- 3 complaints at RERA Karnataka
- Completion date moved by 19 months
- 2 extensions taken
Clear
- Separate project account declared
Saved.
KRISHVI BVL STATURA is a Residential/Group Housing project by BVL Estate Pvt. Ltd., in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/190823/002819 on 23 Aug 2019. Possession is promised by 31 Mar 2026. The completion date has moved by 19 months from the original filing. 3 complaints are on record with the regulator.
At a glance
Project
- NameKRISHVI BVL STATURA
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/308/PR/190823/002819
- ReraGenie IDRG-KA-17690
Builder
- NameBVL Estate Pvt. Ltd.,
- Entity typeCompany
- CINU70109KA2014PTC074769
- Authorized SignatoryMr. Vivek Iyer
- DirectorsMr. Arhanth Dinesh, Mr. Sumanth
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on23 Aug 2019
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 20 Aug 2024)
- Buildings1 building record
- Documents filed129 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Krishvi BVL Statura | - | - | - | 176 | 0 | 176 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | Not applicable |
| Plastering inside , outside & Ceiling | Not applicable |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 15 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | Yes | - |
| Water and Sanitation | No | Not applicable |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | V.B.T. CONSORTIUM |
| Engineer | RENUKA PRASAD H.N PROPRIETOR PRASAD CONSULTANTS |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterAwaiting OC
Complaints filed with RERA Karnataka3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/211013/0008436 | - | BVL Estate Pvt. Ltd., | 13/10/2021 |
| 00468/2025 | - | BVL Estate Pvt. Ltd., | 13/03/2025 |
| 00955/2025 | - | BVL Estate Pvt. Ltd., | 22/07/2025 |
Documents filed129
As listed on the registration, under the names the promoter filed them with; the newest 80 of 129 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/190823/002819 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Water NOCFile: Water NOC.PDF | 15 May 2025 |
| Airport Authority NOC Self AttestedFile: Airport Authority NOC.PDF | 15 May 2025 |
| Bescom NOCFile: Bescom.PDF | 15 May 2025 |
| Bescom InspectionFile: BVL Material Inspection .pdf | 15 May 2025 |
| plan sanction 1-9File: 01_SP.pdf | 7 May 2021 |
| plan sanction 2-9File: 02_SP.pdf | 7 May 2021 |
| plan sanction 3-9File: 03_SP.pdf | 7 May 2021 |
| plan sanction 4-9File: 04_SP.pdf | 7 May 2021 |
| plan sanction 5-9File: 05_SP.pdf | 7 May 2021 |
| plan sanction 6-9File: 06_SP.pdf | 7 May 2021 |
| plan sanction 7-9File: 07_SP.pdf | 7 May 2021 |
| plan sanction 8-9File: 08_SP.pdf | 7 May 2021 |
| plan sanction 9-9File: 09_SP.pdf | 7 May 2021 |
| plan sanction license ( showing old 147 units and new 176 units sanctioned)File: Statura Revised sanction plan Licence.PDF | 7 May 2021 |
| CertificateFile: INCORPORATION CERTIFICATE and GST CERTIFICATE.pdf | - |
| Already registered project ongoing detailsFile: RERA Registration Certificate.pdf | - |
| Modified plan details site plan, floor plans, Plan Licence LetterFile: Statura Revised sanction plan Licence.PDF | - |
| Elevation, Sections, Specifications ( If changes are there )File: 09 - Section-compressed.pdf | - |
| Consent LetterFile: Xerox Scan_19032021150223.pdf | - |
| Chartered Accountant CertificateFile: CA Certificate.pdf | - |
| Notarized AffidavitFile: Xerox Scan_19032021150424.pdf | - |
| Engineer CertificateFile: Engineer Certificate_Modified Plan.PDF | - |
| Architect CertificateFile: 26-02-2021-CERTIFICATE.pdf | - |
| Structural Engineer Certificate for stability of structureFile: Xerox Scan_19032021150238.pdf | - |
| Modification of Plan DetailsFile: SITE PLAN.pdf | - |
| Modification of Plan DetailsFile: 01 plan.pdf | - |
| Modification of Plan DetailsFile: Xerox Scan_22032021160112.PDF | - |
| Modification of Plan DetailsFile: Xerox Scan_22032021160112.PDF | - |
| Modification of Plan DetailsFile: RERA-2.xlsx | - |
| Modification of Plan DetailsFile: RERA-2.xlsx | - |
| sanction plan 1File: 01 plan.zip | - |
| sanction plan 1File: 01 plan.z01 | - |
| sanction plan 1File: 01 plan.z02 | - |
| sanction plan 1File: 01 plan.z03 | - |
| sanction plan 1File: 01 plan.z04 | - |
| sanction plan 2File: 02 plan.part1.rar | - |
| sanction plan 2File: 02 plan.part2.rar | - |
| sanction plan 2File: 02 plan.part3.rar | - |
| sanction plan 2File: 02 plan.part4.rar | - |
| sanction plan 3File: 03 plan.part1.rar | - |
| sanction plan 3File: 02 plan.part2.rar | - |
| sanction plan 3File: 02 plan.part3.rar | - |
| sanction plan 3File: 02 plan.part4.rar | - |
| sanction plan 4File: 04 plan.part1.rar | - |
| sanction plan 4File: 04 plan.part2.rar | - |
| sanction plan 4File: 02 plan.part3.rar | - |
| sanction plan 4File: 02 plan.part4.rar | - |
| sanction plan 5File: 05 plan.part1.rar | - |
| sanction plan 5File: 05 plan.part2.rar | - |
| sanction plan 5File: 05 plan.part3.rar | - |
| sanction plan 6File: 06 plan.part1.rar | - |
| sanction plan 6File: 06 plan.part2.rar | - |
| sanction plan 6File: 06 plan.part3.rar | - |
| sanction plan 7File: 07 plan.part1.rar | - |
| sanction plan 7File: 07 plan.part2.rar | - |
| sanction plan 7File: 07 plan.part3.rar | - |
| sanction plan 8File: 08 Plan.part1.rar | - |
| sanction plan 8File: 08 Plan.part2.rar | - |
| sanction plan 8File: 08 Plan.part3.rar | - |
| sanction plan 8File: 08 Plan.part4.rar | - |
| sanction plan 9File: 09 Plan.part1.rar | - |
| sanction plan 9File: 09 Plan.part2.rar | - |
| sanction plan 9File: 09 Plan.part3.rar | - |
| sanction plan 9File: 09 Plan.part4.rar | - |
| sanction plan 9File: 09 Plan.part5.rar | - |
| Architect Certificate for Work Completion Schedule till DateFile: Form Ex 1_Architect Certificate.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Form Ex 5_Engineers Certificate.pdf | - |
| CA Certificate for Funds UtilizationFile: Form Ex 3_CA Certificate.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Form Ex 2_Architect Certificate for Pending work .pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Form Ex 6-Architect certificate for pending work .pdf | - |
| CA Certificate for Funds required for Project CompletionFile: Form Ex 4_CA Certificate.pdf | - |
| AffidavitFile: Form Ex 7 Affidavit_compressed.pdf | - |
| Latest Encumbrance CertificateFile: EC.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails Krishvi.xlsx | - |
| Document 1File: Application for OC.jpeg | - |
| Plan License Letter | - |
| ALL FLOOR PLANS | - |
| PROFORMA OF SALE DEED | - |
| PROFORMA FOR AGREEMENT OF SALE | - |
| GIFT DEED FAMILY TREE RTC | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep KRISHVI BVL STATURA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: BVL Estate Pvt. Ltd.,
BVL Estate Pvt. Ltd., has 1 registration on RERA Karnataka, including KRISHVI BVL STATURA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if KRISHVI BVL STATURA is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of KRISHVI BVL STATURA?
The registered promoter entity is BVL Estate Pvt. Ltd.,, a company as per the filing. Its CIN U70109KA2014PTC074769 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in KRISHVI BVL STATURA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against KRISHVI BVL STATURA?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at KRISHVI BVL STATURA?
The professionals named in the filing: Architect: V.B.T. CONSORTIUM; Engineer: RENUKA PRASAD H.N PROPRIETOR PRASAD CONSULTANTS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KRISHVI BVL STATURA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback