Registration approved No litigation declared Mixed Development project

LAKSHMI DWARAKA

By RAJGOPAL

RG-KA-23408 · RERA PRM/KA/RERA/1273/318/PR/110522/004878 · Last updated on RERA Karnataka portal: 4 Apr 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2024Possession promisedno revision filed
0 of 15Construction stages donefurthest along: Earth work and other leveling..., 0%
26 of 26Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 85 documents Report an error

LAKSHMI DWARAKA is a Mixed Development project by RAJGOPAL in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/318/PR/110522/004878 on 11 May 2022. Possession is promised by 31 Dec 2024. 0 of the 26 units on this registration are recorded sold or booked, and 0 of 15 construction stages are filed complete.

At a glance

Project

  • NameLAKSHMI DWARAKA
  • TypeMixed Development
  • Location
    • Udupi
    • 576101
  • Pincode576101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1273/318/PR/110522/004878
  • ReraGenie IDRG-KA-23408

Builder

  • NameRAJGOPAL
  • Entity typeProprietorship Firm
  • GSTIN29ABBPR9972Q1ZF
  • Authorized SignatoryRAJGOPAL

Key dates

this monthRegisteredMay 2022PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 May 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Current status

0%0 of 26 units booked

Figures as on 4 Apr 2022, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LAKSHMI DWARAKA-----26

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 4 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 15 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.

Building: 0% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 4 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasYes-
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area957 sq m
Land owned byNot the promoter
Named landowners2
LandownerVillageDistrict
S RAJGOPAL ACHARYA--
S RAJGOPAL ACHARYA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.00 cr
BuildingWingEstimatedIncurred
-NARs 4.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGISHCHANDRA DHARA
EngineerM GOPAL BHAT
Chartered AccountantJEEVAN SHETTY

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed85

As listed on the registration, under the names the promoter filed them with; the newest 80 of 85 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/318/PR/110522/004878 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Extract of master planFile: master plan of project.pdf4 Apr 2022
proforma AOSFile: proforma AOS FINAL.pdf4 Apr 2022
proforma sale deedFile: profroma sale deed final.pdf4 Apr 2022
water noc self attestedFile: water noc self attested.pdf4 Apr 2022
power noc self attestedFile: mescom noc self attested.pdf4 Apr 2022
clarificationFile: clarification.pdf4 Apr 2022
RTC, survey 50/15E1P2-
Mutation, survey 50/15E1P2-
Encumbrance Certificate, survey 50/15E1P2-
Conversion/Alienation Order, survey 50/15E1P2-
Sale/Title/Gift Deed, survey 50/15E1P2-
Khatha, survey 50/15E1P2-
RTC, survey 50/15EP5-
Mutation, survey 50/15EP5-
Encumbrance Certificate, survey 50/15EP5-
Conversion/Alienation Order, survey 50/15EP5-
Sale/Title/Gift Deed, survey 50/15EP5-
Khatha, survey 50/15EP5-
Registration CertificateFile: gst certficate.pdf-
Certificate issued by CA Form 1File: form 1 ca certifcate.pdf-
Certificate issued by Architect Form 2File: ARCHITECT CERTIFICATE.pdf-
Certificate issued by Engineer Form 3File: ENGINEERS CERTIFICATE.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: litigation affidavith.pdf-
Certificate from Chartered AccountFile: approval certficate.jpeg-
Balance Sheet 2020 - 2021File: BS 21-22.pdf-
Balance Sheet 2019 - 2020File: BS 20-21.pdf-
Audited Profit and Loss Statement 2020 - 2021File: p&l 21-22.pdf-
Audited Profit and Loss Statement 2019 - 2020File: p&l 20-21.pdf-
Cash Flow Statement 2020 - 2021File: income statement 21-22.pdf-
Cash Flow Statement 2019 - 2020File: Income statment 20-21.pdf-
Auditor's Report 2020 - 2021File: AR 21-22.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 21-22.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 2020-21.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: itr 2019-20.pdf-
building licence-
approved sanction plan-
approved sanction plan-
SINGLE LAYOUT-
SINGLE LAYOUT-
SINGLE LAYOUT-
specification-
approved sanction plan-
approved sanction plan-
STABILTY CERTIFICATE-
title deed of koragappa suvarna-
title deed of geeta-
proforma AOS-
allotment letter-
broucher-
form b-
affidavith 3(1)-
mescom noc-
water noc-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
POLLUTION NOC_compressed-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
danapathra-
POLLUTION NOC-
guidance value-
stp project report-
stp drawing-
HEALTH NOC-
danapathra-
Prospectus/BrochureFile: broucher.pdf-
Occupancy CertificateFile: OC.pdf-

How this compares with Udupi

0%of this project is bookeddistrict median 0%
22%of Udupi projects moved their completion datethis one has not
0%of Udupi registrations have lapsed or been cancelledthis one is on the register

Computed across the 260+ Udupi projects on ReraGenie, from their own filings.

Keep LAKSHMI DWARAKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Udupi260+ in Udupi

2 kmLAKSHMI DWARAKAOther 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: RAJGOPAL

RAJGOPAL has 1 registration on RERA Karnataka, including LAKSHMI DWARAKA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Udupi district page.

Frequently asked questions

What are my rights if LAKSHMI DWARAKA is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of LAKSHMI DWARAKA?

The registered promoter entity is RAJGOPAL, a proprietorship firm as per the filing. Its GSTIN 29ABBPR9972Q1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in LAKSHMI DWARAKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at LAKSHMI DWARAKA?

The professionals named in the filing: Architect: YOGISHCHANDRA DHARA; Engineer: M GOPAL BHAT; Chartered Accountant: JEEVAN SHETTY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAKSHMI DWARAKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAKSHMI DWARAKA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAKSHMI DWARAKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.