Home / Browse projects / Bengaluru Urban, Karnataka / King George Avenue

Registration approved Residential/Group Housing project

King George Avenue

By Bright Wave Projects Private Limited

RG-KA-45557 · RERA PRM/KA/RERA/1251/308/PR/181210/002203

Source: official RERA Karnataka filing

Red flags

  • 2 complaints at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
May 2022Possession promisedmoved 9 months from the original
2Complaints at RERA Karnatakaon this registration
Jump to the 45 documents Report an error

King George Avenue is a Residential/Group Housing project by Bright Wave Projects Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/181210/002203 on 10 Dec 2018. Possession is promised by 18 May 2022. The completion date has moved by 9 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameKing George Avenue
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/181210/002203
  • ReraGenie IDRG-KA-45557

Builder

  • NameBright Wave Projects Private Limited
  • Entity typeCompany
  • CINU70100AP2013PTC086067
  • Authorized SignatoryAjay Bhagat
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2018First promiseAug 2021Revised toMay 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on10 Dec 2018
  • Promised completion18 May 2022
  • Revised completionRevised to 18 May 2022 (originally 18 Aug 2021)
  • Buildings1 building record
  • Documents filed45 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KING GEORGE AVENUE---1200120

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,051 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 16.00 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionAug 2021 → May 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
00965/2025-Bright Wave Projects Private Limited24/07/2025
00966/2025-Bright Wave Projects Private Limited24/07/2025

Documents filed45

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/181210/002203 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Certificate of Incorporation-040313.pdf-
Architect Certificate for Work Completion Schedule till DateFile: KGA Architech Certificate.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: KGA Engineer CERTIFICATE.PDF-
CA Certificate for Funds UtilizationFile: CA Certificate - Funds Utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: KGA Architech Certificate.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: KGA Engineer CERTIFICATE.PDF-
CA Certificate for Funds required for Project CompletionFile: CA Certificate - Funds Utilized.pdf-
AffidavitFile: KGA Architech Certificate.pdf-
Latest Encumbrance CertificateFile: CA Certificate - Funds Utilized.pdf-
Details Of Sold/ Un-sold UnitsFile: King George Avenue - SOLD AND UnSold Apts.xlsx-
Commence Certificate (Revised)-
plan 5 mb-
Plan-
sale deed & RTC-
plan 5 mb-
rera-scan-
Brouchure-
Specifications-
EC Uploaded New-
khatha-
JDA and GPA-uploaded-
converstion-
KSPcb-
Plan-
Balance Sheet 2016 - 2017File: Balance Sheet - 2017.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet 2015.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P and L.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P & L Account 2016-uploaded.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Pand L.pdf-
Director's Report 2016 - 2017File: Audit Report - 2017.pdf-
Director's Report 2015 - 2016File: Director Report -uploaded.pdf-
Director's Report 2014 - 2015File: Director's Report - 2015.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow - 2017.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow.pdf-
Auditor's Report 2016 - 2017File: Audit Report - 2017.pdf-
Auditor's Report 2015 - 2016File: Auditor Report-uploaded.pdf-
Auditor's Report 2014 - 2015File: Auditors Report - 2015.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: 17-18.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: 16-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: 15-16.pdf-
affidavit-
Prospectus/BrochureFile: Brouchure.jpg-
Advertisement Copy 1File: Advertisement.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_181210_002203.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep King George Avenue on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmKing George AvenueOther 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: Bright Wave Projects Private Limited

Bright Wave Projects Private Limited has 2 registrations on RERA Karnataka, including King George Avenue and Tulip. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if King George Avenue is delayed beyond 18 May 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of King George Avenue?

The registered promoter entity is Bright Wave Projects Private Limited, a company as per the filing. Its CIN U70100AP2013PTC086067 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in King George Avenue?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against King George Avenue?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in King George Avenue?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About King George Avenue. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save King George Avenue to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.