ReraGenieLog inGet a buyer report

Home / Browse projects / Sangli, Maharashtra / KHUSHI ONE

Registered No litigation declared Residential / Group Housing project

KHUSHI ONE

By KHUSHI PRIME ESTATE PRIVATE LIMITED

RG-MH-35622 · RERA P53100081062 · Last updated on MahaRERA portal: 4 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Sep 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

KHUSHI ONE is a Residential / Group Housing project by KHUSHI PRIME ESTATE PRIVATE LIMITED in Sangli, Maharashtra, registered with MahaRERA as P53100081062 on 8 Dec 2025. Possession is promised by 25 Sep 2028.

At a glance

Project

  • NameKHUSHI ONE
  • TypeResidential / Group Housing
  • Location
    • KILLA BHAG NEAR ADARSH SCHOOL MIRAJ 416410
    • NEAR ADARSH SCHOOL
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416410
  • Pincode416410
  • RERA no.P53100081062
  • ReraGenie IDRG-MH-35622

Builder

  • NameKHUSHI PRIME ESTATE PRIVATE LIMITED
  • Entity typeCompany
  • CINU45402PN2022PTC210928
  • GSTIN27AAJCK5016A1ZX
  • Partnerraheel kasim maner
  • Other registrations1 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2025PromisedSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Dec 2025
  • Promised completion25 Sep 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KHUSHI ONENA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

KHUSHI ONE: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed99

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots99
Closed/Covered44
Open Space55

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,388 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
NAMDEV GAJANAN KITTURESangli Miraj Kupwad (M Corp.)Sangli
MAHESH GAJANAN KITTURESangli Miraj Kupwad (M Corp.)Sangli
VIDYA MAHESH KOREIchalkaranji (M Cl)Kolhapur
SUNANDA GURULING KITTURESangli Miraj Kupwad (M Corp.)Sangli
AMOL MAHADEV KITTURESangli Miraj Kupwad (M Corp.)Sangli
VIRUPAKSH SANGAPPA KITTURESangli Miraj Kupwad (M Corp.)Sangli

Approvals and building plan

Permissible FSI6404.49
Proposed, not sanctioned6,404 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIRAJ SANGLI 416410

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHEEL MANER
EngineerRAHEEL MANER
Chartered AccountantCA SHREYAS SUHAS SHAH
PartnerRole in project
KHUSHI PRIME ESTATE PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 25 Sep 2028

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 (2).pdf4 Jul 2026
Form 2File: Form 2 (2).pdf4 Jul 2026
Form 3File: Form 3.pdf4 Jul 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold.pdf4 Jul 2026
Form 1File: Form 1 March.pdf4 Jul 2026
Form 2File: Form 2 March.pdf4 Jul 2026
Form 3File: Form 2 A March.pdf4 Jul 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold (2).pdf4 Jul 2026
Form 1File: Form 1.pdf23 Mar 2026
Form 2File: Form 2.pdf23 Mar 2026
Form 3File: CA CERTIFICATE KHUSHI ONE.pdf23 Mar 2026
Disclosure of Sold and Booked InventoryFile: Unsold Inventory.pdf23 Mar 2026
OthersFile: Form 2A.pdf23 Mar 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE KHUSHI ONE.pdf27 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE KHUSHI ONE.pdf27 Nov 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE - FINANCIAL.pdf7 Apr 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE - FINANCIAL.pdf7 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: SELF-DECLARATION CUM UNDERTAKING LANDOWNER BANK.pdf7 Apr 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE - FINANCIAL.pdf7 Apr 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE - FINANCIAL.pdf7 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: SELF-DECLARATION CUM UNDERTAKING LANDOWNER BANK.pdf7 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: SMKC TO MAHARERA MAIL.pdf22 Mar 2025
Other - TechnicalFile: Khushi ONE declaration ABOUT PLOT AREA.pdf22 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: SMKC TO MAHARERA MAIL.pdf22 Mar 2025
Other - TechnicalFile: Khushi ONE declaration ABOUT PLOT AREA.pdf22 Mar 2025
CERSAI detailsFile: UNDERTAKING.pdf20 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in other real estate org KASHIM MANER.pdf20 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in other real estate org RAHEEL.pdf20 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: disclosure for secured.pdf20 Dec 2024
CERSAI detailsFile: UNDERTAKING.pdf20 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in other real estate org KASHIM MANER.pdf20 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in other real estate org RAHEEL.pdf20 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: disclosure for secured.pdf20 Dec 2024
Layout approvalFile: sheet - 1.pdf19 Dec 2024
Building plan approvalFile: sheet- 2.pdf19 Dec 2024
Building plan approvalFile: sheet -3.pdf19 Dec 2024
Building plan approvalFile: sheet - 4.pdf19 Dec 2024
Building plan approvalFile: sheet- 5.pdf19 Dec 2024
Layout approvalFile: sheet - 1.pdf19 Dec 2024
Building plan approvalFile: sheet- 2.pdf19 Dec 2024
Building plan approvalFile: sheet -3.pdf19 Dec 2024
Building plan approvalFile: sheet - 4.pdf19 Dec 2024
Building plan approvalFile: sheet- 5.pdf19 Dec 2024
Copy of Layout Approval (in case of layout)File: sheet - 1.pdf19 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE_BANDHKAM PARVANGI.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet- 5.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet - 4.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet- 2.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet -3.pdf19 Dec 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf19 Dec 2024
Other - TechnicalFile: DECLARATION CUM UNDERTAKING.pdf19 Dec 2024
Copy of Layout Approval (in case of layout)File: sheet - 1.pdf19 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE_BANDHKAM PARVANGI.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet- 5.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet - 4.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet- 2.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet -3.pdf19 Dec 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf19 Dec 2024
Other - TechnicalFile: DECLARATION CUM UNDERTAKING.pdf19 Dec 2024
PAN CardFile: KHUSHI PRIME ESTATE PAN CARD.pdf16 Dec 2024
Copy of the legal title reportFile: LEGAL TITLE REPORT WITH FLOW OF TITLE 12 11 24.pdf16 Dec 2024
Details of encumbrances concerned to FinanceFile: DECLARATION RAGARDING FINANCIAL ENCUMBRANCES.pdf16 Dec 2024
Proforma of Allotment letterFile: ANNEXUR 1 ALLOTMENT LETTER.pdf16 Dec 2024
Declaration in FORM BFile: FORM B ( Raheel maner).pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 13-11-24.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 30-11-24.pdf16 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A BANK LATEST.pdf16 Dec 2024
Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER 20-9-24.pdf16 Dec 2024
Details of encumbrances concerned to LegalFile: DECLARATION RAGARDING FINANCIAL ENCUMBRANCES.pdf16 Dec 2024
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION REPORT.pdf16 Dec 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale_RERA APPROVED.pdf16 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf16 Dec 2024
PAN CardFile: KHUSHI PRIME ESTATE PAN CARD.pdf16 Dec 2024
Copy of the legal title reportFile: LEGAL TITLE REPORT WITH FLOW OF TITLE 12 11 24.pdf16 Dec 2024
Details of encumbrances concerned to FinanceFile: DECLARATION RAGARDING FINANCIAL ENCUMBRANCES.pdf16 Dec 2024
Proforma of Allotment letterFile: ANNEXUR 1 ALLOTMENT LETTER.pdf16 Dec 2024
Declaration in FORM BFile: FORM B ( Raheel maner).pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 13-11-24.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 30-11-24.pdf16 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A BANK LATEST.pdf16 Dec 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
KHUSHI VISTARAP53100056175SHIVAJINAGAR, Sangli-May 2024OngoingJan 2027Not due yet
KHUSHI ICONICP53100047975TAKALI ROAD, Sangli-Dec 2022CompletedJul 2025Oct 2024
KHUSHI PRIDEP53100028957NEAR FATIMA MASJID, Sangli72Apr 2021CompletedMay 2024Jan 1970

How this compares with Sangli

11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is on the register

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep KHUSHI ONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR ADARSH SCHOOL790+ in Sangli

Builder: KHUSHI PRIME ESTATE PRIVATE LIMITED

KHUSHI PRIME ESTATE PRIVATE LIMITED has 2 registrations on MahaRERA, including KHUSHI VISTARA and KHUSHI ONE. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if KHUSHI ONE is delayed beyond 25 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KHUSHI ONE?

The registered promoter entity is KHUSHI PRIME ESTATE PRIVATE LIMITED, a company as per the filing. Its CIN U45402PN2022PTC210928 and GSTIN 27AAJCK5016A1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KHUSHI ONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KHUSHI ONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KHUSHI ONE?

The professionals named in the filing: Architect: RAHEEL MANER; Engineer: RAHEEL MANER; Chartered Accountant: CA SHREYAS SUHAS SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KHUSHI ONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KHUSHI ONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KHUSHI ONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.