Home / Browse projects / Bengaluru Urban, Karnataka / MAHAVEER CREST
MAHAVEER CREST
By REDDY STRUCTURES PRIVATE LIMITED
RG-KA-19255 · RERA PRM/KA/RERA/1251/446/PR/170726/008823 · Last updated on RERA Karnataka portal: 16 Jul 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
MAHAVEER CREST is a Residential/Group Housing project by REDDY STRUCTURES PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/170726/008823 on 17 Jul 2026. Possession is promised by 30 Sep 2031.
At a glance
Project
- NameMAHAVEER CREST
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/446/PR/170726/008823
- ReraGenie IDRG-KA-19255
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on17 Jul 2026
- Promised completion30 Sep 2031
- Revised completionNone
- Buildings12 building records
- Documents filed116 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING 1 (Block A) | - | - | - | 40 | 0 | 40 |
| WING 2 (Block A) | - | - | - | 45 | 0 | 45 |
| WING 3 (Block A) | - | - | - | 35 | 0 | 35 |
| WING 4 (Block A) | - | - | - | 40 | 0 | 40 |
| WING 5 (Block A) | - | - | - | 45 | 0 | 45 |
| WING 6 (Block A) | - | - | - | 35 | 0 | 35 |
| WING 7 (Block A) | - | - | - | 45 | 0 | 45 |
| WING 8 (Block A) | - | - | - | 40 | 0 | 40 |
| WING 9 (Block A) | - | - | - | 25 | 0 | 25 |
| WING 10 (Block B) | - | - | - | 80 | 0 | 80 |
| WING 11 (Block B) | - | - | - | 50 | 0 | 50 |
| WING 12 (Block B) | - | - | - | 40 | 0 | 40 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | - |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M R Shivakumar | - | - |
| M R Shivakumar | - | - |
| K Malini | - | - |
| N Kodanda Reddy | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 197.14 cr | - |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 9.60 cr | - |
| Administrative Costs | Rs 9.00 cr | - |
| On-site expenditure-Consultants Fees | Rs 5.46 cr | - |
| Payment of taxes | Rs 2.70 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Srinivas G Arvas |
| Engineer | Inturi Veeraiah |
| Chartered Accountant | SAKALESHWARA D C |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed116
As listed on the registration, under the names the promoter filed them with; the newest 80 of 116 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/170726/008823 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Clarification on QueriesFile: 1 Clarification on Queries.pdf | 16 Jul 2026 |
| ECC-Sy No 99-1File: 2 ECC-Sy No 99-1.pdf | 16 Jul 2026 |
| ECC-Sy No 99-2File: 3 ECC-Sy No 99-2.pdf | 16 Jul 2026 |
| ECC-Sy No 100-1File: 4 ECC-Sy No 100-1.pdf | 16 Jul 2026 |
| ECC-Sy No 100-2File: 5 ECC-Sy No 100-2.pdf | 16 Jul 2026 |
| Form-6 Engineer certificateFile: 6 Form-6 Engineer certificate.pdf | 16 Jul 2026 |
| Proforma Sale Agreement CrestFile: 7 Proforma Sale Agreement Crest.pdf | 16 Jul 2026 |
| Proforma Allotment Letter- UpdatedFile: 8 Proforma Allotment Letter- Updated.pdf | 16 Jul 2026 |
| Land Cost Calculation SignedFile: 9 Land Cost Calculation Signed.pdf | 16 Jul 2026 |
| Construction Estimation SummaryFile: 10 Construction Estimation Summary.pdf | 16 Jul 2026 |
| STP DrawingFile: 11 STP Drawing.pdf | 16 Jul 2026 |
| RTC, survey 99/1 | - |
| Mutation, survey 99/1 | - |
| Encumbrance Certificate, survey 99/1 | - |
| Conversion/Alienation Order, survey 99/1 | - |
| Sale/Title/Gift Deed, survey 99/1 | - |
| JDA, survey 99/1 | - |
| Khatha, survey 99/1 | - |
| RTC, survey 99/2 | - |
| Mutation, survey 99/2 | - |
| Encumbrance Certificate, survey 99/2 | - |
| Conversion/Alienation Order, survey 99/2 | - |
| Sale/Title/Gift Deed, survey 99/2 | - |
| JDA, survey 99/2 | - |
| Khatha, survey 99/2 | - |
| RTC, survey 100/2 | - |
| Mutation, survey 100/2 | - |
| Encumbrance Certificate, survey 100/2 | - |
| Conversion/Alienation Order, survey 100/2 | - |
| Sale/Title/Gift Deed, survey 100/2 | - |
| JDA, survey 100/2 | - |
| Khatha, survey 100/2 | - |
| RTC, survey 100/1 | - |
| Mutation, survey 100/1 | - |
| Encumbrance Certificate, survey 100/1 | - |
| Conversion/Alienation Order, survey 100/1 | - |
| Sale/Title/Gift Deed, survey 100/1 | - |
| JDA, survey 100/1 | - |
| Khatha, survey 100/1 | - |
| Registration CertificateFile: Registeration certificate - RSPL.pdf | - |
| Memorandum of AssociationFile: MOA.pdf | - |
| Article of AssociationFile: AOA.pdf | - |
| GST CertificateFile: GST Cert.pdf | - |
| Certificate issued by CA Form 1File: Form 1 CA Certificate Mahaveer Crest.pdf | - |
| Certificate issued by Architect Form 2File: Form 2 Arc Cert - Mahaveer Crest.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Eng Cert - Mahaveer Crest.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non litigation Affidavit.pdf | - |
| Balance Sheet 2024 - 2025File: Financials FY 2024-25.pdf | - |
| Balance Sheet 2023 - 2024File: Financials FY 2023-24.pdf | - |
| Balance Sheet 2022 - 2023File: Financials FY 2022-23.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: Financials FY 2024-25.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Financials FY 2023-24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Financials FY 2022-23.pdf | - |
| Income Tax Return Acknowledgement 2024 - 2025File: ITR FY 2024-25.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: ITR FY 2023-24.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR FY 2022-23.pdf | - |
| Director's Report 2024 - 2025File: Financials FY 2024-25.pdf | - |
| Director's Report 2023 - 2024File: Financials FY 2023-24.pdf | - |
| Director's Report 2022 - 2023File: Financials FY 2022-23.pdf | - |
| Cash Flow Statement 2024 - 2025File: Financials FY 2024-25.pdf | - |
| Cash Flow Statement 2023 - 2024File: Financials FY 2023-24.pdf | - |
| Auditor's Report 2024 - 2025File: Financials FY 2024-25.pdf | - |
| Auditor's Report 2023 - 2024File: Financials FY 2023-24.pdf | - |
| Auditor's Report 2022 - 2023File: Financials FY 2022-23.pdf | - |
| BDA Approval letter | - |
| BDA Plan 1-8 | - |
| BDA Plan 8-8 | - |
| Crest Structural Stability Certificate | - |
| Project Specification -crest | - |
| Relinquishment Deed | - |
| Form B Affidavit - Crest | - |
| Section 3(1) Notarized Affidavit | - |
| JD AFFIDAVIT CUM DECLARATION | - |
| Legal Opinion - Signed | - |
| Crest - BESCOM NOC | - |
| Crest - Water - Panchayath NOC | - |
| KSPCB NOC - Affidavit | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep MAHAVEER CREST on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: REDDY STRUCTURES PRIVATE LIMITED
REDDY STRUCTURES PRIVATE LIMITED has 11 registrations on RERA Karnataka, including MAHAVEER PALATIUM and Mahaveer Palatium Sy No 41. Its filings declare 25 earlier projects, 8 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if MAHAVEER CREST is delayed beyond 30 Sep 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of MAHAVEER CREST?
The registered promoter entity is REDDY STRUCTURES PRIVATE LIMITED, a company as per the filing. Its CIN U07010KA2002PTC031181 and GSTIN 29AACCR6953L1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in MAHAVEER CREST?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at MAHAVEER CREST?
The professionals named in the filing: Architect: Srinivas G Arvas; Engineer: Inturi Veeraiah; Chartered Accountant: SAKALESHWARA D C. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAHAVEER CREST?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback