Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Mar 2021Possession promisedmoved 12 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 60 documents Report an error

Legacy Cirocco is a Residential/Group Housing project by Legacy Global Projects Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/171016/000900 on 16 Oct 2017. Possession is promised by 31 Mar 2021. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLegacy Cirocco
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/171016/000900
  • ReraGenie IDRG-KA-96366

Builder

  • NameLegacy Global Projects Private Limited
  • Entity typeCompany
  • CINU74140KA2008PTC044851
  • Authorized SignatorySanjay Shenoy
  • DirectorsVinay Ambardekar, Rakesh Prabhu, B H Krishnamurthy
  • Other registrations9 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredOct 2017First promiseMar 2020Revised toMar 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on16 Oct 2017
  • Promised completion31 Mar 2021
  • Revised completionRevised to 31 Mar 2021 (originally 31 Mar 2020)
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LEGACY CIROCCO---94094

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 13 Sep 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Basement 1 Slab-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 13 Sep 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,691 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 132.70 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFHD Consultants Private Limited
EngineerAnagha Engineering Consultants

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/309/PR/220620/000900Mar 2020 → Mar 2021

Reason as filed by the promoterFinancial crunch; Force Majeure

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
CMP/220730/0009827-Legacy Global Projects Private Limited30/07/2022

Documents filed60

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/171016/000900 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
List of Unit Sold and unsoldFile: List of sold unit and unsold units.pdf13 Sep 2021
Form BFile: Form B.pdf19 Oct 2020
Form Ex-7File: Form Ex7.pdf19 Oct 2020
List of sold and unsold unitsFile: List of sold unit and unsold units.pdf19 Oct 2020
CertificateFile: IOC.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Legacy Cirocco.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Legacy Cirocco.pdf-
CA Certificate for Funds UtilizationFile: Legacy Cirocco.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Legacy Cirocco.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Legacy Cirocco.pdf-
CA Certificate for Funds required for Project CompletionFile: Legacy Cirocco.pdf-
AffidavitFile: Legacy Cirocco.pdf-
Latest Encumbrance CertificateFile: Legacy Cirocco.pdf-
Details Of Sold/ Un-sold UnitsFile: Legacy Cirocco.pdf-
Document 1File: Legacy Cirocco - Letter.pdf-
CC-
Approved Building Plan-
Layout Plan-
Sale Deed-
Agreement Of Sale-
Title Deed & RTC-
Approved section of Building-
Area Development Plan of Project Area-
Apartment Allotment Letter-
Brochures-
All NOCs-
Specification List-
EC 12years-
Khatha Certificate-
Legacy Cirocco JDA-
Mutation & Title Investigation Report-
Converison Order-
FIRE NOC-
AAI NOC-
BESCOM NOC-
BWSSB NOC-
KSPCB NOC-
MOEF NOC-
BSNL NOC-
Balance Sheet 2015 - 2016File: LGP AY 16-17 Balance Sheet (2).pdf-
Balance Sheet 2014 - 2015File: LGP AY 15-16 Balance sheet.pdf-
Balance Sheet 2013 - 2014File: LGP AY 14-15 Balance Sheet1.pdf-
Audited Profit and Loss Statement 2015 - 2016File: LGP AY 16-17 P&L.pdf-
Audited Profit and Loss Statement 2014 - 2015File: LGP AY 15-16 P&L.pdf-
Audited Profit and Loss Statement 2013 - 2014File: LGP AY 14-15 P&L.pdf-
Director's Report 2015 - 2016File: LGP AY 16-17 Directors Report1.pdf-
Director's Report 2014 - 2015File: LGP AY 15-16 Directors Report.pdf-
Director's Report 2013 - 2014File: LGP AY 2014-15 Directors Report1.pdf-
Cash Flow Statement 2015 - 2016File: LGP AY 16-17 Cash Flow Statement.pdf-
Cash Flow Statement 2014 - 2015File: LGP AY 15-16 Cash Flow Statement.pdf-
Auditor's Report 2015 - 2016File: LGP AY 16-17 Auditros Report1.pdf-
Auditor's Report 2014 - 2015File: LGP AY 15-16 Auditros report.pdf-
Auditor's Report 2013 - 2014File: LGP AY 14-15 Auditors Report.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: LGP AY 16-17 ITR Ack.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: LGP AY 15-16 ITR Ack.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: LGP AY 14-15 ITR Ack.pdf-
Form B-
Prospectus/BrochureFile: Legacy Cirocco e-brochure.pdf-
Advertisement Copy 1File: Advertisement Info.pdf-
Tower Excel SheetFile: Legacy Cirocco Uint Wise Details.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Legacy Cirocco on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmLegacy CiroccoOther 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 40 registered projects within 2 km.

Builder: Legacy Global Projects Private Limited

Legacy Global Projects Private Limited has 10 registrations on RERA Karnataka, including Legacy Eldora and Legacy Salvador. Its filings declare 6 earlier projects, 6 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Legacy Cirocco is delayed beyond 31 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Legacy Cirocco?

The registered promoter entity is Legacy Global Projects Private Limited, a company as per the filing. Its CIN U74140KA2008PTC044851 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Legacy Cirocco?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Legacy Cirocco?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Legacy Cirocco?

The professionals named in the filing: Architect: FHD Consultants Private Limited; Engineer: Anagha Engineering Consultants. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Legacy Cirocco?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Legacy Cirocco. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Legacy Cirocco to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.