ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / KSR Basil

Registration transferred Residential/Group Housing project

KSR Basil

By KSR PROPERTIES PVT LTD

RG-KA-56199 · RERA PRM/KA/RERA/1251/446/PR/180519/001744

Source: official RERA Karnataka filing

Red flags

  • Registration transferred
  • 42 complaints at RERA Karnataka
  • Completion date moved by 55 months
  • 3 extensions taken

Clear

  • Separate project account declared
Jul 2024Possession promisedmoved 55 months from the original
42Complaints at RERA Karnatakaon this registration
Jump to the 64 documents Report an error

KSR Basil is a Residential/Group Housing project by KSR PROPERTIES PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/180519/001744 on 19 May 2018. Possession is promised by 26 Jul 2024. The completion date has moved by 55 months from the original filing. 42 complaints are on record with the regulator.

At a glance

Project

  • NameKSR Basil
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/180519/001744
  • ReraGenie IDRG-KA-56199

Builder

  • NameKSR PROPERTIES PVT LTD
  • Entity typeCompany
  • Authorized SignatoryKANTE BALAKRISHNA
  • DirectorsKUNDRU RAMANA REDDY, KAKA HARI BABU

Key dates

this monthRegisteredMay 2018First promiseDec 2019Revised toJul 2024

Key facts

Registration and timeline

  • StatusRegistration transferred
  • Registered on19 May 2018
  • Promised completion26 Jul 2024
  • Revised completionRevised to 26 Jul 2024 (originally 31 Dec 2019)
  • Buildings2 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK 1---1800180
Block B---1660166

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area22,965 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 66.34 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAni sambyal singh
EngineerTAMEER CONSULTING ASSOCIATES

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2019 → Sep 2021

No reason recorded in the filing

ExtensionSep 2021 → Dec 2020

Reason as filed by the promoterothers; Awaiting Approvals; Financial crunch

ExtensionDec 2020 → Jul 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka42

Case no.ComplainantRespondentFiled
CMP/201005/0006762-KSR PROPERTIES PVT LTD05/10/2020
CMP/201010/0006813-KSR PROPERTIES PVT LTD10/10/2020
CMP/201010/0006809-KSR PROPERTIES PVT LTD10/10/2020
CMP/201011/0006811-KSR PROPERTIES PVT LTD11/10/2020
CMP/201012/0006824-KSR PROPERTIES PVT LTD12/10/2020
CMP/201012/0006825-KSR PROPERTIES PVT LTD12/10/2020
CMP/201012/0006826-KSR PROPERTIES PVT LTD12/10/2020
CMP/201014/0006836-KSR PROPERTIES PVT LTD14/10/2020
CMP/201014/0006843-KSR PROPERTIES PVT LTD14/10/2020
CMP/201209/0007224-KSR PROPERTIES PVT LTD09/12/2020
CMP/201209/0007215-KSR PROPERTIES PVT LTD09/12/2020
CMP/201210/0007236-KSR PROPERTIES PVT LTD10/12/2020
CMP/201219/0007254-KSR PROPERTIES PVT LTD19/12/2020
CMP/201219/0007230-KSR PROPERTIES PVT LTD19/12/2020
CMP/201219/0007287-KSR PROPERTIES PVT LTD19/12/2020
CMP/201231/0007351-KSR PROPERTIES PVT LTD31/12/2020
CMP/210102/0007377-KSR PROPERTIES PVT LTD02/01/2021
CMP/210128/0007520-KSR PROPERTIES PVT LTD28/01/2021
CMP/210705/0008097-KSR PROPERTIES PVT LTD05/07/2021
CMP/220909/0009996-KSR PROPERTIES PVT LTD09/09/2022
00078/2023-KSR PROPERTIES PVT LTD17/01/2023
01766/2023-KSR PROPERTIES PVT LTD28/11/2023
01128/2024-KSR PROPERTIES PVT LTD12/11/2024
01132/2024-KSR PROPERTIES PVT LTD12/11/2024
01133/2024-KSR PROPERTIES PVT LTD12/11/2024
01134/2024-KSR PROPERTIES PVT LTD12/11/2024
01135/2024-KSR PROPERTIES PVT LTD12/11/2024
01136/2024-KSR PROPERTIES PVT LTD12/11/2024
01137/2024-KSR PROPERTIES PVT LTD12/11/2024
01146/2024-KSR PROPERTIES PVT LTD13/11/2024
01147/2024-KSR PROPERTIES PVT LTD13/11/2024
01150/2024-KSR PROPERTIES PVT LTD13/11/2024
01162/2024-KSR PROPERTIES PVT LTD13/11/2024
01163/2024-KSR PROPERTIES PVT LTD13/11/2024
01170/2024-KSR PROPERTIES PVT LTD15/11/2024
01171/2024-KSR PROPERTIES PVT LTD15/11/2024
01175/2024-KSR PROPERTIES PVT LTD15/11/2024
01176/2024-KSR PROPERTIES PVT LTD16/11/2024
01183/2024-KSR PROPERTIES PVT LTD16/11/2024
01223/2024-KSR PROPERTIES PVT LTD20/11/2024
01224/2024-KSR PROPERTIES PVT LTD20/11/2024
00414/2025-KSR PROPERTIES PVT LTD10/03/2025

Documents filed64

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/180519/001744 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: 20170824105505222.pdf-
Project Details-
Architect Certificate for Work Completion Schedule till DateFile: ARCHITECT'S CERTIFICATE FOR STATUS OF WORK.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: ENGINEER'S CERIFICATE FOR STATUS OF WORK.pdf-
CA Certificate for Funds UtilizationFile: CA Certificate for Funds Utilisation.pdf-
Architect Certificate for Pending Work Completion Schedule.File: ARCHITECT CERTIFICATE FOR PENDING WORKS.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: ENGINEER'S CERTIFICATE FOR PENDING WORKS.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate for Funds Required.pdf-
Latest Encumbrance CertificateFile: Basil EC.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: KSR - Bank Statement.pdf-
Document 2File: COMMENCEMENT CERTIFICATE.pdf-
Document 3File: Affidavit for consent letters.pdf-
Document 4File: CA Certificate for Funds Utilisation.pdf-
Document 5File: CA Certificate for Funds Required.pdf-
Document 6File: KSR Basil - Affidavit Extension.pdf-
Document 7File: KSR - Bank Statement.pdf-
COMMENCEMENT CERTIFICATE-
Typical Floor Plan-compressed-
Site Plan-ilovepdf-compressed-
Proforma for Sale Deed-
KSR Basil Proforma of Agreement for Sale-
JD Agreement -
Typical Floor Plan-compressed-
Typical Floor Plan-compressed-
Proforma For Allotment Letter-
Brochure of current project-
KSR Basil - Tax Receipt - Latest-
Project Specification-
Latest EC Copy of KSR Basil-
Khatha-
JD Agreement -
KSR Basil - License Construction Approval Copy - Latest-
COVERSIOON CERTIFICATE-
20170913180510348-
20170913180510348-
Relinquishment-Deed-ilovepdf-compressed-1-3-
NOC BESCOM comp-
NOC - Water-
Karnataka State Pollution Control Board-
NOC SEAC Letter-
BMRDA APPROVAL-
SECTION PLANS 1-
Balance Sheet 2015 - 2016File: Balance Sheet 2015-16.pdf-
Balance Sheet 2014 - 2015File: Balance sheet 2014-15.pdf-
Balance Sheet 2013 - 2014File: Balance sheet 2013-14.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P & L 2015-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: P & L 2014-15.pdf-
Audited Profit and Loss Statement 2013 - 2014File: P & L 2013-14.pdf-
Director's Report 2015 - 2016File: Directors Report -2015-16.pdf-
Director's Report 2014 - 2015File: Directors Report 2014-15.pdf-
Director's Report 2013 - 2014File: Directors Report -2013-14.pdf-
Cash Flow Statement 2015 - 2016File: 20170913180510348.pdf-
Cash Flow Statement 2014 - 2015File: 20170913180510348.pdf-
Auditor's Report 2015 - 2016File: Auditors Report 2015-16 (2).pdf-
Auditor's Report 2014 - 2015File: AUDIT REPORT -2014-15.pdf-
Auditor's Report 2013 - 2014File: Auditors Report 2013-14.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Ack 2015-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: Ack 2014-15.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: Ack 2013-14.pdf-
Declaration (Form B)-
Prospectus/BrochureFile: BASIL BROCHURE WITH SBI LOGO.pdf-
Advertisement Copy 1File: KSR Basil - KSR Basil - 1, 2 & 3 BHK Residential Apartments Near Budigere Cross, Off White-
Tower Excel SheetFile: 1PRM_KA_RERA_1251_446_PR_180519_001744.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 55 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep KSR Basil on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: KSR PROPERTIES PVT LTD

KSR PROPERTIES PVT LTD has 1 registration on RERA Karnataka, including KSR Basil. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if KSR Basil is delayed beyond 26 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of KSR Basil?

The registered promoter entity is KSR PROPERTIES PVT LTD, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in KSR Basil?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KSR Basil?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at KSR Basil?

The professionals named in the filing: Architect: Ani sambyal singh; Engineer: TAMEER CONSULTING ASSOCIATES. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KSR Basil?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KSR Basil. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KSR Basil to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.