RG-KA-28190 · RERA PRM/KA/RERA/1251/309/PR/191213/003063 · Last updated on RERA Karnataka portal: 6 Jun 2025

Source: official RERA Karnataka filing

Red flags

  • 4 complaints at RERA Karnataka
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • Separate project account declared
Sep 2025Possession promisedmoved 21 months from the original
4Complaints at RERA Karnatakaon this registration
Jump to the 54 documents Report an error

MAHAVEER NORTHSCAPE is a Residential/Group Housing project by PRAGATI CORP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/191213/003063 on 13 Dec 2019. Possession is promised by 30 Sep 2025. The completion date has moved by 21 months from the original filing. 4 complaints are on record with the regulator.

At a glance

Project

  • NameMAHAVEER NORTHSCAPE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/191213/003063
  • ReraGenie IDRG-KA-28190

Builder

  • NamePRAGATI CORP
  • Entity typePartnership Firm
  • Authorized SignatoryKUMBALA PRAVEEN
  • OthersKUMBALA PRAVEEN

Key dates

this monthRegisteredDec 2019First promiseDec 2023Revised toSep 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on13 Dec 2019
  • Promised completion30 Sep 2025
  • Revised completionRevised to 30 Sep 2025 (originally 31 Dec 2023)
  • Buildings2 building records
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK- A---1240124
Block B---1140114

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 6 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 6 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,239 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 52.41 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAslam Architects
EngineerJ SUNIL PRANAY

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2023 → Sep 2024

No reason recorded in the filing

EX/PRM/KA/RERA/1251/309/PR/250618/003063Sep 2024 → Sep 2025

Reason as filed by the promoterShortage of Labour

Complaints filed with RERA Karnataka4

Case no.ComplainantRespondentFiled
01884/2023-PRAGATI CORP28/12/2023
00821/2025-PRAGATI CORP11/06/2025
01192/2026-PRAGATI CORP05/10/2026
01285/2026-PRAGATI CORP02/11/2026

Documents filed54

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/191213/003063 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Northscape Sanction PlanFile: NORTH SCAPE SANCTIONED PLAN 1_compressed.pdf6 Jun 2025
Northscape CCFile: north scape cc.pdf6 Jun 2025
NORTHSCAPE LICENSE RENEWAL DDFile: NORTHSCAPE LICENCE RENEWAL.pdf6 Jun 2025
NORTHSCAPE ANNUAL AUDIT 23-24File: Mahveer North Scape FY 2023-24 (1).pdf6 Jun 2025
CA FUNDS REQURIED :SOURCE OF FUNDS ARE FROM CUSTOMER COLLECTIONFile: CA - Fund required.pdf6 Jun 2025
sanctioned floor plans duly signedFile: Northscape Sanction plans.pdf6 Dec 2019
Architect Certificate for Work Completion Schedule till DateFile: Ex-1.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Ex-5.pdf-
CA Certificate for Funds UtilizationFile: Ex-3.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Ex-2.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Ex-6.pdf-
CA Certificate for Funds required for Project CompletionFile: Ex-4.pdf-
AffidavitFile: Ex-7 Affidavit.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
BIAAPA-
Northscape rendered plans-
Sanction Copy-
Sale Deed-
proforma SALE AGREEMENT-
RTC-
Northscape Sanction plans-
Sanction Copy-
BOOKING FORM - ALLOTMENT-
Northscape Brochure-
Nosrthscape specifications-
NORTH SCAPE EC-
Affidavit-2-
Joint Affidavit-
katha-
JDA-
GPA-
DC CONVERSION-
compresspdf_ytFsz02g-
Pragati Airport NOC-
isa12-
Water NOC-Panchayat-
signedpdfnew-
SEIAA-Final-
Sanction Copy-
Floor Plan-
DC CONVERSION-
Balance Sheet 2017 - 2018File: Balance Sheet.pdf-
Balance Sheet 2016 - 2017File: Balance Sheet.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet.pdf-
Audited Profit and Loss Statement 2017 - 2018File: profit and loss account.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Profit and Loss account.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit and loss account.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: Income Tax Acknowledgment.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Income Tax Ackn.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Income Tax Ackn.pdf-
Form B Affidavit-
Prospectus/BrochureFile: North Scape Leaflet RERA.pdf-
Advertisement Copy 1File: North Scape Leaflet RERA.pdf-
Tower Excel SheetFile: Copy of PRM_KA_RERA_1251_309_PR_191213_003063.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep MAHAVEER NORTHSCAPE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: PRAGATI CORP

PRAGATI CORP has 1 registration on RERA Karnataka, including MAHAVEER NORTHSCAPE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if MAHAVEER NORTHSCAPE is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MAHAVEER NORTHSCAPE?

The registered promoter entity is PRAGATI CORP, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MAHAVEER NORTHSCAPE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MAHAVEER NORTHSCAPE?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at MAHAVEER NORTHSCAPE?

The professionals named in the filing: Architect: Aslam Architects; Engineer: J SUNIL PRANAY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHAVEER NORTHSCAPE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHAVEER NORTHSCAPE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHAVEER NORTHSCAPE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.