Registration approved Residential/Group Housing project

Kritan Ira

By Kritan Urbane Living

RG-KA-83044 · RERA PRM/KA/RERA/1251/310/PR/171021/001046

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Dec 2020Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 59 documents Report an error

Kritan Ira is a Residential/Group Housing project by Kritan Urbane Living in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171021/001046 on 21 Oct 2017. Possession is promised by 31 Dec 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameKritan Ira
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/171021/001046
  • ReraGenie IDRG-KA-83044

Builder

  • NameKritan Urbane Living
  • Entity typePartnership Firm
  • Authorized SignatoryHarish H M
  • Other registrations1 more →
  • No longer live1 withdrawn or revoked

Key dates

this monthRegisteredOct 2017First promiseDec 2019Revised toDec 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on21 Oct 2017
  • Promised completion31 Dec 2020
  • Revised completionRevised to 31 Dec 2020 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kritan Ira---75075

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
PaintingNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemNoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,529 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 13.00 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2019 → Sep 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/200226/001046Sep 2021 → Dec 2020

Reason as filed by the promoterFinancial crunch

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed59

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171021/001046 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Parnership-Deed-Jan-17-2.pdf-
Architect Certificate for Work Completion Schedule till DateFile: ARCHI CFT - work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: ENG CFT - WORK COMPLETED.pdf-
CA Certificate for Funds UtilizationFile: Chartered Accountants fund utilization certificate.pdf-
Architect Certificate for Pending Work Completion Schedule.File: ARCH CFT - PENDING WORK.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: ENG CFT - WORK PENDING.pdf-
CA Certificate for Funds required for Project CompletionFile: Charted Accountants Certificate for Funds Required.pdf-
AffidavitFile: RERA AFFIDAVI.pdf-
Latest Encumbrance CertificateFile: EC 2017-2019.pdf-
Consent letter from 2/3rd of AllotteesFile: Kritan Ira owners Concent letter.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: FEB 18 TO Jan 20 - KUL.pdf-
Document 2File: Affidavit-Notarized.pdf-
Document 3File: Affidavit.pdf-
Document 4File: CC.pdf-
Document 5File: Affidavit-Notary.pdf-
Document 6File: KUL-HDFC-STATEMENT-2018-2019.pdf-
CC-
APPOVED BUILDING OR PLOTTING PLAN-
APPROVED LAYOUT PLAN-
Performa Sale Deed-
Proforma Agreement Sale-
Saledeed-RTC-
APPROVED SECTPLAN-
Area-Devp-pl-
Porf-Allotment Letter-
Kritan Ira Brochure-
PCB-
Project Specification-
EC-12yrs-
Khata-
JDA-
advocatereport-mutation-
Conversion Order-
PCB-
Unnamed document-
NA-Certificate-
APPROVED SECTPLAN-
Balance Sheet 2015 - 2016File: Provisional Balance sheet 2016-17.pdf-
Balance Sheet 2014 - 2015File: BALANCE SHEET.jpg-
Balance Sheet 2013 - 2014File: Balance sheet.jpg-
Audited Profit and Loss Statement 2015 - 2016File: Provisional PL 2016-17.pdf-
Audited Profit and Loss Statement 2014 - 2015File: PROFIT & LOSS.jpg-
Audited Profit and Loss Statement 2013 - 2014File: Profit and loss.jpg-
Director's Report 2015 - 2016File: Directors Report.pdf-
Director's Report 2014 - 2015File: Directors Report.pdf-
Director's Report 2013 - 2014File: Directors Report.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow statement.pdf-
Cash Flow Statement 2014 - 2015File: Cash Flow statement.pdf-
Auditor's Report 2015 - 2016File: Auditors Report16-17.pdf-
Auditor's Report 2014 - 2015File: Auditorsreport15-16.pdf-
Auditor's Report 2013 - 2014File: Auditors report14-15.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: IT Ack2016-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITRV ACK.jpg-
Income Tax Return Acknowledgement 2013 - 2014File: ITRV ACK.jpg-
FormB-
Prospectus/BrochureFile: Kritan Ira Brochure (1).pdf-
Advertisement Copy 1File: K.Ira C.floor Ad.pdf-
Tower Excel SheetFile: PRM-KA-RERA-1251-310-PR-171021-001046.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Kritan Ira on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Kritan Urbane Living

Kritan Urbane Living has 2 registrations on RERA Karnataka, including Kritan Ira and Kritan Icon. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Kritan Ira is delayed beyond 31 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Kritan Ira?

The registered promoter entity is Kritan Urbane Living, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Kritan Ira?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in Kritan Ira?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kritan Ira. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kritan Ira to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.