Registration approved Residential/Group Housing project

L'OPULENCE

By VAISHNODEVI LUSH GREENS PRIVATE LIMITED

RG-KA-81112 · RERA PRM/KA/RERA/1251/310/PR/180728/001954

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2021Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 63 documents Report an error

L'OPULENCE is a Residential/Group Housing project by VAISHNODEVI LUSH GREENS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/180728/001954 on 28 Jul 2018. Possession is promised by 7 Mar 2021. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameL'OPULENCE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/180728/001954
  • ReraGenie IDRG-KA-81112

Builder

  • NameVAISHNODEVI LUSH GREENS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45205KA2013PTC067889
  • Authorized SignatoryVIMAL JAIN
  • Other registrations3 more →

Key dates

this monthRegisteredJul 2018First promiseMar 2020Revised toMar 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on28 Jul 2018
  • Promised completion7 Mar 2021
  • Revised completionRevised to 7 Mar 2021 (originally 7 Mar 2020)
  • Buildings1 building record
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LOPULANCE---20020

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,373 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 12.32 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMar 2020 → Dec 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/200526/001954Dec 2021 → Mar 2021

Reason as filed by the promoterShortage of Labour

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed63

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/180728/001954 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Registration certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Arc certificate - work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engg certificate - work completed.pdf-
CA Certificate for Funds UtilizationFile: CA FUND UTILIZATION CERTIFICATE.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arc certificate - work pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg certificate- pending workpdf.pdf-
CA Certificate for Funds required for Project CompletionFile: CA FUNDS REQUIRED CERTIFICATE.pdf-
AffidavitFile: Affidavit Signed.pdf-
Latest Encumbrance CertificateFile: EC 12-5-2019 to 20-10-2019 (1).PDF-
Consent letter from 2/3rd of AllotteesFile: conscent letter.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails (1).xlsx-
Document 1File: FORM B.pdf-
Document 2File: aff for payment of compensation.pdf-
Document 3File: bank acc letter.pdf-
Document 4File: conscent letter.pdf-
Document 5File: CA FUND UTILIZATION CERTIFICATE.pdf-
Document 6File: CA FUNDS REQUIRED CERTIFICATE.pdf-
Document 7File: MERGED BANK STATEMENT.pdf-
Document 8File: bank account change request.jpg-
Document 9File: Bank accoount stt.pdf-
Document 10File: Scan.pdf-
Document 11File: Scan1.pdf-
Registration certificate-
Sanction Plan-
Layout plan -Sanctioned-
Draft_Agreement_for_Sale_Real_Estate_Act_2016-
Draft_Agreement_for_Sale_Real_Estate_Act_2016-
SALE DEED-
Sanction Plan-
Sanction Plan layout-
Draft_Agreement_for_Sale_Real_Estate_Act_2016-
Broucher related-
Cost of Project - PREMIUM APARTMENT AT RR NAGAR-
EC-
Khata Certificate-
Tax Paid Receipt-
NOC Fire Force Department-
NOC Airport Authority-
NOC BESCOM-
NOC KSPCB-
NOC BSNL-
Layout plan -Sanctioned-
Sanction Plan-
Khata Extracts-
Balance Sheet 2016 - 2017File: Balance Sheet 2017.pdf-
Balance Sheet 2015 - 2016File: Balance sheet 2016.pdf-
Balance Sheet 2014 - 2015File: Balance sheet 2015.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Balance Sheet 2017.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Balance sheet 2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Balance sheet 2015.pdf-
Director's Report 2016 - 2017File: Balance Sheet 2017.pdf-
Director's Report 2015 - 2016File: Balance sheet 2016.pdf-
Director's Report 2014 - 2015File: Balance sheet 2015.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow 2017.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow 2016.pdf-
Auditor's Report 2016 - 2017File: Balance Sheet 2017.pdf-
Auditor's Report 2015 - 2016File: Balance sheet 2016.pdf-
Auditor's Report 2014 - 2015File: Balance sheet 2015.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR ack 2017.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR Ack 2016.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR Ack 2015.pdf-
Form B-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_180728_001954.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep L'OPULENCE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmL'OPULENCEOther 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: VAISHNODEVI LUSH GREENS PRIVATE LIMITED

VAISHNODEVI LUSH GREENS PRIVATE LIMITED has 4 registrations on RERA Karnataka, including L'OPULENCE and Nature View. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if L'OPULENCE is delayed beyond 7 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of L'OPULENCE?

The registered promoter entity is VAISHNODEVI LUSH GREENS PRIVATE LIMITED, a company as per the filing. Its CIN U45205KA2013PTC067889 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in L'OPULENCE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in L'OPULENCE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About L'OPULENCE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save L'OPULENCE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.