Red flags
- Registration lapsed
- Possession 16 months past the filed date
- Completion date moved by 6 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Laxmi Heights is a Residential / Group Housing project by Pankajkumar & Co. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800019941 on 15 Mar 2019. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 6 months from the original filing. 17 of the 29 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameLaxmi Heights
- TypeResidential / Group Housing
- Location
- Station Road
- Vikhroli West
- Kurla
- Mumbai Suburban
- 400083
- Pincode400083
- RERA no.P51800019941
- ReraGenie IDRG-MH-92739
Builder
- NamePankajkumar & Co.
- Entity typePartnership
- PartnersNaresh Kumar Laxmikant Paliwal, Pankaj Bhanwerlal Paliwal, Ashok Pratapchand Savani
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on15 Mar 2019
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed63 files
Current status
Figures as on 23 Sep 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Laxmi Heights | NA | 13 | 13 | 29 | 0 | 29 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Laxmi Heights: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 23 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ellora Project Consultants Pvt Ltd |
| Engineer | Aryaa Realty |
| Chartered Accountant | Shah & Ramaiya |
| Chartered Accountant | jrsm and associates |
| Partner | Role in project |
|---|---|
| Pankajkumar & Co. | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir, With reference to the captioned subject, we would like to inform your goodself that our project ‘LAXMI HEIGHTS’ is registered on the MahaRERA webportal vide Registration Number: P51800019941. The registration certificate was issued for the period ending 31 December 2023 (A copy of the certificate is attached herewith as Annexure 1). With reference to the above, we would like to inform you that there has been delay in obtaining various permissions required to complete the building. We request you to extend the project completion date by a further twelve months, by the end of which we
Reason as filed by the promoterDear sir, We request your goodsef to kindly grant extension of further 6 months. We have completed the construction of the building and is ready for possession. We have further initiated the process for obtaining Occupation Certificate (OC). There has been a delay in obtaining the OC due to the unavailability of authorities during the State Elections. We are confident that we will obtain the OC before 30 June 2025. Kindly take the above on records and oblige.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jan 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Mar 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jan 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_JAN.pdf | 23 Sep 2025 |
| Withdrawal Update Form 2File: Form 2_Pankajkumar_Sep 23.pdf | 23 Sep 2025 |
| Withdrawal Update Form 3File: Form 3_Sept 23_Signed.pdf | 23 Sep 2025 |
| Declaration in FORM BFile: affidavit cum declaration.pdf | 19 Mar 2025 |
| Certificates of CA (Form 3)File: form 3_dec 24_organized.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold disclosure_latest.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2324 (1).pdf | 19 Mar 2025 |
| Other - TechnicalFile: list of activities rera 31_12_24.pdf | 11 Mar 2025 |
| Certificates of CA (Form 3)File: form 3_dec 24.pdf | 5 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2324.pdf | 4 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_JAN.pdf | 5 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2_jan 25.pdf | 5 Feb 2025 |
| Declaration in FORM BFile: affidavit cum declaration rera.pdf | 2 Jan 2025 |
| Certificates of CA (Form 3)File: form 3 final.pdf | 2 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold disclosure.pdf | 2 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 23 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Revised Rera Form 2.pdf | 23 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_updated.pdf | 23 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_updated.pdf | 5 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf | 28 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 26 Dec 2023 |
| Declaration in FORM BFile: affidavit cum declaration for RERA.pdf | 25 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Pankajkumar_Sep 23.pdf | 25 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3_Sept 23_Signed.pdf | 25 Dec 2023 |
| Declaration in FORM BFile: Disclose of sold Flats.pdf | 22 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclose of sold Flats.pdf | 22 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rera architect certificate 30_3_23.pdf | 9 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rera architect certificate 30_6_23.pdf | 9 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rera architect certificate 30_9_23.pdf | 9 Nov 2023 |
| Certificates of CA (Form 3)File: PANKAJ KUMAR 1.pdf | 2 Oct 2023 |
| Certificates of CA (Form 3)File: PANKAJ KUMAR 2.pdf | 2 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-21.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-22.pdf | 21 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera form 1 DTD 31_12_22.pdf | 8 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera form 1 DTD 31_12_22.pdf | 8 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Pankaj Kumar Co.pdf | 8 Feb 2023 |
| Certificates of CA (Form 3)File: Pankaj Kumar Co_Form 3_compressed.pdf | 8 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: further cc 28_1_2019.pdf | 12 Nov 2021 |
| Layout approvalFile: 3rd and 4 th Floor plan.pdf | 9 Mar 2019 |
| Layout approvalFile: Basement.pdf | 9 Mar 2019 |
| Layout approvalFile: Ground Floor.pdf | 9 Mar 2019 |
| Layout approvalFile: 14th,15th,upto 17th.pdf | 9 Mar 2019 |
| Layout approvalFile: 5th ,6th,7th,8th upto 13th Floor plan.pdf | 9 Mar 2019 |
| Layout approvalFile: 1st and 2nd Floor plan.pdf | 9 Mar 2019 |
| Copy of Layout Approval (in case of layout)File: 3rd and 4 th Floor plan.pdf | 9 Mar 2019 |
| Copy of Layout Approval (in case of layout)File: Basement.pdf | 9 Mar 2019 |
| Copy of Layout Approval (in case of layout)File: Ground Floor.pdf | 9 Mar 2019 |
| Copy of Layout Approval (in case of layout)File: 14th,15th,upto 17th.pdf | 9 Mar 2019 |
| Copy of Layout Approval (in case of layout)File: 5th ,6th,7th,8th upto 13th Floor plan.pdf | 9 Mar 2019 |
| Copy of Layout Approval (in case of layout)File: 1st and 2nd Floor plan.pdf | 9 Mar 2019 |
| Declaration in FORM BFile: Form B.pdf | 5 Mar 2019 |
| Proforma of Allotment letterFile: RERA agreement for sale final (without track).pdf | 18 Feb 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate FORM 2A.pdf | 28 Jan 2019 |
| Certificates of CA (Form 3)File: Laxmi Heights - Form 3.pdf | 23 Jan 2019 |
| PAN CardFile: Partners PAN Card.pdf | 17 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect Form for Rera.pdf | 16 Jan 2019 |
| Building plan approvalFile: IOA.pdf | 14 Jan 2019 |
| Copy of the legal title reportFile: Pkj Notes on Title.pdf | 14 Jan 2019 |
| Building Plan Approval (IOD)File: IOA.pdf | 14 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 14 Jan 2019 |
| PAN CardFile: Pankaj Kumar And Co Pan card.pdf | 19 Dec 2018 |
| Details of encumbrancesFile: self Declaration for Rera.pdf | 19 Dec 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 63 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Laxmi Heights on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vikhroli West6,700+ in Mumbai Suburban
Cons 1221 MIG T/S and 100 Shops S. No. 113 (pt
Mumbai Housing And Area Development Board
Om Siddhivinayak CHS and Gurukrupa CHS
Shreeji Developers
AKASSH AMAZONIA TOWER 1
HEER MEHTA LANDMARK DEVELOPERS PRIVATE LIM
Ajmera Solis
Shree Yogi Realcon Private Limited
CENTRAL PARK
V LAXMI NURSES DEVELOPERS LLP
Swastik Platinum
SUVASYA BUILDERS AND DEVELOPERS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Pankajkumar & Co.
Pankajkumar & Co. has 1 registration on MahaRERA, including Laxmi Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Laxmi Heights shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Laxmi Heights is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Laxmi Heights?
The registered promoter entity is Pankajkumar & Co., a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Laxmi Heights?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Laxmi Heights?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Laxmi Heights?
The professionals named in the filing: Architect: Ellora Project Consultants Pvt Ltd; Engineer: Aryaa Realty; Chartered Accountant: Shah & Ramaiya; Chartered Accountant: jrsm and associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Laxmi Heights?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback