ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Madhukunj CHSL Building No 23

Registration lapsed No litigation declared Residential / Group Housing project

Madhukunj CHSL Building No 23

By HAROON RASHID IMTIYAZ AHMAD SHAIKH

RG-MH-35585 · RERA P51800017728 · Last updated on MahaRERA portal: 15 Dec 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 3 complaints at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 95%
3Complaints at MahaRERAon this registration
Jump to the 31 documents Report an error

Madhukunj CHSL Building No 23 is a Residential / Group Housing project by HAROON RASHID IMTIYAZ AHMAD SHAIKH in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800017728 on 6 Sep 2018. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 48 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameMadhukunj CHSL Building No 23
  • TypeResidential / Group Housing
  • Location
    • Kannamwar Nagar
    • Village Hariyali Vikroli East
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • RERA no.P51800017728
  • ReraGenie IDRG-MH-35585

Builder

  • NameHAROON RASHID IMTIYAZ AHMAD SHAIKH
  • Entity typeIndividual

Key dates

22 months past promisethis monthRegisteredSep 2018First promiseDec 2020Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Sep 2018
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 30 Dec 2020)
  • Buildings1 building record
  • Documents filed31 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Madhukunj CHSL Building No 23NA210000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Dec 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Madhukunj CHSL Building No 23: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises73%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 15 Dec 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Closed/Covered1
Open Space6

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area595 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3237.14
Proposed, not sanctioned3,237 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPant Nagar, Ghatkopar East

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace Moduler
PartnerRole in project
HAROON RASHID IMTIYAZ AHMAD SHAIKH-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800008956Dec 2020 → Dec 2021

Reason as filed by the promoterWe have Real Estate project registered with MahaRERA authority with name “: Madhukunj CHSL Building No 23” vide Certificate No. P51800017728 dated 06/09/2018. Due date for the completion of the project as estimated at the time of the registration is 30/06/2020. Thereafter due to Notification/Order No 13 and 14 dated 2nd April 2020 and 18th May 2020 respectively issued by MahaRERA an extension of six months received and date of completion became 30th November 2020.

EXT51800012460Dec 2020 → Dec 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 51.22% allottees for purpose of extension of RERA registration period of the said project.

Litigation declared1

CaseCourtStatus
1242/2011Bombay High CourtDissmissed

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000292242Madhukunj CHS Ltd.Haroon Rashid Imtiyaz ahmad shaikh20/08/2022
CC006000000292333Anita Jayesh KhadeHi-Tech India Builder and Developer14/08/2022
CC006000000292508Swapnil Rajendra LondheHAROON RASHID SHAIKH30/08/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed31

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 476.pdf15 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Supervisor 2019-2020.pdf12 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Supervisor 2020-2021.pdf12 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Supervisor 2021-2022.pdf12 Dec 2022
Declaration about Commencement CertificateFile: Format D Madhukunj.pdf10 Dec 2022
Disclosure of sold/ booked inventoryFile: Circular 29 Madhukunj.pdf10 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Certificate 18-19.pdf10 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Certificate 19-20.pdf10 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Certificate 20-21.pdf10 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 20-21.pdf10 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: CC Madhukunj CHS.pdf12 Jan 2021
Layout approvalFile: p01.pdf30 Jul 2018
Layout approvalFile: p02.pdf30 Jul 2018
Layout approvalFile: p03.pdf30 Jul 2018
Copy of Layout Approval (in case of layout)File: p01.pdf30 Jul 2018
Copy of Layout Approval (in case of layout)File: p02.pdf30 Jul 2018
Copy of Layout Approval (in case of layout)File: p03.pdf30 Jul 2018
OtherFile: Declaration (AutoRecovered).pdf23 Jul 2018
Building plan approvalFile: IOD- Approved letter 14 12 17.pdf17 Jul 2018
PAN CardFile: PAN CARD.pdf17 Jul 2018
Copy of the legal title reportFile: Title Certificate 20012018-ilovepdf-compressed (1).pdf17 Jul 2018
Copy of the legal title reportFile: Title Certificate 20012018_0001.pdf17 Jul 2018
Details of encumbrancesFile: Non Encumbrances Certificate-ilovepdf-compressed.pdf17 Jul 2018
Building Plan Approval (IOD)File: IOD- Approved letter 14 12 17.pdf17 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate (Old).pdf17 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: New CC 13 07 2018 Madhukunj Approved Further C_C_ 11 07 2018.pdf17 Jul 2018
Declaration in FORM BFile: New Form B Declaration-ilovepdf-compressed.pdf17 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- Architect Certificate.pdf17 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM_2 Hi Tech _Engineer Certificate-ilovepdf-compressed.pdf17 Jul 2018
Certificates of CA (Form 3)File: Form 3 mergerd.pdf17 Jul 2018
Proforma of Allotment letterFile: DRAFT AGREEMENT FOR SALE.pdf17 Jul 2018

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 48 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Madhukunj CHSL Building No 23 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Hariyali Vikroli East6,700+ in Mumbai Suburban

Builder: HAROON RASHID IMTIYAZ AHMAD SHAIKH

HAROON RASHID IMTIYAZ AHMAD SHAIKH has 1 registration on MahaRERA, including Madhukunj CHSL Building No 23. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Madhukunj CHSL Building No 23 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Madhukunj CHSL Building No 23 is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Madhukunj CHSL Building No 23?

The registered promoter entity is HAROON RASHID IMTIYAZ AHMAD SHAIKH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Madhukunj CHSL Building No 23?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Madhukunj CHSL Building No 23?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Madhukunj CHSL Building No 23?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Madhukunj CHSL Building No 23?

The professionals named in the filing: Architect: Space Moduler. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Madhukunj CHSL Building No 23?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Madhukunj CHSL Building No 23. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Madhukunj CHSL Building No 23 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.