Registration approved Residential/Group Housing project

Kings Square

By Suvastu Housing Pvt ltd

RG-KA-20007 · RERA PRM/KA/RERA/1251/446/PR/180217/002121

Source: official RERA Karnataka filing

Red flags

  • 7 complaints at RERA Karnataka

Clear

  • Completion date never moved
  • Separate project account declared
Dec 2018Possession promisedno revision filed
7Complaints at RERA Karnatakaon this registration
Jump to the 56 documents Report an error

Kings Square is a Residential/Group Housing project by Suvastu Housing Pvt ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/180217/002121 on 17 Feb 2018. Possession is promised by 31 Dec 2018. 7 complaints are on record with the regulator.

At a glance

Project

  • NameKings Square
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/180217/002121
  • ReraGenie IDRG-KA-20007

Builder

  • NameSuvastu Housing Pvt ltd
  • Entity typeCompany
  • CINU70102KA2012PTC064973
  • Authorized SignatoryManoj Kumar

Key dates

this monthRegisteredFeb 2018PromisedDec 2018

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Feb 2018
  • Promised completion31 Dec 2018
  • Revised completionNone
  • Buildings2 building records
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---24024
All Towers---1200120

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing workNot applicable
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,993 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 28.60 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBasavaraj M Kapale
EngineerBasavaraj M Kapale

Complaints filed with RERA Karnataka7

Case no.ComplainantRespondentFiled
CMP/200913/0006559-Suvastu Housing Pvt ltd13/09/2020
01492/2023-Suvastu Housing Pvt ltd25/09/2023
00451/2024-Suvastu Housing Pvt ltd23/05/2024
00537/2026-Suvastu Housing Pvt ltd14/05/2026
00792/2026-Suvastu Housing Pvt ltd07/07/2026
00812/2026-Suvastu Housing Pvt ltd14/07/2026
01205/2026-Suvastu Housing Pvt ltd07/10/2026

Documents filed56

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/180217/002121 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: S Housing CoI.jpeg-
Architect Certificate for Work Completion Schedule till DateFile: Arct - PE1.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer - PE2.pdf-
CA Certificate for Funds UtilizationFile: Arct - Form 5 - PE.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arct - PE1.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer - PE2.pdf-
CA Certificate for Funds required for Project CompletionFile: Arct - Form 5 - PE.pdf-
AffidavitFile: FORM B.pdf-
Details Of Sold/ Un-sold UnitsFile: N A.pdf-
CC-
site plan-
site plan-
Sample Agreement to Sale-
Sample Agreement to Sale-
site plan-
Section & Elevation-
sale deed-
site plan-
site plan-
Sample Agreement to Sale-
SQUARE BROCHURE-
pollution noc-
specification-
EC-
Kodati EKhatha-
JDA-
RTC 1-
conversion order-
Water NOC-
pollution noc-
Unnamed document-
1st 2nd 3rd 4th and terrace-
S Housing Layout Plan-
S Housing Sanction Plan-
S Housing CC-
LEGAL REPORT-
Balance Sheet 2015 - 2016File: BALANCE SHEET.pdf-
Balance Sheet 2014 - 2015File: BALANCE SHEET.pdf-
Balance Sheet 2013 - 2014File: BALANCE SHEET.pdf-
Audited Profit and Loss Statement 2015 - 2016File: PROFIT AND LOSS.pdf-
Audited Profit and Loss Statement 2014 - 2015File: PROFIT AND LOSS.pdf-
Audited Profit and Loss Statement 2013 - 2014File: PROFIT AND LOSS.pdf-
Director's Report 2015 - 2016File: AUDITED.pdf-
Director's Report 2014 - 2015File: AUDITED.pdf-
Director's Report 2013 - 2014File: AUDITED.pdf-
Cash Flow Statement 2015 - 2016File: BALANCE SHEET.pdf-
Cash Flow Statement 2014 - 2015File: BALANCE SHEET.pdf-
Auditor's Report 2015 - 2016File: AUDITED.pdf-
Auditor's Report 2014 - 2015File: AUDITED.pdf-
Auditor's Report 2013 - 2014File: AUDITED.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ACKNOWLEDGEMENT.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ACKNOWLEDGEMENT.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: ACKNOWLEDGEMENT.pdf-
form b-
Prospectus/BrochureFile: N A.pdf-
Advertisement Copy 1File: N A.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Kings Square on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmKings SquareOther 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: Suvastu Housing Pvt ltd

Suvastu Housing Pvt ltd has 1 registration on RERA Karnataka, including Kings Square. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Kings Square is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Kings Square?

The registered promoter entity is Suvastu Housing Pvt ltd, a company as per the filing. Its CIN U70102KA2012PTC064973 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Kings Square?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kings Square?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Kings Square?

The professionals named in the filing: Architect: Basavaraj M Kapale; Engineer: Basavaraj M Kapale. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kings Square?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kings Square. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kings Square to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.