Home / Browse projects / Bengaluru Urban, Karnataka / Klassik Exotica
Klassik Exotica
By Klassik Enterprises Private Limited
RG-KA-77801 · RERA PRM/KA/RERA/1251/308/PR/050525/007712 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Klassik Exotica is a Residential/Group Housing project by Klassik Enterprises Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/050525/007712 on 5 May 2025. Possession is promised by 31 Mar 2027. 12 of the 117 units on this registration are recorded sold or booked, and 4 of 18 construction stages are filed complete.
At a glance
Project
- NameKlassik Exotica
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/308/PR/050525/007712
- ReraGenie IDRG-KA-77801
Builder
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on5 May 2025
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings2 building records
- Documents filed125 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | - | - | - | 59 | 0 | 59 |
| Tower 2 | - | - | - | 58 | 0 | 58 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 90%.
Building: 70% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 75% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 90% |
| Masonry Construction | 90% |
| Plastering inside , outside & Ceiling | 85% |
| Joinery: Doors, Windows, Ventilators etc | 80% |
| Basic work of Water supply, Sanitary and Electrification | 75% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 70% |
| Railing and Grill fixing | 70% |
| Electrification, Water supply and Sanitary Finishing | 25% |
| Painting | 40% |
| Fire prevention and fire fighting fitting and fixture with network | 80% |
| Weather Proof work(tile,concrete) | 60% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 25% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 80% |
| Sewage and Drainage System | Yes | 60% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 40% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 90% |
| Lifts | Yes | 80% |
| Corridor/Lobbies | Yes | 90% |
| Fire escapes | Yes | 90% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 40% |
| Basement | Yes | 80% |
| Terrace | Yes | 80% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Devandar Reddy M | - | - |
| Devandar Reddy M | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 62.58 cr | Rs 4.75 cr |
| On-site expenditure-Site Overhead | Rs 6.31 cr | Rs 67.27 lakh |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 6.03 cr | Rs 51.06 lakh |
| On-site expenditure-Salaries of workers | Rs 2.92 cr | - |
| Payment of charges | Rs 9.69 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gnanavel T |
| Engineer | B V Nagesh |
| Chartered Accountant | B N Phalghuna |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed125
As listed on the registration, under the names the promoter filed them with; the newest 80 of 125 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/050525/007712 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Qu 2 2026-27 FORM-4 Klassik Exotica.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Qu 2 2026-27 Form - 5 - Klassik Exotica.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Qu 2 2026-27 Form - 6 - Klassik Exotica.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Horticulture department | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Qu 1 26-27 CA Form- 4 Klassik Exotica.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Qu 1 26-27 Ar Form 5 Klassik Exotica.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Qu 1 26-27 Er Form 6 Klassik Exotica_compressed.pdf | 14 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 14 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 14 Jul 2026 |
| Q1 2026-27 Horticulture department | 14 Jul 2026 |
| Q1 2026-27 Fire and Safety | 14 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 14 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Qu 4 25-26 Form- 4 CA KE.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Qu 4 25-26 From-5 Ar KE.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Qu 4 25-26 From-6 Er KE.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Horticulture department | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Qu 3 25-26 Form- 4 - Klassik Exotica.pdf | 18 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Qu 3 - 25-26 - Form-5 - Klassik Exotica (1).pdf | 18 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Qu 3 - 25-26 - Form-6 - Klassik Exotica.pdf | 18 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 18 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 18 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 18 Jan 2026 |
| Q3 2025-26 Horticulture department | 18 Jan 2026 |
| Q3 2025-26 Fire and Safety | 18 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 18 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 18 Jan 2026 |
| COMMON AREAS ALLOTED HAVE BEEN UPDATED AND AREA STATEMENT CERTIFIED BY ENGINEER FOR TOWER 1File: Inventory in SQM Tower 1 Klassik Exotica.pdf | 24 Apr 2025 |
| COMMON AREAS ALLOTED HAVE BEEN UPDATED AND AREA STATEMENT CERTIFIED BY ENGINNER FOR TOWER 2File: Inventory in SQM Tower 2 Klassik Exotica.pdf | 24 Apr 2025 |
| NOC HAL CLARIFICATIONFile: Clarification over the NOC - HAL.pdf | 24 Apr 2025 |
| TOWER 1 & 2 AREA CERTIFICATION BY THE STRUCTURAL ENGINEERFile: INVENTORY AREA CERTIFICATION OF TOWER 1 & 2 BY STRUCTURAL ENGINEER.pdf | 24 Apr 2025 |
| Defect free authenticated EC for all Sy Nos 1/1/2009 to 8/4/2025File: R 1 EC Sy No 1- 1 & 80 01 01 2009 to 08 04 2025.pdf | 14 Apr 2025 |
| Mother Conversion Order Sy No 1/1File: R 2 Mother Conversion Order Sy No 1 -1.pdf | 14 Apr 2025 |
| Mother Conversion Order Sy No 80File: R 2 Mother Conversion Order Sy No 80.pdf | 14 Apr 2025 |
| B DeclarationFile: R 3 Affidavit FORM B Final Corrected.pdf | 14 Apr 2025 |
| Clarification Single Plot LayoutFile: TCP 1 Clarification in regard to Single Plot Layout.pdf | 14 Apr 2025 |
| Clarification over Single Layout OrderFile: TCP 2 Clarification in regard to Single Layout Order.pdf | 14 Apr 2025 |
| Building licenseFile: TCP 3 Building License Billapura Village Panchayath.pdf | 14 Apr 2025 |
| ADLR and Other SketchesFile: TCP 4 Certified ADLR & other sketches.pdf | 14 Apr 2025 |
| Approved Clear Plan OriginalFile: TCP 5 Approved Clear Plan.pdf | 14 Apr 2025 |
| Sanctioned Original Drawings, Floor Plan, Sectional Drawings and ElevationsFile: TCP 6 Sanctioned Drawings, Floor Plan, Sectional Drawings and Elevations.pdf | 14 Apr 2025 |
| Commencement CertificateFile: TCP 7 Commencement Certificate.pdf | 14 Apr 2025 |
| Master Plan Anekal TalukaFile: TCP 8 Master Plan Anekal Taluk_compressed.pdf | 14 Apr 2025 |
| Village MapFile: TCP 9 Village Map Boorigunte.pdf | 14 Apr 2025 |
| NOC KSPCBFile: TCP 10 NOC KSPCB.pdf | 14 Apr 2025 |
| Clarification under section 14 KTCP ActFile: TCP 11 Clarification over Approval NOC under section 14 of the KTCP Act with the proof.pdf | 14 Apr 2025 |
| Updated the status of ongoing project on the portal pageFile: E 2 Clarification over the update of project ongoing status.pdf | 14 Apr 2025 |
| PAL with Annexure A duly signedFile: E 3 PAL with Annexure A duly signed.pdf | 14 Apr 2025 |
| STP Drawings as certified by the EngineerFile: E 4 STP Drawing as certified by Engineer.pdf | 14 Apr 2025 |
| Land Cost Calculation as per guidelines valueFile: E 5 Land Cost Calculation as per GVC.pdf | 14 Apr 2025 |
| Clarification over the source of water to the projectFile: E 6 Clarification over the Water Source for the Project Klassik Exotica.pdf | 14 Apr 2025 |
| NOC BESCOM clear scan copy attestedFile: E 7 NOC - BESCOM.pdf | 14 Apr 2025 |
| NOC Airport Authority clear scan copy attestedFile: E 7 NOC Airport Authority.pdf | 14 Apr 2025 |
| NOC Fire & Emergency Services clear copy attestedFile: E 7 NOC Fire & Emergency Services.pdf | 14 Apr 2025 |
| NOC KSPCB clear copy attestedFile: E 7 NOC PCB.pdf | 14 Apr 2025 |
| NOC Water Billapur Village Panchayat clear copy attestedFile: E 7 NOC -Water Billapur Panchayath.pdf | 14 Apr 2025 |
| NOC Airport Authority of India clear copy attestedFile: E 8 NOC Airport Authority.pdf | 14 Apr 2025 |
| Registration CertificateFile: Certificate of Incorporation Dt 27 08 2003.pdf | - |
| Memorandum of AssociationFile: MOA.pdf | - |
| Article of AssociationFile: AOA.pdf | - |
| GST CertificateFile: GST Certificate (Amended) - KEPL.pdf | - |
| Certificate issued by CA Form 1File: Form 1 Klassik Exotica.pdf | - |
| Certificate issued by Architect Form 2File: Form 2 Certificate from Architect.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Certificate by Engineer F.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Klassik Landmark | Sy No 34/9-13, Junnasandra, Varthur Hobli, Bengaluru East | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Klassik Exotica on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Klassik Enterprises Private Limited
Klassik Enterprises Private Limited has 3 registrations on RERA Karnataka, including Klassik Exotica and KLASSIK LANDMARK APARTMENTS - PHASE II. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Klassik Exotica is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Klassik Exotica?
The registered promoter entity is Klassik Enterprises Private Limited, a company as per the filing. Its GSTIN 27AACCK1800D1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Klassik Exotica?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Klassik Exotica?
The professionals named in the filing: Architect: Gnanavel T; Engineer: B V Nagesh; Chartered Accountant: B N Phalghuna. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Klassik Exotica?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback