ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Kashish Park Tower B

Completed No litigation declared Residential / Group Housing project

Kashish Park Tower B

By Kashish Park Realtors

RG-MH-09527 · RERA P51700001799 · Last updated on MahaRERA portal: 27 Jan 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

Kashish Park Tower B is a Residential / Group Housing project by Kashish Park Realtors in Thane, Maharashtra, registered with MahaRERA as P51700001799 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameKashish Park Tower B
  • TypeResidential / Group Housing
  • Location
    • LBS Marg
    • Thane west
    • Thane (M Corp.)
    • Thane
    • 400604
  • Pincode400604
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700001799
  • ReraGenie IDRG-MH-09527

Builder

  • NameKashish Park Realtors
  • Entity typePartnership
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed129 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower BNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Tower B: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed84

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots84
Closed/Covered84

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,380 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5365.56
Proposed, not sanctioned5,356 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 16 Ground Floor Kanakia Zillion LBS CST Road Junction BKC Annexe Kurla West Mumbai 400070 Ma

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTenfolds Architects & Consultants
EngineerPallickal Chacko Varghese
Chartered AccountantI P Mehta & Co
Chartered AccountantC R More & Associates
PartnerRole in project
Kashish Park Realtors-

Litigation declared4

CaseCourtStatus
18/2016District Session Court ThaneHearing
155/2016Civil Court Senior division ThaneHearing
01/2017Civil Court Senior division ThaneHearing
13960/2017Bombay High CourtNot Yet admitted

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Sep 2022

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: KPR TB Quality Assurance Certificate Quarter ended 31March22.pdf27 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: KPR TB Form 5 dt 16Sep2022.pdf24 Jan 2023
Status of ConveyanceFile: MAHARERA CONVEYANCE COMPLIANCE NOTE dt 20Jan2023.pdf20 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Kashish Park Tower B Society Regn Certificate dated 15Dec2022.pdf16 Dec 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Tower B OC from TMC dt 27Sep2022.pdf29 Sep 2022
Architect’s Certificate on Completion of Project (Form 4)File: KPR TB Form 4 from 10Foids dt 28Sep2022.pdf29 Sep 2022
Certificates of CA (Form 5)File: KPR TB Form 5 dt 16Sep2022.pdf24 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Pallickal Chacko varghese to KPR TB Engineers Certificate dt 07Jul2022.pdf11 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: KPR TB CA Certificate dated 7July2022 reduced.pdf7 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KPR TB Architect Certificate for Quarter ended 30June2022.pdf6 Jul 2022
Disclosure of sold/ booked inventoryFile: KPR TB Circular 29 dt 30Jun2022 New.pdf6 Jul 2022
CERSAI detailsFile: CERSAI June 2022.pdf5 Jul 2022
Form 2AFile: ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE 31-03-2021.pdf24 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KPR TB Architect Certificate Quarter ended 31March22.pdf7 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KPR TB Engineer Certificate Quarter ended 31March22.pdf7 Apr 2022
Form 2AFile: KPR TB Quality Assurance Certificate Quarter ended 31March22.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: KPR TB cricular 29 quarter ended 31March22.pdf7 Apr 2022
CERSAI detailsFile: CERSAI dated 7April2022.pdf7 Apr 2022
Certificates of CA (Form 3)File: KPR TB CA Certificate Quarter ended 31March22.pdf7 Apr 2022
Form 2AFile: KPR Tower B Quality Assurance Certificate March22 New.pdf5 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate TB 31Dec21.pdf6 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TB Engineers Certificate Dec 21.pdf6 Jan 2022
Certificates of CA (Form 3)File: KPR TB CA Certificate 31Dec21.pdf6 Jan 2022
Disclosure of sold/ booked inventoryFile: Circular 29 dt 05Jan22.pdf5 Jan 2022
CERSAI detailsFile: CERSAI Reports 103 1603 1803 2102 as on 31Dec21.pdf4 Jan 2022
Building plan approvalFile: REFUGE AND TYPICAL FLOORS 18-21_15DEC21.pdf3 Jan 2022
Building plan approvalFile: TERRACE FLOOR PLAN AND SECTION 15DEC21.pdf3 Jan 2022
Layout approvalFile: LAYOUT AND STILT FLOOR PLAN 15DEC21.pdf3 Jan 2022
Building plan approvalFile: LAYOUT AND STILT FLOOR PLAN 15DEC21.pdf3 Jan 2022
Building plan approvalFile: PODIUM AND TYPICAL FLOORS 2-16_15DEC21.pdf3 Jan 2022
Details of encumbrancesFile: KPR Tower B Encumbrance certificate 31Dec21.pdf3 Jan 2022
Copy of Layout Approval (in case of layout)File: LAYOUT AND STILT FLOOR PLAN 15DEC21.pdf3 Jan 2022
Building Plan Approval (IOD)File: LAYOUT AND STILT FLOOR PLAN 15DEC21.pdf3 Jan 2022
Building Plan Approval (IOD)File: PODIUM AND TYPICAL FLOORS 2-16_15DEC21.pdf3 Jan 2022
Building Plan Approval (IOD)File: REFUGE AND TYPICAL FLOORS 18-21_15DEC21.pdf3 Jan 2022
Building Plan Approval (IOD)File: TERRACE FLOOR PLAN AND SECTION 15DEC21.pdf3 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: 0047 Tower B amended CC dtd 15-12-2021.pdf3 Jan 2022
Declaration about Commencement CertificateFile: Circular 32 Declaration about Commencement Certificate 31Dec21.pdf3 Jan 2022
Certificates of CA (Form 3)File: Form 3 CA certificate Tower B Sept 2021.pdf13 Oct 2021
Details of encumbrancesFile: 33 Flats Cersai Reports .pdf6 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: TMC commencement certificate Tower B and C1 dt 20Mar2020.pdf4 Oct 2021
Declaration about Commencement CertificateFile: Kashish Park tower B Circular 32 fomat D.pdf4 Oct 2021
Form 2AFile: KPR T B - ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE 30-9-2021.pdf4 Oct 2021
Form 2AFile: KPR T B - ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE 30-9-2021.pdf4 Oct 2021
Certificates of CA (Form 3)File: Form 3 covering letter change in estimate tower B.pdf4 Oct 2021
Disclosure of sold/ booked inventoryFile: KPR cricular 29 dt 30Sept21.pdf2 Oct 2021
Certificates of CA (Form 5)File: KPR Tower B Form 5 Sept 2021.pdf30 Sep 2021
Certificates of CA (Form 5)File: KPR Tower B Form 5 Sept 2021.pdf30 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Tower B Atlantis Permission for opening Bank Accounts for CHSL dt 08Apr2021.pdf11 Sep 2021
Details of encumbrancesFile: CERSAI Search Reports.pdf13 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KPR Tower B Form 1 Architect Certificate as on 30th June 2021.pdf11 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KPR Tower B Form 2 Engg Certificate as on 30th June 2021.pdf11 Aug 2021
Certificates of CA (Form 3)File: KPR Tower B Form 3 CA Certificate as on 30th June 2021.pdf11 Aug 2021
Disclosure of sold/ booked inventoryFile: TB Circular 29 revised format 5th Aug 2021.pdf5 Aug 2021
Disclosure of sold/ booked inventoryFile: KPR TB -Circular 29 dt 29uly21.pdf30 Jul 2021
Disclosure of sold/ booked inventoryFile: KPR TB -Circular 29 dt 16Jun21.pdf16 Jun 2021
Disclosure of sold/ booked inventoryFile: KPR TB -Circular 29 dt 01June21.pdf1 Jun 2021
Disclosure of sold/ booked inventoryFile: KPR TB -Circular 29 dt 28May21.pdf28 May 2021
Disclosure of sold/ booked inventoryFile: KPR TB -Circular 29 as on 21May2021.pdf21 May 2021
Disclosure of sold/ booked inventoryFile: Circular 29 Disclosure of sold OR booked inventory 31March21.pdf10 May 2021
Proforma of Allotment letterFile: Revised Tower B Agreement for sale draft 2020 nov 25.pdf26 Nov 2020
Details of encumbrancesFile: KPR TB Encumbrance Certificate dt 03Nov2020.pdf3 Nov 2020
Certificates of CA (Form 5)File: RERA KPR FORM 5 dt 29 Sep 2020.pdf30 Sep 2020
Details of Restarting of Construction work post lockdownFile: KPR RERA upload for COVID restart dt 19June2020_signed.pdf19 Jun 2020
Layout approvalFile: Sanction Plans Tower B 20 Mar 2020 _1.pdf30 Mar 2020
Building plan approvalFile: Sanction Plans Tower B 20 Mar 2020_2.pdf30 Mar 2020
Building plan approvalFile: Sanction Plans Tower B 20 Mar 2020_3.pdf30 Mar 2020
Building plan approvalFile: Sanction Plans Tower B 20 Mar 2020_4.pdf30 Mar 2020
Copy of Layout Approval (in case of layout)File: Sanction Plans Tower B 20 Mar 2020 _1.pdf30 Mar 2020
Building Plan Approval (IOD)File: Sanction Plans Tower B 20 Mar 2020_2.pdf30 Mar 2020
Building Plan Approval (IOD)File: Sanction Plans Tower B 20 Mar 2020_3.pdf30 Mar 2020
Building Plan Approval (IOD)File: Sanction Plans Tower B 20 Mar 2020_4.pdf30 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: Sanction 20MAR2020.pdf30 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: KPR Commencement Certificate dtd 10 Oct 2019.pdf11 Oct 2019
Certificates of CA (Form 5)File: RERA KPR Form 5 dt 26Sept19.pdf28 Sep 2019
Proforma of Allotment letterFile: KPR AFS New_compressed.pdf24 Sep 2019
Building plan approvalFile: TB 13 17 to 21 Flr 30 July 2019.pdf5 Aug 2019
Building plan approvalFile: TB Podium Flr 30 July 2019.pdf5 Aug 2019
Building plan approvalFile: TB Stilt Flr 30 July 2019.pdf5 Aug 2019
Building plan approvalFile: TB Typ 1st Refuge Flr 30 July 2019_compressed.pdf5 Aug 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Kashish Park Tower BKashish Park LBS Marg Mulund Check naka Thane - 40060496CompletedDec 2021Dec 2021

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kashish Park Tower B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane west7,600+ in Thane

2 kmKashish Park Tower BCompleted 78Lapsed / revoked 60Other 122Dot size: filed unitsN

Filed coordinates, straight-line distance. 260 registered projects within 2 km.

Builder: Kashish Park Realtors

Kashish Park Realtors has 2 registrations on MahaRERA, including Kashish Park Tower B and Kashish Park Tower C-1. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Kashish Park Tower B is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kashish Park Tower B?

The registered promoter entity is Kashish Park Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kashish Park Tower B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kashish Park Tower B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kashish Park Tower B?

The professionals named in the filing: Architect: Tenfolds Architects & Consultants; Engineer: Pallickal Chacko Varghese; Chartered Accountant: I P Mehta & Co; Chartered Accountant: C R More & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kashish Park Tower B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kashish Park Tower B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kashish Park Tower B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.