2026 |
| Area details in approved plan and details uploaded is not MatchingFile: Area details in approved plan.pdf | 31 Mar 2026 |
| Approval/NOC under section 14 of the KTCP Act from competent Authority.File: Single layout Plan.pdf | 31 Mar 2026 |
| Details of facilities provided thereof including drinking water facilities, emergency services and uFile: Details of facilities.pdf | 31 Mar 2026 |
| Kindly upload approved building plan/floor plan/tower details.File: all original sanctioned drawings, floor plan, sectional drawings and elevations.pdf | 31 Mar 2026 |
| Parking details entered in portal are not matching to plan.File: Basement Plan With Car Parking_0128.pdf | 31 Mar 2026 |
| Exclusive common areas to allottee and exclusive common area to association is not properly entered.File: Exclusive common areas to allottee and exclusive common area to association.pdf | 31 Mar 2026 |
| Kindly upload separate amenities and common areas declaration with project name and address along wiFile: Project Amenities Details.pdf | 31 Mar 2026 |
| Kindly upload the project specifications along with project name, address, and duly signed by the auFile: project specifications.pdf | 31 Mar 2026 |
| Kindly upload elaborated structural stability certificate clearly stating the number of floors consiFile: structural stability certificate.pdf | 31 Mar 2026 |
| Kindly upload the Proforma of agreement (AFS) for sale as per RERA guidelines, duly fill all applicaFile: Sale Agreement Darft.pdf | 31 Mar 2026 |
| Kindly upload Proforma Allotment letter as per the standard prescribed format available in RERA portFile: Proforma Allotment letter.pdf | 31 Mar 2026 |
| Kindly upload brief project estimation with licenced engineer signature.File: Cerficate for consuration cost.pdf | 31 Mar 2026 |
| Kindly upload the STP drawing certified by the Engineer as per the guidelines.File: Maitree Developers Bangalore STP Layout 35KLD 08-04-2025 P1.pdf | 31 Mar 2026 |
| Kindly upload the Land cost calculation sheet as per the guidance value (Self-attested copy) along wFile: Land cost calculation sheet along with guidance value.pdf | 31 Mar 2026 |
| Kindly clarify the main source of water supply to the project along with the supporting documents anFile: Source of water supply.pdf | 31 Mar 2026 |
| Upload commencement certificate.File: commencement certificate_ACK.pdf | 31 Mar 2026 |
| RTC, survey 2/1 | - |
| Mutation, survey 2/1 | - |
| Encumbrance Certificate, survey 2/1 | - |
| Conversion/Alienation Order, survey 2/1 | - |
| JDA, survey 2/1 | - |
| Khatha, survey 2/1 | - |
| RTC, survey 2/5 | - |
| Mutation, survey 2/5 | - |
| Encumbrance Certificate, survey 2/5 | - |
| Conversion/Alienation Order, survey 2/5 | - |
| JDA, survey 2/5 | - |
| Khatha, survey 2/5 | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| MAITREE SPRINT | Survey No 36/4, Balagere, Gungurpalya Road , Varthur Hobli, | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep MAITREE VAJRA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 53 registered projects within 2 km.
BIRLA EVARA
VARDHITA PROPERTIES PRIVATE LIMITED
DSR HIGHLAND GREENZ
DSR INFRA PROJECTS
TRIFECTA VANTO PHASE-1
TRIFECTA PROJECTS PRIVATE LIMITED
GODREJ LAKESIDE ORCHARD
Godrej Properties Limited
Adarsh Tropica (Phase-2)
ORCHIDS APARTMENTS PVT LTD
East Park Residences
Ramsons Trendsquares Realty LLP
See every Bengaluru Urban project, with the district possession charts
Builder: MAITREE DEVELOPERS
MAITREE DEVELOPERS has 3 registrations on RERA Karnataka, including MAITREE SPRINT and MAITREE VAJRA. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if MAITREE VAJRA is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of MAITREE VAJRA?
The registered promoter entity is MAITREE DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29ABFFM0479B1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in MAITREE VAJRA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at MAITREE VAJRA?
The professionals named in the filing: Architect: MAHESH P; Engineer: VARA PRASAD; Chartered Accountant: KOPALLI MALLIKARJUNA & CO. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAITREE VAJRA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback