ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / MAHAVIR EMERALD

Completed No litigation declared Residential / Group Housing project

MAHAVIR EMERALD

By RAJESH BUILDCON

RG-MH-56463 · RERA P99000047827 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0 of 28Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

MAHAVIR EMERALD is a Residential / Group Housing project by RAJESH BUILDCON in Palghar, Maharashtra, registered with MahaRERA as P99000047827 on 28 Nov 2022. The registration is recorded completed; possession was promised by 31 Dec 2027. 28 of the 28 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMAHAVIR EMERALD
  • TypeResidential / Group Housing
  • Location
    • Boisar Chilhar Road
    • Boisar
    • Betegaon
    • Palghar
    • 401506
  • Pincode401506
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000047827
  • ReraGenie IDRG-MH-56463

Builder

  • NameRAJESH BUILDCON
  • Entity typePartnership
  • GSTIN27ABEFR8002L1Z0
  • PartnersShail Rajesh Mehta, Nisha Rajesh Mehta, Yashasvi Manoj Mehta, Parag Dilip Shah, Vipul Arvind Shah, Vishal Dilip Shah
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredNov 2022PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Nov 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

100%28 of 28 units booked
130.8%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAHAVIR EMERALDNA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

MAHAVIR EMERALD: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Closed/Covered17

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,023 sq m
Land owned byNot the promoter
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Oct 2024
LandownerVillageDistrict
Madhubhai KatchhiBorivaliMumbai Suburban
Bhavika KatchhiBorivaliMumbai Suburban
Akshita KatchhiBorivaliMumbai Suburban
Parth KatchhiBorivaliMumbai Suburban
Prakash Vaghasiya-Surat
Vinayak Vaghasiya-Bhavnagar

Approvals and building plan

Sanctioning authorityTown Planning, Palghar
Permissible FSI2030.99
Proposed, not sanctioned2,031 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPalghar
Estimated costRs 4.50 cr
Cost incurredRs 5.88 cr
Work done130.78%
BuildingWingEstimatedIncurred
MAHAVIR EMERALDNARs 4.50 crRs 5.62 cr
-NA-Rs 26.51 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastushilp Associates
EngineerAum Associates
Chartered AccountantL N Vasa & co
Chartered AccountantRAJESH BALSARA
PartnerRole in project
RAJESH BUILDCON-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12504572RAJESH BUILDCONAkshada Arun Patil22/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Apr 2025

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC Emerald.pdf29 May 2026
Occupational CertificateFile: Resubmission Letter.pdf29 May 2026
Layout approvalFile: BETEGAON PLOT 2 LAYOUT Plan (1).pdf30 Apr 2026
Building plan approvalFile: BETEGAON PLOT 2 TYPE A1.pdf30 Apr 2026
Withdrawal Update Form 1File: architect merged.pdf29 Apr 2026
Withdrawal Update Form 2File: Engineer Emerald A_merged.pdf29 Apr 2026
Withdrawal Update Form 3File: CA Emerald A_merged.pdf29 Apr 2026
Withdrawal Update Form 1File: architect merged.pdf10 Feb 2026
Withdrawal Update Form 1File: architect merged.pdf10 Feb 2026
Withdrawal Update Form 1File: architect merged.pdf10 Feb 2026
Withdrawal Update Form 2File: Engineer Emerald A_merged.pdf10 Feb 2026
Withdrawal Update Form 2File: Engineer Emerald A_merged.pdf10 Feb 2026
Withdrawal Update Form 2File: Engineer Emerald A_merged.pdf10 Feb 2026
Withdrawal Update Form 3File: CA Emerald A_merged.pdf10 Feb 2026
Withdrawal Update Form 3File: CA Emerald A_merged.pdf10 Feb 2026
Withdrawal Update Form 3File: CA Emerald A_merged.pdf10 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 Emerald A 2024-25 1.pdf7 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Emerald A.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Emerald A.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Emerald A.pdf18 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Emerald.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Emerald A Architect Oct Dec 2024.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Emerald A CA Oct Dec 2024.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Emerald A Engineer Oct Dec 2024.pdf17 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P99000047827 1.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Emerald A Architect.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Emerald A CA.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06_Cost_Cert_MEmerald_A1_011024.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf12 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_20240716_0001-29-30.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 05_Cost_Cert_MEmerald_A1_010724.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Signed.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect signed.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04_Cost_Cert_MEmerald_A1_010424.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Signed.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer revised.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Signed.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Signed.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Signed.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Signed_compressed.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Emerald Architect.pdf15 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer organized.pdf15 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA organized.pdf15 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect organized.pdf8 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Emerald.pdf8 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA organized.pdf8 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA REVISED_merged (1)_organized.pdf17 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Finance0001.pdf11 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance Finance0001.pdf11 Nov 2022
Proforma of Agreement for saleFile: Draft Agreement1.pdf7 Nov 2022
CERSAI detailsFile: 002CERSAI_Search_Report_200250095572_For_Asset_Based_Search_18_10_2022_17_48_11_434.pdf19 Oct 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Finance0001.pdf18 Oct 2022
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf12 Oct 2022
Declaration about Commencement CertificateFile: Declaration Commencement.pdf12 Oct 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf12 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf12 Oct 2022
Deviation Report with respect to Allotment letterFile: Daviation of Allotment Letter.pdf12 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Daviation of Agreement.pdf12 Oct 2022
Copy of the legal title reportFile: Legal Title Report.pdf10 Oct 2022
Declaration in FORM BFile: Form B Developer.pdf10 Oct 2022
PAN CardFile: Rajesh Buildcon.pdf9 Sep 2022
Copy of Layout Approval (in case of layout)File: BETEGAON PLOT 2 LAYOUT.pdf9 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: BETEGAON PLOT 2 TYPE A1.pdf9 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: Construction Permission18082022_0001_compressed_compressed.pdf9 Sep 2022

How this compares with Palghar

100%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAHAVIR EMERALD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Boisar3,200+ in Palghar

2 kmMAHAVIR EMERALDCompleted 3Lapsed / revoked 18Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 51 registered projects within 2 km.

Builder: RAJESH BUILDCON

RAJESH BUILDCON has 3 registrations on MahaRERA, including MAHAVIR EMERALD and MAHAVIR EMERALD WING B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if MAHAVIR EMERALD is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAHAVIR EMERALD?

The registered promoter entity is RAJESH BUILDCON, a partnership as per the filing. Its GSTIN 27ABEFR8002L1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAHAVIR EMERALD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MAHAVIR EMERALD?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MAHAVIR EMERALD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAHAVIR EMERALD?

The professionals named in the filing: Architect: Vastushilp Associates; Engineer: Aum Associates; Chartered Accountant: L N Vasa & co; Chartered Accountant: RAJESH BALSARA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHAVIR EMERALD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHAVIR EMERALD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHAVIR EMERALD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.