ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / LJTANNA PANORAMA A WING

Registered No litigation declared Residential / Group Housing project

LJTANNA PANORAMA A WING

By LJTANNA REALTY LLP

RG-MH-19242 · RERA P51700078323 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 75%
126 of 129Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

LJTANNA PANORAMA A WING is a Residential / Group Housing project by LJTANNA REALTY LLP in Thane, Maharashtra, registered with MahaRERA as P51700078323 on 4 Dec 2024. Possession is promised by 31 Dec 2029. 3 of the 129 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameLJTANNA PANORAMA A WING
  • TypeResidential / Group Housing
  • Location
    • Off Kalyan Thane Shil Road
    • Shankar Nagar
    • Sonarpada
    • Kalyan
    • Thane
    • 421203
  • Pincode421203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700078323
  • ReraGenie IDRG-MH-19242

Builder

  • NameLJTANNA REALTY LLP
  • Entity typeOthers
  • GSTIN27AAHFL7368P1ZE
  • Named personsLAXMIKANT JAMANADAS TANNA, PRASANNA BHAVANISHANKAR VYAS
  • PartnerMADHAVI TANNA TANNA
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredDec 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

2%3 of 129 units booked
47.3%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING - ANA24221290129

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

BUILDING - A: 61% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes50%
Street LightingYes60%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed251

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots251
Closed/Covered226
Open Space25

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,500 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jun 2025

Approvals and building plan

Sanctioning authorityKDMC
Permissible FSI7397.7
Proposed, not sanctioned7,398 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUnited India Bldg Sir P M Road Fort MUMBAI PIN 400001
Estimated costRs 34.00 cr
Cost incurredRs 16.08 cr
Work done47.28%
BuildingWingEstimatedIncurred
BUILDING - ANARs 31.29 crRs 13.59 cr
-NARs 2.71 crRs 2.49 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA S DASTANE & ASSOCIATES
EngineerKIRAN RAJENDRA PHIRKE
Chartered AccountantSAMIR SANGHAVI & ASSOCIATES
Chartered AccountantRAMESH M SHETH AND ASSOCIATES
Chartered AccountantKPGA and Associates LLP
PartnerRole in project
LJTANNA REALTY LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: LJTanna Panorama A- Form 1 Mar 26.pdf24 Apr 2026
Withdrawal Update Form 2File: LJTanna Panorama A- Form 2 Mar 26.pdf24 Apr 2026
Withdrawal Update Form 3File: LJTanna Panorama A- Form 3 Mar 26.pdf24 Apr 2026
Withdrawal Update Form 1File: FOR NO 1 Dec 2025.pdf9 Mar 2026
Withdrawal Update Form 2File: Form 2 Dec 2025.pdf9 Mar 2026
Withdrawal Update Form 3File: FORM 3 Dec 2025.pdf9 Mar 2026
Form 2A (FY 2024-2025)File: formno.2A-31-03-25.pdf18 Nov 2025
Form 5 (FY 2024-2025)File: Form No 5-31-3-25.pdf18 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf13 Nov 2025
Withdrawal Update Form 2File: form 2.pdf13 Nov 2025
Withdrawal Update Form 3File: Form 3 signed.pdf13 Nov 2025
Withdrawal Update Form 1File: FORM1.pdf31 Jul 2025
Withdrawal Update Form 2File: FORM- 2 JUN25.pdf31 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf31 Jul 2025
Withdrawal Update Form 1File: FORM1.pdf29 Jul 2025
Withdrawal Update Form 2File: FORM- 2 JUN25.pdf29 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf29 Jul 2025
Form 3File: FORM-3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: A WING INVENTORY DETAILS-31-12-2024.pdf25 Jul 2025
Form 1File: formno1-awing-311224.pdf25 Jul 2025
Form 2File: form2-awing-31122024.pdf25 Jul 2025
Form 1File: form-1.pdf16 Jun 2025
Form 2File: FORMNO 2-31-03-2025.pdf16 Jun 2025
Form 3File: FORMNO3-31-03-2025_compressed.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY-31-03-2025.pdf16 Jun 2025
form-129 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORMNO3-31-03-2025_compressed.pdf29 Apr 2025
FORMNO 2-31-03-202529 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY-31-03-2025.pdf29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: formno1-awing-31-12-24.pdf19 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_compressed (2).pdf19 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2-awing-31-12-2024.pdf19 Mar 2025
Disclosure of sold/ booked inventoryFile: A WING INVENTORY DETAILS.pdf19 Mar 2025
Building plan approvalFile: letterfromarchitect.pdf29 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: letterfromarchitect.pdf29 Nov 2024
Declaration about Commencement CertificateFile: Declaration for CC.pdf26 Nov 2024
Building plan approvalFile: Page4.pdf21 Nov 2024
Building plan approvalFile: Page3.pdf21 Nov 2024
Building plan approvalFile: Page2.pdf21 Nov 2024
Layout approvalFile: Page1.pdf21 Nov 2024
Copy of Layout Approval (in case of layout)File: Page1.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Page2.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Page3.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Page4.pdf21 Nov 2024
Proforma of Agreement for saleFile: RERA_AFS_6-11-2024.pdf21 Nov 2024
Proforma of Allotment letterFile: draft allotment letter 05-11-24.pdf6 Nov 2024
Proforma of Allotment letterFile: draft allotment letter 05-11-24.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3-04-11-2024.pdf4 Nov 2024
Other - TechnicalFile: Annexure A.pdf4 Nov 2024
Other - TechnicalFile: email.pdf4 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: BANKER DECLARATION-28-10-2024.pdf4 Nov 2024
Declaration in FORM BFile: FORMB-REVISED.pdf18 Oct 2024
Deviation Report with respect to Allotment letterFile: allotment letter-deviation report.pdf18 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation to Agreement.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AWING.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 1-A WING.pdf14 Oct 2024
Other - LegalFile: LLP DECLARATION CUM UNDERTAKING.pdf11 Oct 2024
Details of encumbrances concerned to FinanceFile: LLP DECLARATION OF NO ENCUMBRANCES.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: LJTANNA REALITY (-CC.pdf10 Oct 2024
CERSAI detailsFile: LLP NO CERSAI CHARGES.pdf10 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: LLP FORMAT A.pdf10 Oct 2024
Details of encumbrances concerned to LegalFile: LLP DECLARATION OF NO ENCUMBRANCES.pdf10 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure - Prasanna Vyas.pdf10 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure - Madhavi.pdf10 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: LLP LAXMIKANT TANNA DISCLOSURE OF INTEREST.pdf10 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: LLP DISCLOSURE OF SECURED UNSECURED FINANCE.pdf10 Oct 2024
PAN CardFile: 1 PAN Card.pdf5 Aug 2024
Copy of the legal title reportFile: TITLEREPORT-29-07-2024.pdf5 Aug 2024
Copy of the legal title reportFile: SEARCHREPORT-29-07-2024.pdf5 Aug 2024

How this compares with Thane

2%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LJTANNA PANORAMA A WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shankar Nagar7,600+ in Thane

2 kmLJTANNA PANORAMA A WINGCompleted 31Lapsed / revoked 20Other 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: LJTANNA REALTY LLP

LJTANNA REALTY LLP has 3 registrations on MahaRERA, including LJTANNA PANORAMA C WING and LJTANNA PANORAMA B WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if LJTANNA PANORAMA A WING is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LJTANNA PANORAMA A WING?

The registered promoter entity is LJTANNA REALTY LLP, an others as per the filing. Its GSTIN 27AAHFL7368P1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LJTANNA PANORAMA A WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LJTANNA PANORAMA A WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LJTANNA PANORAMA A WING?

The professionals named in the filing: Architect: A S DASTANE & ASSOCIATES; Engineer: KIRAN RAJENDRA PHIRKE; Chartered Accountant: SAMIR SANGHAVI & ASSOCIATES; Chartered Accountant: RAMESH M SHETH AND ASSOCIATES; Chartered Accountant: KPGA and Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LJTANNA PANORAMA A WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LJTANNA PANORAMA A WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LJTANNA PANORAMA A WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.