Registration lapsed No litigation declared Commercial project

KONAR BUSINESS PARK

By DIVIT VENTURES

RG-MH-30782 · RERA P51700031312 · Last updated on MahaRERA portal: 25 Dec 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
18 of 156Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 139 documents Report an error

KONAR BUSINESS PARK is a Commercial project by DIVIT VENTURES in Thane, Maharashtra, registered with MahaRERA as P51700031312 on 15 Oct 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 138 of the 156 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameKONAR BUSINESS PARK
  • TypeCommercial
  • Location
    • ROAD NO. 16Z
    • MIDC WAGLE ESTATE
    • Thane (M Corp.)
    • Thane
    • 400604
  • Pincode400604
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700031312
  • ReraGenie IDRG-MH-30782

Builder

  • NameDIVIT VENTURES
  • Entity typePartnership
  • PartnersRAJESH RAVJIBHAI PATEL, RAMESH RAVJIBHAI PATEL, JAYANTILAL KEWALCHAND JAIN, KRISHNAN NAMBI KONAR

Key dates

10 months past promisethis monthRegisteredOct 2021First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Oct 2021
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed139 files

Current status

88%138 of 156 units booked
100.0%Work done, per cost certificate

Figures as on 25 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KONAR BUSINESS PARKNA22220156156

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

KONAR BUSINESS PARK: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed166

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots166
Closed/Covered156
Open Space10

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,808 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Dec 2025

Approvals and building plan

Sanctioning authorityMAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION
Permissible FSI10267.59
Proposed, not sanctioned10,268 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHIRANANDANI GARDEN
Estimated costRs 59.29 cr
Cost incurredRs 59.29 cr
Work done100.0%
BuildingWingEstimatedIncurred
KONAR BUSINESS PARKNARs 59.29 crRs 59.29 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAPICES STUDIO PRIVATE LIMITED
EngineerAssociated Structural Consultants LLP
EngineerVENTURX Project Services LLP
Chartered AccountantKARTIK JAYANTILAL PATEL
Chartered AccountantVELANI AND POKAR
PartnerRole in project
DIVIT VENTURES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700026031Dec 2024 → Dec 2025

Reason as filed by the promoter1) The real estate industry went through multiple challenges over the pandemic years with supply chain disruption, labour crisis, and budget crunch slowing down growth. 2) We have been grappled with shortage of labour and a demand slump challenge triggered by market volatility. Construction rates have shot up and the market has also witnessed the pressure of inflation 3) Due to unavailability of skilled labour and labour migration issues, project is affected a lot. Even contractors are asking us to allow them more time due to labour issues. 4) The geopolitical tension around the globe has led

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Jan 2025

Documents filed139

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 2022-04-07-RERA CERTIFICATE - 2.pdf25 Dec 2025
Form 2File: KONAR BUSINESS PARK - FORM 2 CERTIFICATE - 31122022.pdf25 Dec 2025
Form 3File: Form 3 as on 31-12-2022.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold-Unsold Inventory 31-03-22.pdf25 Dec 2025
Form 1File: 2022-04-07-RERA CERTIFICATE - 2.pdf25 Dec 2025
Form 2File: KONAR BUSINESS PARK - FORM 2 CERTIFICATE - 31122022.pdf25 Dec 2025
Form 3File: Form 3 as on 31-12-2022.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold-Unsold Inventory 31-03-22.pdf25 Dec 2025
Form 1File: 2022-05-12-Rera Certificate 03.pdf25 Dec 2025
Form 2File: Form 2.PDF25 Dec 2025
Form 3File: Form 3_11zon.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold-Unsold Inventory 31-03-22.pdf25 Dec 2025
Form 1File: 2022-07-04- RERA CERTICATE-4.pdf25 Dec 2025
Form 2File: Form 2.PDF25 Dec 2025
Form 3File: Form 3_11zon.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold-Unsold Inventory 31-12-24.pdf25 Dec 2025
Form 1File: 2022-12-31-RERA CERTICATE-5b.pdf25 Dec 2025
Form 2File: Form 2.PDF25 Dec 2025
Form 3File: Form 3_11zon.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold-Unsold Inventory 31-12-24.pdf25 Dec 2025
Form 1File: 2023-03-31- RERA CERTICATE-7.pdf25 Dec 2025
Form 2File: Form 2.PDF25 Dec 2025
Form 3File: Form 3_11zon.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold-Unsold Inventory 31-12-24.pdf25 Dec 2025
Form 1File: 2023-06-30- RERA CERTICATE-8.pdf25 Dec 2025
Form 2File: KONAR BUSINESS PARK - FORM 2 CERTIFICATE - 30062023.PDF25 Dec 2025
Form 3File: Form 3 30062024.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold-Unsold Inventory 31-12-24.pdf25 Dec 2025
Form 1File: 2023-10-01- RERA CERTICATE-9.pdf25 Dec 2025
Form 2File: KONAR BUSINESS PARK - FORM 2 CERTIFICATE - 30062023.PDF25 Dec 2025
Form 3File: Form 3 30062024.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold-Unsold Inventory 251224.pdf25 Dec 2025
Form 1File: 2023-12-31- RERA CERTICATE-10.pdf25 Dec 2025
Form 2File: KONAR BUSINESS PARK - FORM 2 CERTIFICATE - 30062023.PDF25 Dec 2025
Form 3File: Form 3 30062024.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold Unsold Inventory 300924.pdf25 Dec 2025
Form 1File: 2023-12-31- RERA CERTICATE-10.pdf25 Dec 2025
Form 2File: Form 2 - March 25.pdf25 Dec 2025
Form 3File: Form 3 30062024.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold Unsold Inventory 300924.pdf25 Dec 2025
Form 1File: 2024-06-30- RERA CERTICATE-11.pdf25 Dec 2025
Form 2File: KONAR BUSINESS PARK FORM 2 CERTIFICATE 30062024.PDF25 Dec 2025
Form 3File: Form 3 30062024.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold Unsold Inventory 300924.pdf25 Dec 2025
Form 1File: 2024-09-30- RERA CERTICATE-12.pdf25 Dec 2025
Form 2File: KONAR BUSINESS PARK FORM 2 CERTIFICATE 30092024.PDF25 Dec 2025
Form 3File: Form 3 30092024.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold Unsold Inventory 300924.pdf25 Dec 2025
Form 1File: 2024-12-30- RERA CERTICATE-13.pdf25 Dec 2025
Form 2File: Form 2 - 31-12-2024.pdf25 Dec 2025
Form 3File: Form 3_11zon.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold-Unsold Inventory 31-12-24.pdf25 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf25 Dec 2025
Withdrawal Update Form 2File: Form 2 Signed.pdf25 Dec 2025
Withdrawal Update Form 3File: Form 3 Scanned_11zon.pdf25 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf24 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf24 Dec 2025
Withdrawal Update Form 2File: Form 2 Signed.pdf24 Dec 2025
Withdrawal Update Form 2File: Form 2 Signed.pdf24 Dec 2025
Withdrawal Update Form 3File: Form 3 Scanned_11zon.pdf24 Dec 2025
Withdrawal Update Form 3File: Form 3 Scanned_11zon.pdf24 Dec 2025
Form 5 (FY 2024-2025)File: Form 5_24_25.pdf30 Sep 2025
Form 1File: 2025-03-31- RERA CERTICATE-14.pdf18 Jul 2025
Form 2File: KONAR BUSINESS PARK FORM 2 CERTIFICATE 31_03_2025.pdf18 Jul 2025
Form 3File: Form 3 31032025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold-Unsold Inventory 31032025.pdf18 Jul 2025
Form 1File: Form 1 - 30062025.pdf18 Jul 2025
Form 2File: KONAR BUSINESS PARK FORM 2 CERTIFICATE 30_06_2025.pdf18 Jul 2025
Form 3File: Form 3 30062025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Konar Business Park Disclosure of Sold-Unsold Inventory 30_06_2025.pdf18 Jul 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf22 Mar 2025
Other - TechnicalFile: 5.pdf22 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN JAYANTILAL KEWALCHAND JAIN.pdf22 Mar 2025
Other - TechnicalFile: PERT Konark.pdf18 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q1_FY 23-24.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q2_FY 23-24.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q3_FY 23-24.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q1_FY 24-25.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q2_FY 24-25.pdf25 Feb 2025

How this compares with Thane

88%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KONAR BUSINESS PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIDC WAGLE ESTATE7,600+ in Thane

2 kmKONAR BUSINESS PARKCompleted 75Lapsed / revoked 38Other 112Dot size: filed unitsN

Filed coordinates, straight-line distance. 225 registered projects within 2 km.

Builder: DIVIT VENTURES

DIVIT VENTURES has 1 registration on MahaRERA, including KONAR BUSINESS PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that KONAR BUSINESS PARK shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KONAR BUSINESS PARK is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KONAR BUSINESS PARK?

The registered promoter entity is DIVIT VENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KONAR BUSINESS PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KONAR BUSINESS PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KONAR BUSINESS PARK?

The professionals named in the filing: Architect: APICES STUDIO PRIVATE LIMITED; Engineer: Associated Structural Consultants LLP; Engineer: VENTURX Project Services LLP; Chartered Accountant: KARTIK JAYANTILAL PATEL; Chartered Accountant: VELANI AND POKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KONAR BUSINESS PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KONAR BUSINESS PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KONAR BUSINESS PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.