ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / K SQURE REGIUM

Registration approved No litigation declared Residential/Group Housing project

K SQURE REGIUM

By KSQURE PROPERTIES PRIVATE LIMITED

RG-KA-73316 · RERA PRM/KA/RERA/1251/309/PR/120722/005065 · Last updated on RERA Karnataka portal: 24 Jun 2022

Source: official RERA Karnataka filing

Red flags

  • 11 complaints at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Aug 2023Possession promisedno revision filed
11Complaints at RERA Karnatakaon this registration
Jump to the 86 documents Report an error

K SQURE REGIUM is a Residential/Group Housing project by KSQURE PROPERTIES PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/120722/005065 on 12 Jul 2022. Possession is promised by 25 Aug 2023. 11 complaints are on record with the regulator.

At a glance

Project

  • NameK SQURE REGIUM
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
    • 560024
  • Pincode560024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/120722/005065
  • ReraGenie IDRG-KA-73316

Builder

  • NameKSQURE PROPERTIES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200TZ2020PTC034092
  • GSTIN29AAICK1665N1ZW
  • Authorized SignatoryVENKATACHALAM. M
  • Managing DirectorVENKATACHALAM. M
  • DirectorsVENKATACHALAM. M, ANUPRIYA V
  • Project HeadVENKATACHALAM. M

Key dates

this monthRegisteredJul 2022PromisedAug 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on12 Jul 2022
  • Promised completion25 Aug 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---36036

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 24 Jun 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 24 Jun 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesNoNot applicable
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,229 sq m
Named landowners2
LandownerVillageDistrict
C.R .JAYAPPA REDDY--
ASWATH REDDY--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 8.01 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 8.01 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANTHOSH B SHETTY
EngineerROSHAN
Chartered AccountantLAKSHMI G K

Complaints filed with RERA Karnataka11

Case no.ComplainantRespondentFiled
00996/2025-KSQURE PROPERTIES PRIVATE LIMITED04/08/2025
00997/2025-KSQURE PROPERTIES PRIVATE LIMITED06/08/2025
00998/2025-KSQURE PROPERTIES PRIVATE LIMITED06/08/2025
00999/2025-KSQURE PROPERTIES PRIVATE LIMITED06/08/2025
01000/2025-KSQURE PROPERTIES PRIVATE LIMITED06/08/2025
01001/2025-KSQURE PROPERTIES PRIVATE LIMITED06/08/2025
01002/2025-KSQURE PROPERTIES PRIVATE LIMITED06/08/2025
01186/2025-KSQURE PROPERTIES PRIVATE LIMITED18/09/2025
01385/2025-KSQURE PROPERTIES PRIVATE LIMITED14/11/2025
01386/2025-KSQURE PROPERTIES PRIVATE LIMITED14/11/2025
01407/2025-KSQURE PROPERTIES PRIVATE LIMITED18/11/2025

Documents filed86

As listed on the registration, under the names the promoter filed them with; the newest 80 of 86 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/120722/005065 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1 CA CertificateFile: 1 Form 1 CA Certificate.pdf24 Jun 2022
Balance SheetFile: 2 Balance Sheet.pdf24 Jun 2022
Khata Details 3 NosFile: 3 Khata Details 3 Nos.pdf24 Jun 2022
Profit and LossFile: 4 Profit and Loss.pdf24 Jun 2022
MRFile: 5 MR.pdf24 Jun 2022
Conversion OrderFile: 6 Conversion Order.pdf24 Jun 2022
SALE DEEDFile: 7 SALE DEED.pdf24 Jun 2022
Form-2, ArchitectFile: 8 Form-2, Architect.pdf24 Jun 2022
Single plot layout planFile: 9 Single plot layout plan.pdf24 Jun 2022
Master planFile: 10 Master plan.pdf24 Jun 2022
Location and DemarcationFile: 11 Location and Demarcation.pdf24 Jun 2022
Single plot layout orderFile: 12 Single plot layout order.pdf24 Jun 2022
Proforma for Agreement of SaleFile: 13 Proforma for Agreement of Sale.pdf24 Jun 2022
Allotment letterFile: 14 Allotment letter.pdf24 Jun 2022
Form-3, EngineerFile: 15 Form-3, Engineer.pdf24 Jun 2022
Legal opinionFile: 16 Legal opinion.pdf24 Jun 2022
RTCFile: 17 RTC.pdf24 Jun 2022
building licenceFile: 18 building licence.pdf24 Jun 2022
CERTIFICATE OF INCORPORATIONFile: 1 CERTIFICATE OF INCORPORATION.PDF28 May 2022
BANK ACCOUNT STATEMENTFile: 2 BANK ACCOUNT STATEMENT.pdf28 May 2022
RTCFile: 3 RTC.pdf28 May 2022
NO LITIGATIONFile: 4 NO LITIGATION.pdf28 May 2022
GUIDANCE VALUEFile: 5 GUIDANCE VALUE.pdf28 May 2022
SINGLE PLOT LAYOUTFile: 6 SINGLE PLOT LAYOUT.pdf28 May 2022
CLU and master plan ClarificationFile: 7 CLU and master plan Clarification.pdf28 May 2022
LOCATION AND DEMARCATIONFile: 8 LOCATION AND DEMARCATION.pdf28 May 2022
SINGLE PLOT LAYOUT ORDERFile: 9 SINGLE PLOT LAYOUT ORDER.pdf28 May 2022
RELINQUISHMENT DEEDFile: 10 RELINQUISHMENT DEED.pdf28 May 2022
AGREEMENT OF SALEFile: 11 AGREEMENT OF SALE.pdf28 May 2022
STP DEMARKETED AND DESIGN PLANFile: 12 STP DEMARKETED AND DESIGN PLAN.pdf28 May 2022
BWSSB NOCFile: 13 BWSSB NOC.pdf28 May 2022
Registration CertificateFile: GST CERTIFICATE.pdf-
Certificate issued by CA Form 1File: Form 1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: Form-2, Architect.pdf-
Certificate issued by Engineer Form 3File: Form-3, Engineer.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
Certificate from Chartered AccountFile: Form 1 CA Certificate.pdf-
Balance Sheet 2020 - 2021File: DECLRATN FOR FINANCIAL DOCNT.pdf-
Balance Sheet 2019 - 2020File: DECLRATN FOR FINANCIAL DOCNT.pdf-
Balance Sheet 2018 - 2019File: DECLRATN FOR FINANCIAL DOCNT.pdf-
Audited Profit and Loss Statement 2020 - 2021File: DECLRATN FOR FINANCIAL DOCNT.pdf-
Audited Profit and Loss Statement 2019 - 2020File: DECLRATN FOR FINANCIAL DOCNT.pdf-
Audited Profit and Loss Statement 2018 - 2019File: DECLRATN FOR FINANCIAL DOCNT.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: DECLRATN FOR FINANCIAL DOCNT.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: DECLRATN FOR FINANCIAL DOCNT.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: DECLRATN FOR FINANCIAL DOCNT.pdf-
building licence-
BESCOM-
BUILDING PLAN-
SECTION PLAN AND SPECIFICATION-
BUILDING PLAN-
specifications-
BUILDING PLAN-
Legal opinion-
JDA-
PARTITION DEED-
AGREEMENT OF SALE-
Brochure-
FORM B-
SECTION 3 1-
JDA affidavit-
BESCOM-
Unnamed document-
Unnamed document-
Unnamed document-
KSPCB-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
MEMORANDUM OF ASSOCIATION-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep K SQURE REGIUM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmK SQURE REGIUMOther 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: KSQURE PROPERTIES PRIVATE LIMITED

KSQURE PROPERTIES PRIVATE LIMITED has 1 registration on RERA Karnataka, including K SQURE REGIUM. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if K SQURE REGIUM is delayed beyond 25 Aug 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of K SQURE REGIUM?

The registered promoter entity is KSQURE PROPERTIES PRIVATE LIMITED, a company as per the filing. Its CIN U45200TZ2020PTC034092 and GSTIN 29AAICK1665N1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in K SQURE REGIUM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against K SQURE REGIUM?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at K SQURE REGIUM?

The professionals named in the filing: Architect: SANTHOSH B SHETTY; Engineer: ROSHAN; Chartered Accountant: LAKSHMI G K. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in K SQURE REGIUM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About K SQURE REGIUM. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save K SQURE REGIUM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.