ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Life By The Lake

Registration approved Residential/Group Housing project

Life By The Lake

By Keya Homes Pvt Ltd

RG-KA-71610 · RERA PRM/KA/RERA/1251/309/PR/210119/003787 · Last updated on RERA Karnataka portal: 12 Jan 2021

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2022Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 83 documents Report an error

Life By The Lake is a Residential/Group Housing project by Keya Homes Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/210119/003787 on 19 Jan 2021. Possession is promised by 30 Jun 2022.

At a glance

Project

  • NameLife By The Lake
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/210119/003787
  • ReraGenie IDRG-KA-71610

Builder

  • NameKeya Homes Pvt Ltd
  • Entity typeCompany
  • CINU70109KA2013PTC068958
  • Authorized SignatoryDinesh Kejriwal
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2021PromisedJun 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on19 Jan 2021
  • Promised completion30 Jun 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---39039
B---14014

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 12 Jan 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 12 Jan 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,522 sq m
Named landowners2
LandownerVillageDistrict
Keya Homes Pvt Ltd--
CHAITANYA MANOHAR & VISTA CAPITAL LLP--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 68.53 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectstudio PARAMETRIC
EngineerA.Ramachandran

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed83

As listed on the registration, under the names the promoter filed them with; the newest 80 of 83 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/210119/003787 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Basement PlanFile: 1_compressed.pdf12 Jan 2021
Ground FloorFile: 2_compressed.pdf12 Jan 2021
First FloorFile: 3_compressed.pdf12 Jan 2021
Second FloorFile: 4_compressed.pdf12 Jan 2021
Third FloorFile: 5_compressed.pdf12 Jan 2021
Terrace PlanFile: 6_compressed.pdf12 Jan 2021
Master plan and elevationFile: 7_compressed.pdf12 Jan 2021
Upload project head details, bank account name must be as per bank account direction circularFile: Bank Document.pdf30 Sep 2020
Explanation documentFile: Rera.pdf30 Sep 2020
It has been mentioned has modified plan sanctioned on 16.10.2017 regarding the sanctioned earlier dFile: IMG_2741.JPG30 Sep 2020
plan sanction letter not uploadedFile: Modified Plan.pdf20 Sep 2020
Explanation DocumentFile: RERA REPLY.pdf20 Sep 2020
Commencement certificateFile: 09 Commencement Certificate.pdf20 Sep 2020
HDFC Bank LetterFile: HDFC Letter.pdf20 Sep 2020
CA UDIN to 2018-19 financial statementFile: 6_KHPL Financials and audit report - 31 March 2019_compressed.pdf9 Sep 2020
Conversion orders issued by the Deputy Commissioner BengaluruFile: 045 - Conversion copy.pdf9 Sep 2020
Notarized Form-B is not uploadedFile: Form B.pdf9 Sep 2020
Notarized Joint Affidavit cum Declaration is not uploadedFile: affadavit cum declaration.pdf9 Sep 2020
sanctioned plan to be uploaded.File: Binder1_compressed.pdf9 Sep 2020
bank account name must be as per bank account direction circularFile: Change of account name as per RERA, LBL.pdf9 Sep 2020
CertificateFile: reraDocument.pdf-
09 Commencement Certificate-
10 Approved Plan_compressed-
11 Approved Layout Plan-
LBL Standard Sale Deed 2020-
LBL Draft ATS 2020-
13 Sale Deed Keya-
10 Approved Plan_compressed-
10 Approved Plan_compressed-
16 ALLOTMENT LETTER-
17 brochure_compressed-
SCHEDULE-
08 EC LBL-
Affidavit-
Affidavit cum Declaration LBL pdf-
22 Khata document-
20 JD Agreement-
23 Any Other Document-
25 Conversion-
26 KTCP-
48-50 Ultisation & TDR-
48-50 Ultisation & TDR-
48-50 Ultisation & TDR-
27 Fire Force-
28 Airport-
29 BESCOM-
30 BWSSB -
31 Pollution Clearance-
32 Final Env Clearnace_compressed-
33-35 NA-
41-46 NA copy-
Unnamed document-
37-39 NA -
37-39 NA -
41-46 NA copy-
41-46 NA copy-
41-46 NA copy-
41-46 NA copy-
41-46 NA copy-
40 Plan Section-
33-35 NA-
36 Section Plan-
37-39 NA -
47 Legal Opinion-
Balance Sheet 2017 - 2018File: 6_KHPL Financials and audit report - 31 March 2019_compressed.pdf-
Balance Sheet 2016 - 2017File: 5_KHPL Financials and audit report - 31 March 2018_compressed.pdf-
Audited Profit and Loss Statement 2017 - 2018File: 6_KHPL Financials and audit report - 31 March 2019_compressed.pdf-
Audited Profit and Loss Statement 2016 - 2017File: 5_KHPL Financials and audit report - 31 March 2018_compressed.pdf-
Director's Report 2017 - 2018File: 6_KHPL Board report complete set 31 March 2019_compressed.pdf-
Director's Report 2016 - 2017File: 5_KHPL Board report complete set 31 March 2018_compressed.pdf-
Cash Flow Statement 2017 - 2018File: 6_KHPL Financials and audit report - 31 March 2019_compressed.pdf-
Auditor's Report 2017 - 2018File: 6_KHPL Financials and audit report - 31 March 2019_compressed.pdf-
Auditor's Report 2016 - 2017File: 5_KHPL Financials and audit report - 31 March 2018_compressed.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: 6_ITR Acknowledgment for 2018-19.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: 5_ITR Acknowledgment for 2017-18.pdf-
Form B Declaration-
Appeal 1 Order CopyFile: 4209 (1).pdf-
Prospectus/BrochureFile: 17 brochure_compressed.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_210119_003787.xlsx-
Occupancy CertificateFile: LBL OC 190522.pdf-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
The Green Terraces-Completed-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Life By The Lake on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Keya Homes Pvt Ltd

keya homes pvt ltd has 3 registrations on RERA Karnataka, including The green terraces and Life By The Lake. Its filings declare 2 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Life By The Lake is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Life By The Lake?

The registered promoter entity is Keya Homes Pvt Ltd, a company as per the filing. Its CIN U70109KA2013PTC068958 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Life By The Lake?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Life By The Lake?

The professionals named in the filing: Architect: studio PARAMETRIC; Engineer: A.Ramachandran. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Life By The Lake?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Life By The Lake. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Life By The Lake to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.