ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / MAITHILI RESIDENCY PHASE-2

Registered Litigation declared Residential / Group Housing project

MAITHILI RESIDENCY PHASE-2

By GLOBAL ORICON DEVELOPERS

RG-MH-26136 · RERA P51800003722 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 96 months
  • 3 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 96 months from the original
7 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 75%
87 of 94Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 243 documents Report an error

MAITHILI RESIDENCY PHASE-2 is a Residential / Group Housing project by GLOBAL ORICON DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003722 on 6 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 96 months from the original filing. 7 of the 94 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMAITHILI RESIDENCY PHASE-2
  • TypeResidential / Group Housing
  • Location
    • KIROL VILLAGE
    • RAJAWADI
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003722
  • ReraGenie IDRG-MH-26136

Builder

  • NameGLOBAL ORICON DEVELOPERS
  • Entity typePartnership
  • PartnersNIRAJ CHANDULAL GUPTA, LALIT SHANTILAL JAIN, CHRISTOPHER PETER LOBO, JIGNESH BHARATBHAI MANIYAR, JITENDRA CHHATRAPAL SINGH, KOTHARI INDIA PRIVATE LIMITED
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2019)
  • Buildings2 building records
  • Documents filed243 files

Current status

7%7 of 94 units booked
49.0%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 2 A WINGNA161470070
BUILDING 2 B WINGNA11924024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 75%.

BUILDING 2 A WING45%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure73%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 2 B WING54%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure73%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes35%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes25%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed93

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots93
Closed/Covered93
BuildingClosed/CoveredTotal
BUILDING 2 A WING7171
BUILDING 2 B WING2222

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,207 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jan 2026

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI8500.0
Proposed, not sanctioned7,068 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVARDHAMAN CHAMBERS, SECTOR-17, VASHI, NAVI MUMBAI
Estimated costRs 29.99 cr
Cost incurredRs 14.69 cr
Work done49.0%
BuildingWingEstimatedIncurred
BUILDING 2 A WINGNARs 19.48 crRs 10.91 cr
BUILDING 2 B WINGNARs 6.49 crRs 3.64 cr
-NARs 4.01 crRs 14.99 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMIT N PATIL ARCHITECTS
ArchitectAmit Patil Architects
EngineerSTRUCTURAL CONCEPT
EngineerRAAJESH LADHAD
Chartered AccountantVISHAL SHETHIYA
Chartered AccountantPINKY RAMBOL JHA
Chartered AccountantNAVEENA KUMAR AND ASSOCIATES
PartnerRole in project
GLOBAL ORICON DEVELOPERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010973Dec 2019 → Dec 2024

Reason as filed by the promoterDate: 29th September 2021 To, The Maharashtra Real Estate Regulatory Authority, Mumbai SUB: APPLICATION FOR EXTENSION OF REGISTRATION OF PROJECT “MAITHILI RESIDENCY PHASE II”. Respected Sir, We hereby apply for extension of registration of the project called “Maithili Residency Phase II” registered with the regulatory authority vide project registration certificate bearing No. P51800003722 which expires on 30/12/2021. We, the Promoters, are unable to carry on the construction activity and the completion of building is delayed due to the following reasons: 1. As a result of notice letter issued

EXT51800005029Dec 2019 → Dec 2020

Reason as filed by the promoterWe, the Promoters, are unable to carry on the construction activity and the completion of building is delayed by following reasons; 1. as a result of notice letter issued by the MCGM vide their letter no. Dy.Ch.E./9383/N/BPES dated 18.12.2017 whereby they have intimated us that as per the A.E. Survey dated 16.12.2017 our plot is affected by buffer of Naval Armament Department i.e. within 500Mt from Naval Boundary and as per circular dated 18.05.2011 of MoD the proposal needs NOC from Naval Authority. Since the NOC from Naval Authority is not obtained, they have directed not to carry out any fu

EXT51800025191Dec 2019 → Dec 2027

Reason as filed by the promoterWe wish to inform you of certain unforeseen delays that have occurred due to external factors beyond our control. The planning authority, MCGM (Municipal Corporation of Greater Mumbai), issued the commencement certificate for the project on 9th March 2017, and construction commenced as per the approved plans. At present, we have completed approximately 72.50% of the work. However, during the course of construction, MCGM issued a Stop Work Notice requiring us to obtain an NOC (No Objection Certificate) from the Naval Department, citing that the project lies within 500 meters of the buffer zone

Litigation declared2

CaseCourtStatus
102182/2014BOMBAY CITY CIVIL COURTPENDING
1001109/2017BOMBAY CITY CIVIL COURTNOTICE OF MOTION PENDING

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000100462Ghanashyam Sukhranichairmen/secretary09/08/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed243

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 243 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 P II 31 03 2026.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 PHASE II 31 03 2026.pdf21 Apr 2026
Withdrawal Update Form 3File: form 3 P II 31 03 2026.pdf21 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A P II 31 03 2026.pdf17 Apr 2026
Form 2A (FY 2022-2023)File: Form 2A Phase II 31 03 2023.pdf4 Feb 2026
Form 2A (FY 2023-2024)File: Form 2A Phase II 31 03 2024.pdf4 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A Phase II 31 03 2025.pdf4 Feb 2026
Form 5 (FY 2021-2022)File: RERA Form 5 Phase II 31 03 2022_Final.pdf30 Jan 2026
Form 5 (FY 2022-2023)File: New MAHARERA FORM 5 For annual report of CA - Phase II.pdf30 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 Phase II_2_11zon.pdf30 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5 - Phase II.pdf30 Jan 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE P II 31 12 2025.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2 P II 31 12 2025.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3 Phase II fINAL31 12 2025.pdf29 Jan 2026
Form 1File: Form 1 30 06 2024 Phase II.pdf24 Nov 2025
Form 2File: Form 2 As on 30 06 2024 GOD Phase II.pdf24 Nov 2025
Form 3File: Form 3 CA Certificate as on 30 06 2024 Phase II_com.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2025.pdf24 Nov 2025
Form 1File: Form 1_Phase II_30 09 2024.pdf24 Nov 2025
Form 2File: Form 2 As on 30 09 2024 GOD Phase II.pdf24 Nov 2025
Form 3File: Form 3 CA Certificate as on 30 09 2024 GOD Phase II_com.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2025.pdf24 Nov 2025
Form 1File: FORM 1 Phase II 31 12 2024.pdf24 Nov 2025
Form 2File: Form 2 Engineers Certificate Phase II 31 12 2024.pdf24 Nov 2025
Form 3File: GOD FORM 3 CA CERTIFICATE FINAL 31 12 2024_PHASE II_com.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2025.pdf24 Nov 2025
Form 1File: Form 1_Phase II_30 09 2021.pdf24 Nov 2025
Form 2File: Form 2 Engineers Certificate Phase II_30 09 2021.pdf24 Nov 2025
Form 3File: FORM 3 PHASE II_ 30 09 2021.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2022.pdf24 Nov 2025
Form 1File: Form 1_Phase II_30 09 2021.pdf24 Nov 2025
Form 2File: Form 2 Engineers Certificate Phase II_30 09 2021.pdf24 Nov 2025
Form 3File: FORM 3 PHASE II_ 30 09 2021.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2022.pdf24 Nov 2025
Form 1File: Form 1_Phase II_31 03 2022.pdf24 Nov 2025
Form 2File: Form 2 Engineers Certificate Phase II_31 03 2022.pdf24 Nov 2025
Form 3File: Form 3 Maithili Residency Phase II 31 03 2022.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2022.pdf24 Nov 2025
Form 1File: FORM 1 GOD PHASE II 31 03 2018.pdf18 Nov 2025
Form 2File: Form 2 GOD Phase II 31 03 2018.pdf18 Nov 2025
Form 3File: FORM 3 Phase 2 _ 31 03 2018.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2018.pdf18 Nov 2025
Form 1File: FORM 1 GOD PHASE II 31 03 2018.pdf18 Nov 2025
Form 2File: Form 2 GOD Phase II 31 03 2018.pdf18 Nov 2025
Form 3File: FORM 3 Phase 2 _ 31 03 2018.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2018.pdf18 Nov 2025
Form 1File: FORM 1 GOD PHASE II 31 03 2018.pdf18 Nov 2025
Form 2File: Form 2 GOD Phase II 31 03 2018.pdf18 Nov 2025
Form 3File: FORM 3 Phase 2 _ 31 03 2018.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2018.pdf18 Nov 2025
Form 1File: FORM 1 Phase II 31 03 2020.pdf18 Nov 2025
Form 2File: Form 2 Maithili Residency Phase II 31 03 2020.pdf18 Nov 2025
Form 3File: FORM 3 31 03 2020 PHASE II FINAL.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2020.pdf18 Nov 2025
Form 1File: FORM 1 Phase II 31 03 2020.pdf18 Nov 2025
Form 2File: Form 2 Maithili Residency Phase II 31 03 2020.pdf18 Nov 2025
Form 3File: FORM 3 31 03 2020 PHASE II FINAL.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2020.pdf18 Nov 2025
Form 1File: FORM 1 Phase II 31 03 2020.pdf18 Nov 2025
Form 2File: Form 2 Maithili Residency Phase II 31 03 2020.pdf18 Nov 2025
Form 3File: FORM 3 31 03 2020 PHASE II FINAL.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2020.pdf18 Nov 2025
Form 1File: FORM 1 Phase II 31 03 2020.pdf18 Nov 2025
Form 2File: Form 2 Maithili Residency Phase II 31 03 2020.pdf18 Nov 2025
Form 3File: FORM 3 31 03 2020 PHASE II FINAL.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2020.pdf18 Nov 2025
Form 1File: FORM 1 Phase II 31 03 2021.pdf18 Nov 2025
Form 2File: Form 2 Maithili Residency Phase II 31 03 2021.pdf18 Nov 2025
Form 3File: Form 3 Phase II Form 3 31 03 2021.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2021.pdf18 Nov 2025
Form 1File: FORM 1 Phase II 31 03 2021.pdf18 Nov 2025
Form 2File: Form 2 Maithili Residency Phase II 31 03 2021.pdf18 Nov 2025
Form 3File: Form 3 Phase II Form 3 31 03 2021.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2021.pdf18 Nov 2025
Form 1File: FORM 1 Phase II 31 03 2021.pdf18 Nov 2025
Form 2File: Form 2 Maithili Residency Phase II 31 03 2021.pdf18 Nov 2025
Form 3File: Form 3 Phase II Form 3 31 03 2021.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Phase II as on 31 03 2021.pdf18 Nov 2025
Form 1File: FORM 1 Phase II 31 03 2021.pdf18 Nov 2025
Form 2File: Form 2 Maithili Residency Phase II 31 03 2021.pdf18 Nov 2025

How this compares with Mumbai Suburban

7%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 96 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAITHILI RESIDENCY PHASE-2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAJAWADI6,700+ in Mumbai Suburban

2 kmMAITHILI RESIDENCY PHASECompleted 133Lapsed / revoked 107Other 157Dot size: filed unitsN

Filed coordinates, straight-line distance. 397 registered projects within 2 km.

Builder: GLOBAL ORICON DEVELOPERS

GLOBAL ORICON DEVELOPERS has 2 registrations on MahaRERA, including MAITHILI RESIDENCY PHASE-1 and MAITHILI RESIDENCY PHASE-2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MAITHILI RESIDENCY PHASE-2 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAITHILI RESIDENCY PHASE-2?

The registered promoter entity is GLOBAL ORICON DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAITHILI RESIDENCY PHASE-2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MAITHILI RESIDENCY PHASE-2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MAITHILI RESIDENCY PHASE-2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAITHILI RESIDENCY PHASE-2?

The professionals named in the filing: Architect: AMIT N PATIL ARCHITECTS; Architect: Amit Patil Architects; Engineer: STRUCTURAL CONCEPT; Engineer: RAAJESH LADHAD; Chartered Accountant: VISHAL SHETHIYA; Chartered Accountant: PINKY RAMBOL JHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAITHILI RESIDENCY PHASE-2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAITHILI RESIDENCY PHASE-2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAITHILI RESIDENCY PHASE-2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.