LAIJAI NAGARI 14/A/1
RG-MH-00735 · RERA P51100002964 · Last updated on MahaRERA portal: 17 Feb 2021
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Nanded registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LAIJAI NAGARI 14/A/1 is a Residential / Group Housing project by KAMLESH BACHEWAR in Nanded, Maharashtra, registered with MahaRERA as P51100002964 on 4 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021.
At a glance
Project
- NameLAIJAI NAGARI 14/A/1
- TypeResidential / Group Housing
- Location
- Wadi Bk.
- Nanded
- 431605
- Pincode431605
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51100002964
- ReraGenie IDRG-MH-00735
Builder
- NameKAMLESH BACHEWAR
- Entity typeCompany
- ChairpersonsUTTAM KISHANRAO BACHEWAR, ASHWINI KAMLESH BACHEWAR, REKHA UTTAMRAO BACHEWAR
- Managing DirectorKAMLESH UTTAMRAO BACHEWAR
- Other registrations1 more →
- Completed2 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Aug 2017
- Promised completion30 Dec 2021
- Revised completionNone
- Buildings55 building records
- Documents filed37 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ROW HOUSE NO 8 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 9 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 10 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 11 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 12 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 13 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 14 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE 15 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 16 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 17 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 18 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 19 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 20 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 21 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 22 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 23 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 24 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 25 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 26 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 27 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 28 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 29 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 30 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 31 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 32 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 33 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 34 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 35 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 36 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 37 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 38 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 39 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 40 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 41 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 42 | NA | 0 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 43 | NA | 0 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 44 | NA | 0 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 45 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 46 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 47 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 48 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 49 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 50 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 51 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 52 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 53 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 54 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 55 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 56 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 57 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 58 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 59 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 60 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 61 | NA | 3 | 0 | 0 | 0 | 0 |
| ROW HOUSE NO 62 | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 17 Feb 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 55 buildings; the table lists the first 20.
385 of 605 construction stages are filed complete across 55 buildings. The stage furthest along is Podiums (if any), at 0%.
ROW HOUSE NO 864%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 964%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 1064%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 1164%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 1264%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 1364%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 1464%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE 1564%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 1664%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 1764%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 1864%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 1964%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 2064%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 2164%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 2264%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 2364%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 2464%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 2564%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 2664%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROW HOUSE NO 2764%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Feb 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| ROW HOUSE NO 8 | 1 | 1 |
| ROW HOUSE NO 9 | 1 | 1 |
| ROW HOUSE NO 10 | 1 | 1 |
| ROW HOUSE NO 11 | 1 | 1 |
| ROW HOUSE NO 12 | 1 | 1 |
| ROW HOUSE NO 13 | 1 | 1 |
| ROW HOUSE NO 14 | 1 | 1 |
| ROW HOUSE 15 | 1 | 1 |
| ROW HOUSE NO 16 | 1 | 1 |
| ROW HOUSE NO 17 | 1 | 1 |
| ROW HOUSE NO 18 | 1 | 1 |
| ROW HOUSE NO 19 | 1 | 1 |
| ROW HOUSE NO 33 | 1 | 1 |
| ROW HOUSE NO 34 | 1 | 1 |
| ROW HOUSE NO 35 | 1 | 1 |
| ROW HOUSE NO 36 | 1 | 1 |
| ROW HOUSE NO 37 | 1 | 1 |
| ROW HOUSE NO 38 | 1 | 1 |
| ROW HOUSE NO 39 | 1 | 1 |
| ROW HOUSE NO 40 | 1 | 1 |
| ROW HOUSE NO 41 | 1 | 1 |
| ROW HOUSE NO 45 | 1 | 1 |
| ROW HOUSE NO 46 | 1 | 1 |
| ROW HOUSE NO 47 | 1 | 1 |
| ROW HOUSE NO 48 | 1 | 1 |
| ROW HOUSE NO 49 | 1 | 1 |
| ROW HOUSE NO 50 | 1 | 1 |
| ROW HOUSE NO 51 | 1 | 1 |
| ROW HOUSE NO 52 | 1 | 1 |
| ROW HOUSE NO 53 | 1 | 1 |
Land and ownership6
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PANDITRAO BHIMRAO PAWADE | Wadi Bk. | Nanded |
| NARAYAN BHIMRAO PAWADE | Wadi Bk. | Nanded |
| CHAYA PANDITRAO PAWADE | Wadi Bk. | Nanded |
| JAYSHREE NARAYAN PAWADE | Wadi Bk. | Nanded |
| AJAY PANDITRAO PAWADE | Wadi Bk. | Nanded |
| VIJAY PANDITRAO PAWADE | Wadi Bk. | Nanded |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ABHISHEK NERALKAR |
| Partner | Role in project |
|---|---|
| KAMLESH BACHEWAR | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Feb 2021
Documents filed37
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 14-A-1 Grampanchayat Work Completion.pdf | 17 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 14-A-1.pdf | 31 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 31 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 31 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Task Activity.pdf | 31 Jan 2021 |
| Details of Restarting of Construction work post lockdownFile: Task Activity.pdf | 31 Jan 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: form 4 14-A-1.pdf | 31 Jan 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf | 19 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Task Activity.pdf | 19 Jul 2019 |
| Certificates of CA (Form 3)File: CA certificate.pdf | 19 Jul 2019 |
| Certificates of CA (Form 3)File: CA certificate 14-A-1.pdf | 1 Dec 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 14-A-1.pdf | 21 Nov 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: 14-A-1.pdf | 31 Mar 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: 14-A-1.pdf | 31 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's.pdf | 10 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect.pdf | 10 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: task.pdf | 10 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: task.pdf | 10 Mar 2018 |
| Certificates of CA (Form 3)File: 14-A-1 CA certificate.pdf | 10 Mar 2018 |
| Declaration in FORM BFile: Form B.pdf | 24 Jul 2017 |
| Certificates of CA (Form 3)File: CA certificate.pdf | 24 Jul 2017 |
| Building plan approvalFile: permission.pdf | 23 Jul 2017 |
| Layout approvalFile: LAYOUT 01.pdf | 23 Jul 2017 |
| PAN CardFile: Pan card.pdf | 23 Jul 2017 |
| Copy of the legal title reportFile: 1 to 6.pdf | 23 Jul 2017 |
| Copy of the legal title reportFile: 7 to 14.pdf | 23 Jul 2017 |
| Copy of the legal title reportFile: 15 to 21.pdf | 23 Jul 2017 |
| Details of encumbrancesFile: Pandit Pawade.pdf | 23 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT 01.pdf | 23 Jul 2017 |
| Building Plan Approval (IOD)File: permission.pdf | 23 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 14A1.pdf | 23 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Task Activity 14A1.pdf | 23 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginers Certi 14A1.pdf | 23 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Task Activity 14A1.pdf | 23 Jul 2017 |
| Proforma of Allotment letterFile: Agreement Full sale.pdf | 23 Jul 2017 |
| OtherFile: 01.pdf | 23 Jul 2017 |
| OtherFile: 02.pdf | 23 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nanded
Computed across the 100+ Nanded projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 37 filed documents as one ZIP, foldered, with a manifest
Keep LAIJAI NAGARI 14/A/1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wadi Bk.100+ in Nanded
Padmavati Empire
Padmavati Developers
Padmavati Empire Wing B
Padmavati Developers
DEEPJYOTI
JYOTI DEEPAK PUJARI
Om residency
Sangam developers
SHREE RAMA TOWNSHIP
SHREE RAMA CONSTRUCTION
PALDEWAR CITY
PRAVEEN NAGNATH PALDEWAR
See every Nanded project, with the district possession charts
Builder: KAMLESH BACHEWAR
KAMLESH BACHEWAR has 2 registrations on MahaRERA, including LAIJAI NAGARI and LAIJAI NAGARI 14/A/1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nanded district page.
Frequently asked questions
What are my rights if LAIJAI NAGARI 14/A/1 is delayed beyond 30 Dec 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LAIJAI NAGARI 14/A/1?
The registered promoter entity is KAMLESH BACHEWAR, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LAIJAI NAGARI 14/A/1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for LAIJAI NAGARI 14/A/1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LAIJAI NAGARI 14/A/1?
The professionals named in the filing: Architect: ABHISHEK NERALKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LAIJAI NAGARI 14/A/1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback