Registration approved Residential/Group Housing project

LTCEL RAINTREE BOULEVARD CL4

By L&T Realty Developers Limited

RG-KA-65855 · RERA PRM/KA/RERA/1251/309/PR/181210/002204

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Sep 2022Possession promisedmoved 9 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 53 documents Report an error

LTCEL RAINTREE BOULEVARD CL4 is a Residential/Group Housing project by L&T Realty Developers Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/181210/002204 on 10 Dec 2018. Possession is promised by 30 Sep 2022. The completion date has moved by 9 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLTCEL RAINTREE BOULEVARD CL4
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/181210/002204
  • ReraGenie IDRG-KA-65855

Builder

  • NameL&T Realty Developers Limited
  • Entity typeCompany
  • CINU29119MH1997PLC109700
  • Authorized SignatoryK. Chandrashekar
  • OthersK. Chandrashekar
  • Other registrations5 more →

Key dates

this monthRegisteredDec 2018First promiseDec 2021Revised toSep 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on10 Dec 2018
  • Promised completion30 Sep 2022
  • Revised completionRevised to 30 Sep 2022 (originally 31 Dec 2021)
  • Buildings4 building records
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
T12---58058
T13---60060
T16---60060
T17---58058

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,532 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 257.50 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThomas Associates
EngineerCratis Designers Pvt. Ltd.

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2021 → Sep 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
CMP/190218/0002197-L&T Construction Equipment Limited - Realty Division18/02/2019

Documents filed53

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/181210/002204 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: LTCEL - Certificate of Incorporation.pdf-
CC-
06 BBMP Approved Plans 14 NOV-
181205_ Tower Site Area - Architect Signed-
Sale Deed-
Agreement for sale-
02 Sale deed 14 NOV-
PROJECT 04_BBMP SECTION-
07 Development Plan-
Allotment Letter-
Brochure Plan-
PROJECT SPECS-
04 EC 14 NOV-
01 New Khata certificate Khata Extract 14 NOV-
Agreement for sale-
181205_ Mutation Corridor-
181205_Mutation corridor & conversion order copy-
Re-Modified BDA Retification Relinquishment Deed-2018-
1 Revised New Fire NOC-
5 NOC from AAI-
2 BESCOM-
6 BWSSB-
3 NOC from KSPCB-
4 BSNL-
180917_Modified BBMP - Resi Phase 01 - R1-
PROJECT 04_BBMP SECTION-
Area Development Plan of Project Area-
Balance Sheet 2016 - 2017File: Balance Sheet 2016.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet 2015.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet 2014.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Profit and Loss Statement 2016.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit and Loss Account 2015.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit and Loss Statement 2014.pdf-
Director's Report 2016 - 2017File: Director's Report 2016.pdf-
Director's Report 2015 - 2016File: Director's Report 2015.pdf-
Director's Report 2014 - 2015File: Director's Report 2014.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow Statement 2016.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow Statement 2015.pdf-
Auditor's Report 2016 - 2017File: Auditor's Report 2016.pdf-
Auditor's Report 2015 - 2016File: Auditor's Report 2015.pdf-
Auditor's Report 2014 - 2015File: Auditor's Report 2014.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 2016.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 2015.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR 2014.pdf-
Declaration 4-
Prospectus/BrochureFile: PHASE 01 - BROCHURE.pdf-
Advertisement Copy 1File: CL4 Advertisement.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_181210_002204.xlsx-
Occupancy CertificateFile: OC - CL4.pdf-
Completion certificate issued by the competent authorityFile: OC - CL4.pdf-
Registered Agreement of SaleFile: AGREEMENT RBT13F0403.pdf-
Registered conveyance deed for an individual unitFile: RBT13F0403 SALE DEED.pdf-
InsuranceFile: FFA-R-202103-713 (1).pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep LTCEL RAINTREE BOULEVARD CL4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmLTCEL RAINTREE BOULEVARDOther 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: L&T Realty Developers Limited

L&T Realty Developers Limited has 6 registrations on RERA Karnataka, including LTCEL RAINTREE BOULEVARD CL 2 and LTCEL RAINTREE BOULEVARD CL1. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if LTCEL RAINTREE BOULEVARD CL4 is delayed beyond 30 Sep 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of LTCEL RAINTREE BOULEVARD CL4?

The registered promoter entity is L&T Realty Developers Limited, a company as per the filing. Its CIN U29119MH1997PLC109700 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in LTCEL RAINTREE BOULEVARD CL4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LTCEL RAINTREE BOULEVARD CL4?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at LTCEL RAINTREE BOULEVARD CL4?

The professionals named in the filing: Architect: Thomas Associates; Engineer: Cratis Designers Pvt. Ltd.. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LTCEL RAINTREE BOULEVARD CL4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LTCEL RAINTREE BOULEVARD CL4. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LTCEL RAINTREE BOULEVARD CL4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.