ReraGenieLog inGet a buyer report

Home / Browse projects / Ballari, Karnataka / KSR PEARLS

Registration approved No litigation declared Residential/Group Housing project

KSR PEARLS

By K S R Infra Projects

RG-KA-68620 · RERA PRM/KA/RERA/1248/469/PR/281024/007181 · Last updated on RERA Karnataka portal: 15 Oct 2024

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2028Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 102 documents Report an error

KSR PEARLS is a Residential/Group Housing project by K S R Infra Projects in Ballari, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1248/469/PR/281024/007181 on 28 Oct 2024. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameKSR PEARLS
  • TypeResidential/Group Housing
  • Location
    • Ballari
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1248/469/PR/281024/007181
  • ReraGenie IDRG-KA-68620

Builder

  • NameK S R Infra Projects
  • Entity typePartnership Firm
  • GSTIN29AAYFK5253BIZZ
  • Authorized SignatoryKorrapati Mallikarjuna

Key dates

this monthRegisteredOct 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on28 Oct 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed102 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KSR PEARLS---73073

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 15 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
K Eshwaraiah--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 19.75 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 18.00 cr-
Administrative CostRs 1.00 cr-
On-site expenditure-Consultants FeesRs 75.00 lakh-
Payment of taxesRs 37,646-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRUDHVI R
EngineerBALAJI KN
Chartered AccountantVISHWAKEERTHI P S

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed102

As listed on the registration, under the names the promoter filed them with; the newest 80 of 102 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1248/469/PR/281024/007181 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 6 Engineer CertificateFile: 1 Form 6 Engineer Certificate.pdf15 Oct 2024
Abstract of EstimateFile: 2 Abstract of Estimate.pdf15 Oct 2024
Structural StabilityFile: 3 Structural Stability.pdf15 Oct 2024
Affidavit for GESCOM Noc & FeeFile: 4 Affidavit for GESCOM Noc & Fee.pdf15 Oct 2024
STP DrawingFile: 5 STP Drawing.pdf15 Oct 2024
A5 KSR INFRA latest balance sheetFile: A5 KSR INFRA latest balance sheet.pdf30 Jul 2024
A5 loan letter 2File: A5 loan letter 2.pdf30 Jul 2024
A5 source of fundsFile: A5 source of funds.pdf30 Jul 2024
A7 AFFIDAVIT CUM DECLARATION Non litigationFile: A7 AFFIDAVIT CUM DECLARATION Non litigation.pdf30 Jul 2024
Architect - Adhar cardFile: Architect - Adhar card.pdf30 Jul 2024
Architect Reg CertificateFile: Architect Reg Certificate.pdf30 Jul 2024
B1 K Eshwaraiah and Anusuya Approval letterFile: B1 K Eshwaraiah and Anusuya Approval letter.pdf30 Jul 2024
B2 katha-1_3File: B2 katha-1_3.pdf30 Jul 2024
B3 NON LITIGATIONFile: B3 NON LITIGATION.pdf30 Jul 2024
B4 Form B Affidavit cum DeclarationFile: B4 Form B Affidavit cum Declaration.pdf30 Jul 2024
C1 commencement letterFile: C1 commencement letter.pdf30 Jul 2024
C1 KSR INFRA PROJECTS Building permissionFile: C1 KSR INFRA PROJECTS Building permission.pdf30 Jul 2024
C3 relinquishment deed (2)File: C3 relinquishment deed (2).pdf30 Jul 2024
C6 Architect Reg CertificateFile: C6 Architect Reg Certificate.pdf30 Jul 2024
D1 AMENITIES DETAILS (2)File: D1 AMENITIES DETAILS (2).pdf30 Jul 2024
D3 Form-3 EngineerFile: D3 Form-3, Engineer.pdf30 Jul 2024
D6 keb electricity noc letterFile: D6 keb electricity noc letter.pdf30 Jul 2024
D8 land cast calculationFile: D8 land cast calculation.pdf30 Jul 2024
D9 water NOC acknowledge (2)File: D9 water NOC acknowledge (2).pdf30 Jul 2024
K Eshwaraiah and Anusuya Approval letterFile: K Eshwaraiah and Anusuya Approval letter .pdf30 Jul 2024
RTC, survey 639/A1A2a1/b2-
Mutation, survey 639/A1A2a1/b2-
Encumbrance Certificate, survey 639/A1A2a1/b2-
Conversion/Alienation Order, survey 639/A1A2a1/b2-
Sale/Title/Gift Deed, survey 639/A1A2a1/b2-
JDA, survey 639/A1A2a1/b2-
Khatha, survey 639/A1A2a1/b2-
Registration CertificateFile: KSR INFRA PROJECTS firm Registration certificate .pdf-
Partnership DeedFile: KSR INFRA PROJECTS Partnership deed .pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 RERA.pdf-
Certificate issued by Architect Form 2File: Form-2, .pdf-
Certificate issued by Engineer Form 3File: 1 Form 6 Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: AFFIDAVIT CUM DECLARATION Non litigation.pdf-
Certificate from Chartered AccountFile: Form 1 RERA.pdf-
Balance Sheet 2022 - 2023File: KSR INFRA latest balance sheet.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ksr infra ITR 2023.pdf-
KSR INFRA PROJECTS CC Building permission-
water noc appartment -
plan-
plan-
DWG 1LayoutLayout2BLYLBPAS118662021BP (1)-
DWG 1LayoutLayout2BLYLBPAS118662021BP (1)-
plan-
KAR INFRA specifications -
DWG 1LayoutLayout2BLYLBPAS118662021BP (1)-
Single layout plan (2)-
Legal opinion-
KSR INFRA PROJECTS JD document -
Conversion Order-
Conversion Order-
old sale deed clear copy-18-24 (2)-
AGREEMENT FOR SALE-
ALLOTMENT LETTER-
broucher-
Form B Affidavit cum Declaration-
non violence -
AFFIDAVIT CUM DECLARATION -
keb electricity noc letter -
water noc appartment -
Karnataka state pollution control board NOC-
Akarband -
Board Resolution-
CDP-
Guidline valuation (3)-
Survey documents and podi-
KSR infra building old permission -
Local Planning Area Map of Ballari Urban Development Authority-
Plan letter-

How this compares with Ballari

2%of Ballari projects moved their completion datethis one has not
0%of Ballari registrations are shown as withdrawn or revokedthis one is not

Computed across the 190+ Ballari projects on ReraGenie, from their own filings.

Keep KSR PEARLS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Ballari190+ in Ballari

Builder: K S R Infra Projects

K S R Infra Projects has 1 registration on RERA Karnataka, including KSR PEARLS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Ballari district page.

Frequently asked questions

What are my rights if KSR PEARLS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of KSR PEARLS?

The registered promoter entity is K S R Infra Projects, a partnership firm as per the filing. Its GSTIN 29AAYFK5253BIZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in KSR PEARLS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at KSR PEARLS?

The professionals named in the filing: Architect: PRUDHVI R; Engineer: BALAJI KN; Chartered Accountant: VISHWAKEERTHI P S. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KSR PEARLS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KSR PEARLS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KSR PEARLS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.