Home / Browse projects / Thane, Maharashtra / Laaman Industrial Park

Completed No litigation declared Mixed project

Laaman Industrial Park

By Laaman Developers

RG-MH-85004 · RERA P51700032501 · Last updated on MahaRERA portal: 21 May 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 1 months
  • 1 extension taken
  • Rs 40.00 crore secured on the land, in favour of Aditya Birla Finance Ltd.

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

Laaman Industrial Park is a Mixed project by Laaman Developers in Thane, Maharashtra, registered with MahaRERA as P51700032501 on 10 Jan 2022. The registration is recorded completed; possession was promised by 9 Jan 2025. The completion date has moved by 1 months from the original filing.

At a glance

Project

  • NameLaaman Industrial Park
  • TypeMixed
  • Location
    • Thane Industrial Area
    • Thane West
    • Thane (M Corp.)
    • Thane
    • 400604
  • Pincode400604
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700032501
  • ReraGenie IDRG-MH-85004

Builder

  • NameLaaman Developers
  • Entity typePartnership
  • GSTIN27AAHFL5979N1ZD
  • PartnersAnant Laxman Gajmal, Archana Anant Gajmal, Ashwini Nilesh Gajmal, Nilesh Laxman Gajmal

Key dates

this monthRegisteredJan 2022First promiseDec 2024Revised toJan 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Jan 2022
  • Promised completion9 Jan 2025
  • Revised completionRevised to 9 Jan 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed117 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Laaman Industrial ParkNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Laaman Industrial Park: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 21 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
UG Tank and Pump Room Civil WorkYes100%

Parking filed111

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots111
Closed/Covered111

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,419 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Ltd.
Secured amountRs 40.00 crore
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authorityMaharashtra Industrial Development Corporation
Permissible FSI17896.95
Proposed, not sanctioned15,659 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchModellagram Branch, Opp Wagle Industrial Estate Thane West

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantN B Sayed & Associates
Chartered AccountantSTP & Associates
PartnerRole in project
Laaman Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700027900Dec 2024 → Jan 2025

Reason as filed by the promoterWe, M/s. Laaman Developers, hereby declare the following with respect to the project Laaman Industrial Park bearing registration number. P51700032501 registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, we received the Occupation Certificate (OC) on 09 January 2025 and we have initiated the process for the possession as well, hence we won't be required to upload consents. To provide assurance and facilitate a smooth completion process, we are closely monitoring the remaining activities, ensu

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 May 2025

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for21 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Laaman Industrial Park as on 09-01-2025 (2)-compressed.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 (3).pdf8 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: P51700032501_FileName_1.pdf27 Mar 2025
Declaration in FORM BFile: Form B (Affidvit cum Delaration.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Architect Certificate).pdf18 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf18 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 21-22.pdf18 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf18 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 22-23.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf15 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Architects Completion Certificate FORM 4 (1).pdf20 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate C-9.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT'S CERTIFICARE SEP 24.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT'S CERTIFICARE SEP 24.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Laaman Industrial Park as on 30-09-2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Laaman Industrial Park Sept 2024.pdf20 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Approved Plan CC Letter 030124 5th to 9th Flr_11zon.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Laaman Industrial Park FY 2023-24.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Laaman Industrial Park Signed.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024_11zon (5).pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 March 2024.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - June 2024 Laaman Developers.pdf7 Oct 2024
Declaration about Commencement CertificateFile: FORMAT D (1).pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Laaman Industrial Park as on 30-06-2024.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Laaman Industrial Park June 2024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Laaman Industrial Park as on June 2024.pdf19 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Declaration of Allottee Grievance Redressal Cell Jun 2024.pdf28 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Laaman Industrial Park March 24.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Laaman Industrial Park 31-03-2024.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECTS CERTIFICATE - SIG.pdf15 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Laaman - 2A 2022-23.pdf15 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Laaman - 2A 2023-24.pdf15 May 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Laaman Industrial Park Dec 2023.pdf20 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Laaman Industrial Park Dec 23.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Laaman Industrial Park as on Dec 2023.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Laaman Industrial Park as on Dec 2023.pdf19 Jan 2024
Layout approvalFile: Approved Plan Drawings 030124 5th to 9th Flr_11zon-1-8-5-6_compressed.pdf18 Jan 2024
Layout approvalFile: Approved Plan Drawings 030124 5th to 9th Flr_11zon-1-8-7-8_compressed.pdf18 Jan 2024
Building plan approvalFile: Approved Plan CC Letter 030124 5th to 9th Flr_compressed.pdf18 Jan 2024
Layout approvalFile: Approved Plan Drawings 030124 5th to 9th Flr_11zon-1-8-1-2_compressed.pdf18 Jan 2024
Layout approvalFile: Approved Plan Drawings 030124 5th to 9th Flr_11zon-1-8-3-4_compressed.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: Approved Plan Drawings 030124 5th to 9th Flr_11zon-1-8-1-2_compressed.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: Approved Plan Drawings 030124 5th to 9th Flr_11zon-1-8-3-4_compressed.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: Approved Plan Drawings 030124 5th to 9th Flr_11zon-1-8-5-6_compressed.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: Approved Plan Drawings 030124 5th to 9th Flr_11zon-1-8-7-8_compressed.pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan CC Letter 030124 5th to 9th Flr_compressed.pdf18 Jan 2024
Other - TechnicalFile: Fire NOC 28122023 5th to 9th Flr.pdf18 Jan 2024
Details of encumbrancesFile: Laaman Industrial Park- Encumbrance Letter (Finance).pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Laaman Industrial Park as on Sep 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (Client Copy).pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Laaman Industrial Park as on September 2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Laaman Industrial Park 30-09-2023.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Laaman Industrial Park FY 22-23.pdf25 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Laaman Industrial Park as on March 2023.pdf7 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Laaman Industrial Park as on June 2023.pdf7 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Laaman Industrial Park as on March 2023.pdf7 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Laaman Industrial Park as on June 2023.pdf7 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 14-04-2023.pdf5 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 30-06-2023.pdf5 Aug 2023
Layout approvalFile: Sanction Plan 1.pdf17 May 2023
Building plan approvalFile: Sanction Plan 1.pdf17 May 2023
Building plan approvalFile: Sanction Plan 2.pdf17 May 2023
Building plan approvalFile: Sanction Plan 3.pdf17 May 2023
Building plan approvalFile: Sanction Plan 4.pdf17 May 2023
Copy of Layout Approval (in case of layout)File: Sanction Plan 1.pdf17 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 1.pdf17 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 2.pdf17 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 3.pdf17 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 4.pdf17 May 2023
Building plan approvalFile: Additional FSI Plan Approval C-9-1.pdf4 May 2023
Building plan approvalFile: Additional FSI Plan Approval C-9-2.pdf4 May 2023
Building plan approvalFile: Additional FSI Plan Approval C-9-3.pdf4 May 2023
Building plan approvalFile: Additional FSI Plan Approval C-9-4.pdf4 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Additional FSI Plan Approval C-9-1.pdf4 May 2023

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 1 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Laaman Industrial Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane West7,600+ in Thane

2 kmLaaman Industrial ParkCompleted 96Lapsed / revoked 63Other 135Dot size: filed unitsN

Filed coordinates, straight-line distance. 294 registered projects within 2 km.

Builder: Laaman Developers

Laaman Developers has 1 registration on MahaRERA, including Laaman Industrial Park. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Laaman Industrial Park is delayed beyond 9 Jan 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Laaman Industrial Park?

The registered promoter entity is Laaman Developers, a partnership as per the filing. Its GSTIN 27AAHFL5979N1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Laaman Industrial Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Laaman Industrial Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Laaman Industrial Park?

The professionals named in the filing: Chartered Accountant: N B Sayed & Associates; Chartered Accountant: STP & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Laaman Industrial Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Laaman Industrial Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Laaman Industrial Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.