Axis Park West
By AXIS INC
RG-KA-99313 · RERA PRM/KA/RERA/1248/440/PR/290323/005825 · Last updated on RERA Karnataka portal: 18 Feb 2023
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Axis Park West is a Residential/Group Housing project by AXIS INC in Ballari, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1248/440/PR/290323/005825 on 29 Mar 2023. Possession is promised by 31 Jul 2025.
At a glance
Project
- NameAxis Park West
- TypeResidential/Group Housing
- Location
- Hospet
- Ballari
- PincodeNot stated
- RERA no.PRM/KA/RERA/1248/440/PR/290323/005825
- ReraGenie IDRG-KA-99313
Builder
- NameAXIS INC
- Entity typePartnership Firm
- GSTIN29ABSFA9876F1ZK
- Authorized SignatoryM. PRAMOD KUMAR
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on29 Mar 2023
- Promised completion31 Jul 2025
- Revised completionNone
- Buildings1 building record
- Documents filed108 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Axis Park West | - | - | - | 104 | 0 | 104 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 18 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 18 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | - |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/S AXIS INC | - | - |
| M/S AXIS INC | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 44.33 cr | - |
| Payment of taxes | Rs 1.27 cr | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 78.46 lakh | - |
| On-site expenditure-Site Overhead | Rs 67.25 lakh | - |
| Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for construction | Rs 60.00 lakh | - |
| On-site expenditure-Salaries of workers | Rs 50.62 lakh | - |
| On-site expenditure-Consultants Fees | Rs 12.66 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANGAMESH CHANAMALLAPPA HAVARAGI |
| Engineer | W LALITHA PRASAD |
| Chartered Accountant | VISHAL JAYESHKUMAR JALALPORWALA |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed108
As listed on the registration, under the names the promoter filed them with; the newest 80 of 108 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1248/440/PR/290323/005825 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| KSPCB CFEFile: KSPCB CFE.pdf | 18 Feb 2023 |
| SINGLE PLOT LAYOUT ORDERFile: SINGLE PLOT LAYOUT.pdf | 18 Feb 2023 |
| Estimated cost of construction for civil works to be certified by the EngineerFile: CERTIFIED COPY OF ESTIMATES.pdf | 18 Feb 2023 |
| project ongoing status with the expenditure detailsFile: AXIS INC - SREE GEETHA CONSTRUCTION SJC_INVOICE_01.pdf | 18 Feb 2023 |
| signed copy of the project specification.File: PROJECT SPECIFICATION.pdf | 18 Feb 2023 |
| upload the proforma of Allotment letterFile: ALLOTMENT LETTER.PDF | 18 Feb 2023 |
| Upload bank account statement or cheque leafFile: BANK STATEMENT_HDFC BANK.pdf | 20 Jan 2023 |
| Upload profit and loss account and balance sheet for 2021-22 and 2020-21 with CA UDIN and ITRFile: FINANCIALS_2021.pdf | 20 Jan 2023 |
| Upload profit and loss account and balance sheet for 2021-22 and 2020-21 with CA UDIN and ITRFile: FINANCIALS_2022.pdf | 20 Jan 2023 |
| need MR for both synoFile: MR OR FORM 3.pdf | 20 Jan 2023 |
| need to mention syno in project address column in project detail pageFile: PROJECT ADDRES.pdf | 20 Jan 2023 |
| Upload all Clear and legible sanctioned drawings Floor plans, sectional drawings and elevations.File: APPROVED BUILDING DRAWINGS.pdf | 20 Jan 2023 |
| Upload all Clear and legible sanctioned drawings Floor plans, sectional drawings and elevations.File: ELEVATION.pdf | 20 Jan 2023 |
| Upload all Clear and legible sanctioned drawings Floor plans, sectional drawings and elevations.File: FLOOR PLANS.pdf | 20 Jan 2023 |
| Upload all Clear and legible sanctioned drawings Floor plans, sectional drawings and elevations.File: PARKING PLAN.pdf | 20 Jan 2023 |
| Upload all Clear and legible sanctioned drawings Floor plans, sectional drawings and elevations.File: PLAN + SECTION.pdf | 20 Jan 2023 |
| parking area is allotted to the individual flatsFile: PARKING ALLOTMENT.pdf | 20 Jan 2023 |
| KSPCB CFEFile: KSPCB CFE.pdf | 20 Jan 2023 |
| Single plot layout Order.File: SINGLE LAYOUT MAP.pdf | 20 Jan 2023 |
| certified Carpet area calculationFile: CERTIFIED CARPET AREA CALCULATION.pdf | 20 Jan 2023 |
| CDP map showing the proposed site.File: CDP 465.jpeg | 20 Jan 2023 |
| village map showing the proposed siteFile: village map.pdf | 20 Jan 2023 |
| latitude and longitude detailFile: PROJECT LOCATION.pdf | 20 Jan 2023 |
| brief estimated cost of construction civil works(Summary of civil works) certified by the Engineer.File: FORM 3 ENGINEER CERTIFICATE.pdf | 20 Jan 2023 |
| project schedule dates till the proposed completion date as mention on the project detail pFile: Project Schedule Details.pdf | 20 Jan 2023 |
| project name and project address and upload the signed copy of the project specification.File: PROJECT SPECIFICATIONS.pdf | 20 Jan 2023 |
| upload the STP demarcation plan along with the KSPCB NOC (NOC PENDING)File: STP LOCATION AND DETAIL CAD PDF.pdf | 20 Jan 2023 |
| upload the STP demarcation plan along with the KSPCB NOC (NOC PENDING)File: STP LOCATION AND DETAIL SIGNED (CAD PDF SCANNED COPY).pdf | 20 Jan 2023 |
| Proforma of Allotment letterFile: DRAFT ALLOTMENT LETTER.pdf | 20 Jan 2023 |
| Allotment LetterFile: Allotment Letter (Booking Form).pdf | 16 Dec 2022 |
| APPROVED BUILDING DRAWINGSFile: APPROVED BUILDING DRAWINGS.pdf | 16 Dec 2022 |
| BUILDING LICENSEFile: BUILDING LICENSE.pdf | 16 Dec 2022 |
| CMC FEE RECEIPTFile: CMC FEE RECEIPT.pdf | 16 Dec 2022 |
| Guidance value of the property by the Sub RegistrarFile: Guidance value of the property by the Sub Registrar.pdf | 16 Dec 2022 |
| LEGAL OPINION FROM ADVOCATEFile: LEGAL OPINION FROM ADVOCATE.pdf | 16 Dec 2022 |
| MAR FORM 26File: MAR FORM 26.pdf | 16 Dec 2022 |
| MR OR FORM 3File: MR OR FORM 3.pdf | 16 Dec 2022 |
| NA COPYFile: N A CONVERSATION ORDER COPY.pdf | 16 Dec 2022 |
| SALE DEED FROM RAJU BHURAT TO PRAVEEN KUMAR TALEDAFile: SALE DEED FROM RAJU BHURAT TO PRAVEEN KUMAR TALEDA.pdf | 16 Dec 2022 |
| SINGLE LAYOUT MAPFile: SINGLE LAYOUT MAP.pdf | 16 Dec 2022 |
| RTC, survey 465C1A | - |
| Mutation, survey 465C1A | - |
| Encumbrance Certificate, survey 465C1A | - |
| Conversion/Alienation Order, survey 465C1A | - |
| Sale/Title/Gift Deed, survey 465C1A | - |
| Khatha, survey 465C1A | - |
| RTC, survey 465B1B2 | - |
| Mutation, survey 465B1B2 | - |
| Encumbrance Certificate, survey 465B1B2 | - |
| Conversion/Alienation Order, survey 465B1B2 | - |
| Sale/Title/Gift Deed, survey 465B1B2 | - |
| Khatha, survey 465B1B2 | - |
| Registration CertificateFile: REGISTRATION OF FIRM.PDF | - |
| Partnership DeedFile: PARTNERSHIP DEED.PDF | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: FORM 1 AXIS INC_compressed.pdf | - |
| Certificate issued by Architect Form 2File: Form 2.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Engineer.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Axis Inc Rera Bangalore.pdf | - |
| Certificate from Chartered AccountFile: FORM 1 AXIS INC_compressed.pdf | - |
| Balance Sheet 2021 - 2022File: NA - Balance Sheet.pdf | - |
| Balance Sheet 2020 - 2021File: NA - Balance Sheet.pdf | - |
| Balance Sheet 2019 - 2020File: NA - Balance Sheet.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: NA- PNL.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: NA- PNL.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: NA- PNL.pdf | - |
| Director's Report 2021 - 2022File: NA - Director Report.pdf | - |
| Director's Report 2020 - 2021File: NA - Director Report.pdf | - |
| Director's Report 2019 - 2020File: NA - Director Report.pdf | - |
| Cash Flow Statement 2021 - 2022File: NA - Cash Flow Statement.pdf | - |
| Cash Flow Statement 2020 - 2021File: NA - Cash Flow Statement.pdf | - |
| Auditor's Report 2021 - 2022File: NA - Auditor's Report.pdf | - |
| Auditor's Report 2020 - 2021File: NA - Auditor's Report.pdf | - |
| Auditor's Report 2019 - 2020File: NA - Auditor's Report.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: NA - Income Tax Return Acknowledgement.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ballari
Computed across the 190+ Ballari projects on ReraGenie, from their own filings.
Keep Axis Park West on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ballari190+ in Ballari
SERENE TOWERS
G LAKSHMI REKHA
Unik Heights
Unik Builders
KSR PEARLS
K S R Infra Projects
SRI MANI HOMES
M/s SPR INFRA
Pride Homes
Mega Meadows
Sambasiva Apartments
RAAVIS ENCLAVES
See every Ballari project, with the district possession charts
Builder: AXIS INC
AXIS INC has 1 registration on RERA Karnataka, including Axis Park West. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Ballari district page.
Frequently asked questions
What are my rights if Axis Park West is delayed beyond 31 Jul 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Axis Park West?
The registered promoter entity is AXIS INC, a partnership firm as per the filing. Its GSTIN 29ABSFA9876F1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Axis Park West?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Axis Park West?
The professionals named in the filing: Architect: SANGAMESH CHANAMALLAPPA HAVARAGI; Engineer: W LALITHA PRASAD; Chartered Accountant: VISHAL JAYESHKUMAR JALALPORWALA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Axis Park West?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.