Registration approved Residential/Group Housing project

Leaves & Lives Phase 2

By APG Intelli Homes Private Limited

RG-KA-27317 · RERA PRM/KA/RERA/1251/446/PR/210928/004328 · Last updated on RERA Karnataka portal: 25 Nov 2024

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Sep 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 75 documents Report an error

Leaves & Lives Phase 2 is a Residential/Group Housing project by APG Intelli Homes Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/210928/004328 on 28 Sep 2021. Possession is promised by 30 Sep 2024.

At a glance

Project

  • NameLeaves & Lives Phase 2
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/210928/004328
  • ReraGenie IDRG-KA-27317

Builder

  • NameAPG Intelli Homes Private Limited
  • Entity typeCompany
  • CINU70100KA2014PTC077189
  • Authorized SignatoryAkshay Kishore Diwani
  • DirectorsSachin Vora, Akshay Kishore Diwani
  • Other registrations6 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2021PromisedSep 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on28 Sep 2021
  • Promised completion30 Sep 2024
  • Revised completionNone
  • Buildings4 building records
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUIKDING 7---606
BUILDING 8---10010
BUILDING 9---10010
BUILDING 10---606

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 25 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 25 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Staircases and Lift lobbies, corridor,lobbies, corridorNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceNoNot applicable
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,689 sq m
Named landowners1
LandownerVillageDistrict
APG Intelli Homes Private Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 57.74 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManoj Ladhad Architecture paradigm
EngineerNeminath P Parigond Cratis Designers Pvt Ltd

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed75

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/210928/004328 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Clarification regarding plan sanctionFile: Clarification regrading plan renewal.pdf25 Nov 2024
EC from 27/8/2021File: Updated EC.pdf8 Oct 2024
Clarification regrading plan renewalFile: Clarification regrading plan renewal.pdf8 Oct 2024
Clarification LetterFile: Annexure 12-Clarification Letter.pdf9 Sep 2021
Demark Plan for the PhaseFile: Annexure 1-Demark Plan for the Phase.pdf9 Sep 2021
UDIN -FinancialFile: Annexure 3-CA UDIN (Financial).pdf9 Sep 2021
Clearly Visible Site PlanFile: Annexure 4-Clearly Visible site Plan.pdf9 Sep 2021
Plan Specifying total Area of landFile: Annexure 5-Plan specifying total area of Land.pdf9 Sep 2021
Affidavit -Form BFile: Annexure 6-Affidavit Form B.pdf9 Sep 2021
Affidavit of ViolationFile: Annexure 7-Affidavit of Violation.pdf9 Sep 2021
Project SpecificationFile: Annexure 8-Project Specification.pdf9 Sep 2021
Confirming total Area of land Matching with DrawingsFile: Annexure 9-Confirming total Area of Land Matching with the Drawings.pdf9 Sep 2021
Bescom NOCFile: Annexure 10-Bescom NOC.pdf9 Sep 2021
Water NOCFile: Annexure -11 Water NOC.pdf9 Sep 2021
CertificateFile: Annexure A-COI.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect Certificate-Work Completion.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate for Work Completed.pdf-
CA Certificate for Funds UtilizationFile: CA certificate - fund utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Certificate-Work Pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer Certificate for Work pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA certificate - funds required.pdf-
AffidavitFile: Affidavit for extension.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Relevant Document/sFile: Form B.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: Delay Compensation.pdf-
Annexure 10a-Commencement Certificate-
Annexure 10b-Approved Building Plan-
Annexure 17- Leaves & Lives - Phase 2 - Proforma for Sale Deed_F-
Annexure 11- Leaves & Lives Phase-2-R - Proforma of Agreement for Sale-
Annexure 12- Sale deed & RTC-
Annexure 13 -Approved Section of Building-
Annexure 14 - Area Development Plan-
Annexure 15 - Proforma of Allotment Letter-
Annexure 16 -Leaves & Lives-Phase 2-Brochure-
Annexure 18 - Leaves & Lives Phase 2 - Specifications-
Annexure 9-Latest EC-
Annexure -H Affidavit of Violation-
Annexure 19 - Khata-
Annexure 20-Conversion Certificate-
Annexure 27 - Relinquishment Deed-
Annexure 21 - AAI Approval-
Annexure 29 - KSPCB-
Annexure 22 - SEIAA Approval-
Annexure 23 - BSNL Approval-
Unnamed document-
Annexure 25 -Sectional Drawings of Row houses-
Annexure 24 -Existing Section Plan-
Annexure 26-Advocate Search Report-
Balance Sheet 2019 - 2020File: Not yet Audited.pdf-
Balance Sheet 2018 - 2019File: Annexure 1c-BS 19-20.pdf-
Balance Sheet 2017 - 2018File: Annexure 1b-BS 18-19.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Not yet Audited.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Annexure 2c-P&L 19-20.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Annexure 2b-P&L 18-19.pdf-
Director's Report 2019 - 2020File: Not yet Audited.pdf-
Director's Report 2018 - 2019File: Annexure 3c-DR 19-20.pdf-
Director's Report 2017 - 2018File: Annexure 3b-DR 18-19.pdf-
Cash Flow Statement 2019 - 2020File: Not yet Audited.pdf-
Cash Flow Statement 2018 - 2019File: Annexure 4C-CF 19-20.pdf-
Auditor's Report 2019 - 2020File: Not yet Audited.pdf-
Auditor's Report 2018 - 2019File: Annexure 5c-AR 19-20.pdf-
Auditor's Report 2017 - 2018File: Annexure 5b-AR 18-19.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: Not yet Audited.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: Annexure 6c-ITR 19-20.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: Annexure 6b-ITR 18-19.pdf-
Annexure G-Form B-
Prospectus/BrochureFile: E-version - Leaves & Lives Phase 2.pdf-
Advertisement Copy 1File: GS_LL-1080x1920.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_210928_004328.xlsx-
Occupancy CertificateFile: Occupancy Certificate.pdf-
Completion certificate issued by the competent authorityFile: Completion certificate.pdf-
Registered Agreement of SaleFile: Agreement to sale.pdf-
Registered conveyance deed for an individual unitFile: Sale deed.pdf-
InsuranceFile: Insurance Policy.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Leaves & Lives Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmLeaves & Lives Phase 2Other 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: APG Intelli Homes Private Limited

APG Intelli Homes Private Limited has 7 registrations on RERA Karnataka, including 63 Degree East - Tower C & D and Leaves & Lives Phase 1. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Leaves & Lives Phase 2 is delayed beyond 30 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Leaves & Lives Phase 2?

The registered promoter entity is APG Intelli Homes Private Limited, a company as per the filing. Its CIN U70100KA2014PTC077189 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Leaves & Lives Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Leaves & Lives Phase 2?

The professionals named in the filing: Architect: Manoj Ladhad Architecture paradigm; Engineer: Neminath P Parigond Cratis Designers Pvt Ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Leaves & Lives Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Leaves & Lives Phase 2. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Leaves & Lives Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.