Home / Browse projects / Bengaluru Urban, Karnataka / Maangalya Prosper Signature Block

Registration approved Residential/Group Housing project

Maangalya Prosper Signature Block

By Maangalya Constructions

RG-KA-51709 · RERA PRM/KA/RERA/1251/310/PR/180917/002010

Source: official RERA Karnataka filing

Red flags

  • 5 complaints at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Sep 2022Possession promisedmoved 9 months from the original
5Complaints at RERA Karnatakaon this registration
Jump to the 48 documents Report an error

Maangalya Prosper Signature Block is a Residential/Group Housing project by Maangalya Constructions in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/180917/002010 on 17 Sep 2018. Possession is promised by 30 Sep 2022. The completion date has moved by 9 months from the original filing. 5 complaints are on record with the regulator.

At a glance

Project

  • NameMaangalya Prosper Signature Block
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/180917/002010
  • ReraGenie IDRG-KA-51709

Builder

  • NameMaangalya Constructions
  • Entity typeCompany
  • Authorized SignatorySanjaya Suryanarayana
  • OthersPRASAD RAYA RAWATH

Key dates

this monthRegisteredSep 2018First promiseDec 2021Revised toSep 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Sep 2018
  • Promised completion30 Sep 2022
  • Revised completionRevised to 30 Sep 2022 (originally 31 Dec 2021)
  • Buildings3 building records
  • Documents filed48 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JADE---46046
EMERALD---46046
SAPPHIRE---46046

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Ground Clearance-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,891 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 45.00 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2021 → Sep 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka5

Case no.ComplainantRespondentFiled
CMP/210714/0008130-Maangalya Constructions14/07/2021
CMP/220419/0009369-Maangalya Constructions19/04/2022
00071/2023-Maangalya Constructions17/01/2023
00023/2025-Maangalya Constructions03/01/2025
00024/2025-Maangalya Constructions03/01/2025

Documents filed48

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/180917/002010 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Registrar of Firms Form C.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect certificate Completed work.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate work Completed.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect certificate Pending work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer certificate Pending Work.pdf-
AffidavitFile: MP-SB ReraFormB For Extn Notarised.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: MP-SB Affidavit Under Section 18 of RERA ACT For Extn Notarised.pdf-
Document 2File: MP-SB ReraFormB For Extn Notarised.pdf-
Document 3File: BWSSB.pdf-
Document 4File: MP-SB OC ACK Letter.pdf-
Document 5File: NOC from AIRPORT (1)PLAN 404_17-18 .pdf-
Document 6File: NOC from Fire 2014 .pdf-
Document 7File: NOC from KSPCB 29-08-2015.pdf-
Document 8File: NOC from SEIAA MOEF.pdf-
Explanation for later submission of modified plan-
SITE PLAN-
Sale Deed-
Plan & Approval Letter-
Approved Plan & Receipt-
brouchers-
Project Specification-
EC-
Katha-
JDA-
GPA-
Conversion Order-
FIRE-
Airport Authority-
BESCOM-
BWSSB-
SEIAA-
BSNL-
SITE PLAN-
Balance Sheet 2016 - 2017File: Balance sheet 2016-17.pdf-
Balance Sheet 2015 - 2016File: balance sheet 2015-16.pdf-
Balance Sheet 2014 - 2015File: balance sheet 2014-15.pdf-
Audited Profit and Loss Statement 2016 - 2017File: profit and loss account 2016-17.pdf-
Audited Profit and Loss Statement 2015 - 2016File: profit and loss 2015-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: balance sheet 2014-15.pdf-
Auditor's Report 2016 - 2017File: auditor report.pdf-
Auditor's Report 2015 - 2016File: auditor report 2016-15.pdf-
Auditor's Report 2014 - 2015File: auditor report 14-15.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 2016-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 2015-16.pdf-
Form B-
Prospectus/BrochureFile: Maangalya Signature EDM.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_180917_002010.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Maangalya Prosper Signature Block on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Maangalya Constructions

Maangalya Constructions has 1 registration on RERA Karnataka, including Maangalya Prosper Signature Block. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Maangalya Prosper Signature Block is delayed beyond 30 Sep 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Maangalya Prosper Signature Block?

The registered promoter entity is Maangalya Constructions, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Maangalya Prosper Signature Block?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Maangalya Prosper Signature Block?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in Maangalya Prosper Signature Block?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Maangalya Prosper Signature Block. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Maangalya Prosper Signature Block to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.