Completed No litigation declared Residential / Group Housing project

KRISHNA RESIDENCES PHASE 1

By Krishna Developers Pvt. Ltd

RG-MH-64248 · RERA P51800005340 · Last updated on MahaRERA portal: 21 Apr 2025

Source: official MahaRERA filing

Red flags

  • 17 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
31 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 50%
17Complaints at MahaRERAon this registration
Jump to the 216 documents Report an error

KRISHNA RESIDENCES PHASE 1 is a Residential / Group Housing project by Krishna Developers Pvt. Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005340 on 11 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2026. 17 complaints are on record with the regulator.

At a glance

Project

  • NameKRISHNA RESIDENCES PHASE 1
  • TypeResidential / Group Housing
  • Location
    • Andheri
    • Mumbai Suburban
    • 400099
  • Pincode400099
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005340
  • ReraGenie IDRG-MH-64248

Builder

  • NameKrishna Developers Pvt. Ltd
  • Entity typeCompany
  • Managing DirectorMeena Vijay Khetan
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings4 building records
  • Documents filed216 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA90000
WING BNA90000
WING CNA100000
WING DNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 21 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

31 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 50%.

WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING D23%
ActivityProgress
Excavation50%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities23

As on 21 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
CHANGING ROOMYes0%
GYMNASIUMYes0%
MULTIPURPOSE ROOMYes0%
SAUNA ROOMYes0%
SERVANT TOILET AT MID LANDINGYes0%
SHOWER ROOMYes0%
STEAM ROOMYes0%
SWIMMING POOLYes0%

Parking filed234

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots234
Closed/Covered213
Open Space21
BuildingClosed/CoveredOpen SpaceTotal
WING A401050
WING B42648
WING C47350
WING D84286

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,456 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11030.0
Proposed, not sanctioned7,843 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA-1 MUKUND NAGAR SOCIETY ANDHERI KURLA ROAD MAROL ANHDERI EAST MUMBAI 400059

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectH M JHAVERI AND SONS
EngineerRaje Structural Consultants Private Limited
PartnerRole in project
Krishna Developers Pvt. Ltd-

Complaints filed with MahaRERA17

Case no.ComplainantRespondentFiled
CC006000000198244KUMUD R ASHER SAMIR R ASHER HEMA S ASHERMR VIJAY S KHETAN PROMOTER OF M/S KRISHNA DEVELOPERS PVT LTD04/09/2021
CC006000000012258JAI KUMAR GAJANAND GUPTAKRISHNA DEVELOPERS PVT. LTD.02/12/2017
CC006000000012262JAIKUMAR GAJANAND GUPTAKRISHNA DEVELOPERS PVT LTD02/12/2017
CC006000000056467JAIKUMAR GUPTA HUFVIJAY S. KHETAN OF M/s.KRISHNA DEVELOPERS PVT LTD06/10/2018
CC006000000056469JAIKUMAR GAJANAND GUPTAMr.VIJAY S.KHETAN OF M/s.KRISHNA DEVELOPERS PVT. LTD.06/10/2018
CC006000000110913JAIKUMAR GAJANAND GUPTAVIJAY S KHETAN PROMOTER OF KRISHNA DEVELOPERS PVT LTD14/09/2019
CC006000000196422JAIKUMAR GUPTA HUF & SATISH KUMAR GUPTAMR VIJAY S KHETAN PROMOTER OF M/S KRISHNA DEVELOPERS PVT LTD20/03/2021
CC006000000198887JAIKUMAR GAJANAND GUPTAVIJAY S. KHETAN OF KRISHNA DEVELOPERS PVT. LTD.30/10/2021
CC006000000056027GURUPRATAP SINGH GANDHIVIJAY S KHETAN01/09/2018
CC006000000089528Mandal ConstructionVijay Khetan (Krishna Developers Pvt. Ltd.)30/05/2019
CC006000000195422Kunal KumbhatKrishna Developers Pvt. Ltd.29/12/2020
CC006000000198457AKSHAY VIJAY MOREMR VIJAY S KHETAN PROMOTER OF M/S KRISHNA DEVELOPERS PVT LTD25/09/2021
CC006000000198463SANYOGITA NEELESH BORKAR & NEELESH V BORKARVIJAY S. KHETAN OF KRISHNA DEVELOPERS PVT. LTD.25/09/2021
CC006000000198465SIDDHESH RAJARAM KADAMVIJAY S. KHETAN OF KRISHNA DEVELOPERS PVT. LTD.25/09/2021
CC006000000198464SUNITA NAVARE & RAMKRISHNA NAVAREVIJAY S. KHETAN OF KRISHNA DEVELOPERS PVT. LTD.25/09/2021
CC006000000198466ANIL GOVIND AWATE & BHARATI ANIL AWATEVIJAY S. KHETAN OF KRISHNA DEVELOPERS PVT. LTD.25/09/2021
CC006000000198786HEMANT DAYANAND DIVATEVIJAY S. KHETAN OF KRISHNA DEVELOPERS PVT. LTD.23/10/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Apr 2024

Documents filed216

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 216 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KR_Architect Certificate Form I_1_Jan_to_31_Mar_2025.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: KR_DISCLOSURE OF SOLD_1_Jan_to_31_Mar_2025.pdf21 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KR_Engginer_Certificate Form 2_1_Oct_to_31_Dec_2024.pdf24 Feb 2025
Certificates of CA (Form 3)File: CA_Form_3_1_Oct_to_31_Dec_2024.pdf20 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KR_Engginer_Certificate Form 2_1_July_to_30_Sept_2024.pdf27 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KR_Architect Certificate Form I_1_Oct_to_31_Dec_2024.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KR_Architect Certificate Form I_1_Oct_to_31_Dec_2024.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F2KR_Engginer_Certificate Form 2_1_April_to_30June_2024_Page_1.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: KR_DISCLOSURE OF SOLD_1_Oct_to_31_Dec_2024.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KR_Architect Certificate Form I_1_July_to_30_Sept_2024.pdf16 Dec 2024
Certificates of CA (Form 3)File: Form No 3.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: KR_DISCLOSURE OF SOLD_1_July_to_30_Sept_2024.pdf16 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KR_Architect Certificate Form I_1_April_to_30_June_2024.pdf5 Aug 2024
Disclosure of sold/ booked inventoryFile: KR_DISCLOSURE OF SOLD_1_April_to_30_June_2024.pdf5 Aug 2024
Certificates of CA (Form 3)File: Form 3.pdf5 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KR_Engginer_Certificate Form 2_1_Jan_to_31_Mar_2024.pdf24 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: KR_Engginer_Certificate Form 2A_1_Jan_to_31_Mar_2024.pdf24 May 2024
Certificates of CA (Form 3)File: Form3_Krishna Residence.pdf4 May 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf26 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KR_Architect Certificate Form I_1_Jan_to_31_Mar_2024.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: KR_DISCLOSURE OF SOLD_1_Jan_to_31_Mar_2024.pdf26 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA form 5 FY 2022-23 _KDPL _Krishna Residence.pdf13 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_Letter.pdf6 Apr 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE 1_Oct_to_31_Dec_2023.pdf20 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KR_Architect Certificate Form I_1_Oct_to_31_Dec_2023.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: KR_DISCLOSURE OF SOLD_1_Oct_to_31_Dec_2023.pdf20 Jan 2024
Certificates of CA (Form 3)File: CA Rera Certificate - KDPL- Krishna Residency - Dec 2023.pdf20 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Chakala Society Formation Approval.pdf20 Jan 2024
Certificates of CA (Form 3)File: KR_CA_Certificate Form I_1_July_to_30_Sept_2023.pdf2 Nov 2023
Disclosure of sold/ booked inventoryFile: KR_DISCLOSURE OF SOLD_1_July_to_30_Sept_2023.pdf21 Oct 2023
Declaration about Commencement CertificateFile: Declaration of Commencement Certificate.pdf8 Aug 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD_1_April_to_30_Ju0ne_2023.pdf8 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KR_Architect Certificate Form I_1_April_to_30_June_2023.pdf24 Jul 2023
Certificates of CA (Form 3)File: CA_Krishna_Residency.pdf24 Jul 2023
Declaration about Commencement CertificateFile: Declaration of CC.pdf6 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form I_1 Jan_to_31 March.pdf5 Jun 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD__1 Jan_to_31 March_2023.pdf5 Jun 2023
Certificates of CA (Form 3)File: CA_Form_III_1 Jan_to_31 March.pdf5 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form I.pdf21 Feb 2023
Certificates of CA (Form 5)File: KR Form 5.pdf20 Dec 2022
Building plan approvalFile: 2.pdf18 Aug 2022
Building plan approvalFile: 3.pdf18 Aug 2022
Building plan approvalFile: 4.pdf18 Aug 2022
Building plan approvalFile: 5.pdf18 Aug 2022
Building plan approvalFile: 6.pdf18 Aug 2022
Building plan approvalFile: 7.pdf18 Aug 2022
Building plan approvalFile: 8.pdf18 Aug 2022
Building plan approvalFile: 9.pdf18 Aug 2022
Building plan approvalFile: 10.pdf18 Aug 2022
Building plan approvalFile: 11.pdf18 Aug 2022
Building plan approvalFile: 12a.pdf18 Aug 2022
Building plan approvalFile: 13.pdf18 Aug 2022
Building plan approvalFile: 14a.pdf18 Aug 2022
Building plan approvalFile: 1a.pdf18 Aug 2022
Building Plan Approval (IOD)File: 1a.pdf18 Aug 2022
Building Plan Approval (IOD)File: 2.pdf18 Aug 2022
Building Plan Approval (IOD)File: 3.pdf18 Aug 2022
Building Plan Approval (IOD)File: 4.pdf18 Aug 2022
Building Plan Approval (IOD)File: 5.pdf18 Aug 2022
Building Plan Approval (IOD)File: 6.pdf18 Aug 2022
Building Plan Approval (IOD)File: 7.pdf18 Aug 2022
Building Plan Approval (IOD)File: 8.pdf18 Aug 2022
Building Plan Approval (IOD)File: 9.pdf18 Aug 2022
Building Plan Approval (IOD)File: 10.pdf18 Aug 2022
Building Plan Approval (IOD)File: 11.pdf18 Aug 2022
Building Plan Approval (IOD)File: 12a.pdf18 Aug 2022
Building Plan Approval (IOD)File: 13.pdf18 Aug 2022
Building Plan Approval (IOD)File: 14a.pdf18 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf20 Jun 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation.pdf20 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AREC CERTIFICATE_page-0001.pdf15 Jun 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERIFICATE.pdf15 Jun 2020
Building plan approvalFile: CERTIFICATE.pdf16 Mar 2020
Building plan approvalFile: 1.pdf16 Mar 2020
Building plan approvalFile: 2.pdf16 Mar 2020
Building plan approvalFile: ilovepdf_merged-3.pdf16 Mar 2020
Building plan approvalFile: ilovepdf_merged-4.pdf16 Mar 2020
Building plan approvalFile: ilovepdf_merged-5.pdf16 Mar 2020
Building plan approvalFile: ilovepdf_merged-6.pdf16 Mar 2020
Building plan approvalFile: ilovepdf_merged-7.pdf16 Mar 2020

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRISHNA RESIDENCES PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmKRISHNA RESIDENCES PHASECompleted 155Lapsed / revoked 82Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 388 registered projects within 2 km.

Builder: Krishna Developers Pvt. Ltd

Krishna Developers Pvt. Ltd has 2 registrations on MahaRERA, including KRISHNA RESIDENCES PHASE 1 and VKG PARK ESTATE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KRISHNA RESIDENCES PHASE 1 is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRISHNA RESIDENCES PHASE 1?

The registered promoter entity is Krishna Developers Pvt. Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRISHNA RESIDENCES PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KRISHNA RESIDENCES PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KRISHNA RESIDENCES PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRISHNA RESIDENCES PHASE 1?

The professionals named in the filing: Architect: H M JHAVERI AND SONS; Engineer: Raje Structural Consultants Private Limited. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRISHNA RESIDENCES PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRISHNA RESIDENCES PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRISHNA RESIDENCES PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.