ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / KVR SAI KRUTHI

Registration approved Residential/Group Housing project

KVR SAI KRUTHI

By KVR HOUSING PVT LTD

RG-KA-02993 · RERA PRM/KA/RERA/1251/310/PR/190704/002644

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Jun 2022Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 30 documents Report an error

KVR SAI KRUTHI is a Residential/Group Housing project by KVR HOUSING PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/190704/002644 on 4 Jul 2019. Possession is promised by 30 Jun 2022. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameKVR SAI KRUTHI
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/190704/002644
  • ReraGenie IDRG-KA-02993

Builder

  • NameKVR HOUSING PVT LTD
  • Entity typeCompany
  • CINU45203KA2013PTC068909
  • Authorized SignatoryKeshav.H.L
  • Board MembersS.Venkatesh, Mr.kushalappa gowda, Srikanth.R, Anand.N

Key dates

this monthRegisteredJul 2019First promiseSep 2021Revised toJun 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on4 Jul 2019
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 30 Sep 2021)
  • Buildings1 building record
  • Documents filed30 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KVR SAI KRUTHI---24024

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemNoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,159 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 6.04 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionSep 2021 → Jun 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed30

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/190704/002644 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: COMPANY REGI CERTIFICATE.pdf-
plan licence c-
Approved Plan-
Approval letter with plan-
Sale Deed-
plan licence c-
Approved Plan-
specification c-
UPTO DATE EC-
Sec 3(1) Affidavit-
KHATA & EXTRACT-
CONVERSION ORDER-
Approval letter with plan-
specification c-
Balance Sheet 2017 - 2018File: bal 18-19.pdf-
Balance Sheet 2016 - 2017File: bal 17-18.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet 16-17.pdf-
Audited Profit and Loss Statement 2017 - 2018File: P&L 18-19.pdf-
Audited Profit and Loss Statement 2016 - 2017File: p & L 17-18.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P & L 16-17.pdf-
Auditor's Report 2017 - 2018File: aud rep -1-28-19.pdf-
Auditor's Report 2016 - 2017File: aud rep 1 17-18.pdf-
Auditor's Report 2015 - 2016File: aud rep1 -16-17.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR 18-19.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: itr 17-18.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 16-17.pdf-
Form B Affidavit-
Prospectus/BrochureFile: KVR Brochure (1).pdf-
Advertisement Copy 1File: 1564845039306_A4 Size Pamphlet 2 (1).pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_190704_002644.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep KVR SAI KRUTHI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: KVR HOUSING PVT LTD

KVR HOUSING PVT LTD has 1 registration on RERA Karnataka, including KVR SAI KRUTHI. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if KVR SAI KRUTHI is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of KVR SAI KRUTHI?

The registered promoter entity is KVR HOUSING PVT LTD, a company as per the filing. Its CIN U45203KA2013PTC068909 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in KVR SAI KRUTHI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in KVR SAI KRUTHI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KVR SAI KRUTHI. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KVR SAI KRUTHI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.