Home / Browse projects / Bengaluru Urban, Karnataka / KRISHNA RESIDENCY

Registration approved No litigation declared Residential/Group Housing project

KRISHNA RESIDENCY

By SREE VENKATESHWARA BUILDERS

RG-KA-92961 · RERA PRM/KA/RERA/1251/310/PR/030424/006769 · Last updated on RERA Karnataka portal: 28 Mar 2024

Source: official RERA Karnataka filing

Red flags

  • 2 complaints at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Aug 2025Possession promisedno revision filed
2Complaints at RERA Karnatakaon this registration
Jump to the 147 documents Report an error

KRISHNA RESIDENCY is a Residential/Group Housing project by SREE VENKATESHWARA BUILDERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/030424/006769 on 3 Apr 2024. Possession is promised by 31 Aug 2025. 2 complaints are on record with the regulator.

At a glance

Project

  • NameKRISHNA RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/030424/006769
  • ReraGenie IDRG-KA-92961

Builder

  • NameSREE VENKATESHWARA BUILDERS
  • Entity typePartnership Firm
  • Authorized SignatoryKrishna D

Key dates

this monthRegisteredApr 2024PromisedAug 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on3 Apr 2024
  • Promised completion31 Aug 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed147 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KRISHNA---64064

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 28 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 28 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymNoNot applicable
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceNoNot applicable
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
D. KRISHNA--
K. SUMATHI--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 22.00 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 22.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVANI E
EngineerS MANU
Chartered AccountantRAGHUNANDAN L A

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
00077/2026-SREE VENKATESHWARA BUILDERS04/02/2026
00742/2026-SREE VENKATESHWARA BUILDERS24/06/2026

Documents filed147

As listed on the registration, under the names the promoter filed them with; the newest 80 of 147 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/030424/006769 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
AFSFile: AFS.pdf28 Mar 2024
BESCOM NOCFile: BESCOM NOC.pdf28 Mar 2024
BESCOMFile: Bescom.pdf28 Mar 2024
CLARIFICATION FOR FARFile: FAR.pdf25 Mar 2024
SINGLE PLOT LAYOUTFile: single layout order.pdf25 Mar 2024
SINGLE PLOT LAYOUT ORDERFile: single layout order.pdf25 Mar 2024
KSPCB RENEWALFile: KSPCB RENEWAL.pdf25 Mar 2024
VILLAGE MAPFile: Village map talagattapura.jpeg25 Mar 2024
BESCOM NOC AND FEE RECEIPTFile: Bescom.pdf25 Mar 2024
BWSSB NOCFile: BWSSB NOC.pdf25 Mar 2024
FORM 6 ENGINEER CERTIFICATEFile: FORM 6 engineer certificate.pdf25 Mar 2024
WATER SOURCEFile: Water source and BWSSB NOC.pdf25 Mar 2024
CONTRACTOR DETAILSFile: Contractor details.pdf25 Mar 2024
COMMON AREAFile: Carpet Area.pdf25 Mar 2024
PROJECT SPECIFICATIONFile: specfication.pdf25 Mar 2024
BESCOM AFFIDAVITFile: bescom affidavit.pdf25 Mar 2024
AMENITIES AND COMMON AREA DETAILSFile: common area.pdf25 Mar 2024
FORM 2File: Form 2 final.pdf25 Mar 2024
PROFORMA OF SALE AGREEMENTFile: Proforma of sale agreement.pdf25 Mar 2024
KSPCB AFFIDAVITFile: kspbc affidavit.pdf25 Mar 2024
PASS SHEET OF 100%, 70% AND 30%File: bank pass sheet compress.pdf11 Feb 2024
BALANCE SHEET AND PROFIT AND LOSS ACCOUNTFile: PROFIT AND LOSS 20-21 signed.pdf11 Feb 2024
SOURCES OF FUNDFile: sources of funds.pdf11 Feb 2024
NON LITIGATION CERTIFICATEFile: NON LITIGATION CERTIFICATE.pdf11 Feb 2024
CARPET AREA DETAILSFile: carpet area details.pdf11 Feb 2024
COMMON AREA ALLOTTEE AND COMMON AREA ALLOTTED TO ASSOCIATIONFile: common area alottee.pdf11 Feb 2024
CONTRACTORS DETAILSFile: Contractor details (1).pdf11 Feb 2024
AMENITIES AND COMMON AREA DETAILSFile: cm.pdf11 Feb 2024
ENGINEER CERTIFICATEFile: form 3.pdf11 Feb 2024
STPFile: stp1.pdf11 Feb 2024
SOLD AND UNSOLD UNITS AND REASON FOR DELAYFile: sold and unsold and delay.pdf11 Feb 2024
SECTION 3 NOTARIZED AFFIDAVITFile: section3(1).pdf11 Feb 2024
LAND CALCULATION SHEETFile: Land.pdf11 Feb 2024
BRIEF ESTIMATE COST OF CONSTRUCTIONFile: Brief estimated consctruction of construction.pdf11 Feb 2024
GROUND WATER REGARDING BORE WELLFile: declaration of ground water.pdf11 Feb 2024
ALLOTMENT LETTERFile: model form of allotment letter.pdf11 Feb 2024
PROFORMA OF AGREEMENT OF SALEFile: Proforma of agreement of sale.pdf11 Feb 2024
CDP MAPFile: CDP Map.pdf11 Feb 2024
BUILDING LICENCEFile: Building Licence.pdf11 Feb 2024
KSPBCFile: kspbc affidavit.pdf11 Feb 2024
SINGLE PLOT LAYOUT ORDERFile: DECLARATION ON SINLE PLOT LYT ORDER.pdf11 Feb 2024
SINGLE PLOT LAYOUTFile: DECLARATION ON SINLE PLOT LYT.pdf11 Feb 2024
COMMENCEMENT CERTIFICATEFile: COMMENCEMENT CERTIFICATE.pdf11 Feb 2024
WATER NOCFile: declaration for bwssb.pdf11 Feb 2024
BESCOM NOCFile: bescom affidavit.pdf11 Feb 2024
LAYOUT PLANFile: scan887.jpg11 Feb 2024
LAYOUT PLAN 1File: scan888.jpg11 Feb 2024
ARCHITECT CERTIFICATE WITH COA NUMBERFile: form 2.pdf11 Feb 2024
VILLAGE MAPFile: Village map.jpeg11 Feb 2024
PLANFile: Plan.jpg11 Feb 2024
BESCOM AND FEES RECEIPTSFile: BESCOM .pdf11 Feb 2024
AFFIDAVIT CUM DECLARATIONFile: aff cum dec.pdf14 Jan 2024
CONVERSIONFile: conversion krishna residency.pdf14 Jan 2024
ECFile: EC FROM 1950 to tilldate.pdf14 Jan 2024
GOVERNMENT VALUEFile: Govt value of Thalaghattapura.pdf14 Jan 2024
MRFile: M R.pdf14 Jan 2024
NON LITIGATIONFile: non litigation.pdf14 Jan 2024
RTCFile: RTC.pdf14 Jan 2024
SOURCES OF FUNDFile: Sources of fund.pdf14 Jan 2024
RTC, survey 12/5-
Mutation, survey 12/5-
Encumbrance Certificate, survey 12/5-
Conversion/Alienation Order, survey 12/5-
Sale/Title/Gift Deed, survey 12/5-
Khatha, survey 12/5-
Registration CertificateFile: firm registration.pdf-
GST Certificate-
Partnership DeedFile: patnership deed attested Oct 03, 2023.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form-1.pdf-
Certificate issued by Architect Form 2File: form 2.pdf-
Certificate issued by Engineer Form 3File: Enginner certificate form B.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: NON LITIGATION CERTIFICATE.pdf-
Certificate from Chartered AccountFile: Form-1.pdf-
Balance Sheet 2022 - 2023File: FY 2022-23.pdf-
Balance Sheet 2021 - 2022File: FY 2021-22.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep KRISHNA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SREE VENKATESHWARA BUILDERS

SREE VENKATESHWARA BUILDERS has 1 registration on RERA Karnataka, including KRISHNA RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if KRISHNA RESIDENCY is delayed beyond 31 Aug 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of KRISHNA RESIDENCY?

The registered promoter entity is SREE VENKATESHWARA BUILDERS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in KRISHNA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KRISHNA RESIDENCY?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at KRISHNA RESIDENCY?

The professionals named in the filing: Architect: VANI E; Engineer: S MANU; Chartered Accountant: RAGHUNANDAN L A. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRISHNA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRISHNA RESIDENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRISHNA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.