Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Sep 2022Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 91 documents Report an error

Brigade Senate 1 (Wing 2) is a Commercial project by Brigade Enterprises Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/260522/004923 on 26 May 2022. Possession is promised by 30 Sep 2022.

At a glance

Project

  • NameBrigade Senate 1 (Wing 2)
  • TypeCommercial
  • Location
    • Bengaluru North
    • Bengaluru Urban
    • 560024
  • Pincode560024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/260522/004923
  • ReraGenie IDRG-KA-70301

Builder

  • NameBrigade Enterprises Ltd
  • Entity typeCompany
  • CINL85110KA1995PLC019126
  • GSTIN29AAACB7459F1ZI
  • Authorized SignatoryMr. Subrata K C Sharma
  • Chief Operating OfficerMr. Subrata K C Sharma
  • DirectorsMr. M. R. Jaishankar, Mr. Bijou Kurien, Mr. Aroon Raman, Ms. Lakshmi Venkatachalam, Mr. Pradeep Kumar Panja, Dr. Venkatesh Panchapagesan, Mr. Amar Mysore, Ms. Pavitra Shankar, Ms. Nirupa Shankar, Mr. Roshin Mathew
  • Project HeadRaghavendra S
  • Other registrations45 more →
  • No longer live1 withdrawn or revoked
  • Declared earlier projects67 →

Key dates

this monthRegisteredMay 2022PromisedSep 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on26 May 2022
  • Promised completion30 Sep 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Brigade Senate 1 (Wing 2)---04444

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 5 May 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 5 May 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningYes-
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,765 sq m
Named landowners2
LandownerVillageDistrict
Nagarajun--
Nandini--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 50.00 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 47.60 cr-
On-site expenditure-Site OverheadRs 2.24 cr-
On-site expenditure-Salaries of workersRs 9.68 lakh-
On-site expenditure-Consultants FeesRs 3.88 lakh-
Payment of taxesRs 2.59 lakh-
Payment of PremiumsRs 16,814-
Payment of cessRs 14,816-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGauri Gore
EngineerSterling Engineering Consultancy Services Pvt Ltd
Chartered AccountantT.RAMACHANDRAN AND CO.,

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed91

As listed on the registration, under the names the promoter filed them with; the newest 80 of 91 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/260522/004923 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Khata in favour of LandownerFile: Brigade Senate 1 - Latest Khata Certificate & Extract.pdf5 May 2022
Title Document in favour of LandownerFile: Narasimha Murthy - O S 206.pdf5 May 2022
Title Document in favour of LandownerFile: O S No 210-2001-02.pdf5 May 2022
Title Document in favour of LandownerFile: O S No 212-2001-02.pdf5 May 2022
Certified copy of Guideline ValueFile: Brigade Senate 1 - Wing 2 - Guideline Value Details.pdf5 May 2022
Site PlanFile: Brigade Senate 1 - Wing 2 - Site Plan and Blown Up.pdf5 May 2022
Plan Sanction LetterFile: Brigade Senate 1 - Wing 2 - Plan Sanction letter.pdf5 May 2022
Village Map with demarcation of Project LandFile: Village Map.pdf5 May 2022
CDP Map with demarcation of Project LandFile: CDP Senate-1.jpg5 May 2022
Google Map with demarcation of Project LandFile: Google Image for PPT.jpg5 May 2022
Conversion OrderFile: Brigade Senate 1 - Wing 2 - Conversion Order.pdf5 May 2022
SEIAA NOCFile: Brigade Senate 1 - Environmental Clearance with Expansion.pdf5 May 2022
KSPCB NOCFile: Brigade Senate 1 - KSPCB and Expansion.pdf5 May 2022
Commencement CertificateFile: Brigade Senate 1 - Wing 2 - Commencement Certificate.pdf5 May 2022
Development Details with signatureFile: Brigade Senate 1 - Wing 2 - Development Details.pdf5 May 2022
Notarized Affidavit with Acknowledgement NumberFile: Brigade Senate 1 - Wing 2 - Notarised Affidavit for 3(1) Violation.pdf5 May 2022
Revised Agreement to Sell with Clauses highlightedFile: Brigade Senate 1 - Wing 2 - Revised Agreement to Sell.pdf5 May 2022
STP PlanFile: Brigade Senate 1 Wing 2 - STP Plan.pdf5 May 2022
STP ReportFile: Brigade Senate 1 Wing 2 - STP Report.pdf5 May 2022
Fire NOCFile: Brigade Senate 1 - Wing 2 - Revised Fire NOC.pdf5 May 2022
Reply to the QueriesFile: BRIGADE SENATE 1 WING 2 - LIST OF QUERIES AND BEL REPLY.pdf5 May 2022
RTC, survey 49/4(p)-
Mutation, survey 49/4(p)-
Encumbrance Certificate, survey 49/4(p)-
Conversion/Alienation Order, survey 49/4(p)-
Sale/Title/Gift Deed, survey 49/4(p)-
JDA, survey 49/4(p)-
Khatha, survey 49/4(p)-
RTC, survey 49/5 (P)-
Mutation, survey 49/5 (P)-
Encumbrance Certificate, survey 49/5 (P)-
Conversion/Alienation Order, survey 49/5 (P)-
Sale/Title/Gift Deed, survey 49/5 (P)-
JDA, survey 49/5 (P)-
Khatha, survey 49/5 (P)-
Registration CertificateFile: Certificate of Incorporation - BEL copy.pdf-
Organization StructureFile: Organogram.pdf-
Certificate issued by CA Form 1File: Brigade Senate 1 - Wing 2 - Form 1.pdf-
Certificate issued by Architect Form 2File: Brigade Senate 1 - Wing 2 - Form 2.pdf-
Certificate issued by Engineer Form 3File: Brigade Senate 1 - Wing 2 - Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Brigade Senate 1 Wing 2 - Affidavit - Litigation.pdf-
Certificate from Chartered AccountFile: Brigade Senate 1 - Wing 2 - Approval Cost certificate.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet - 2020-21 with CA UDIN.pdf-
Balance Sheet 2019 - 2020File: Balance Sheet - 2019-20.pdf-
Balance Sheet 2018 - 2019File: Balance Sheet - 2018-19.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Profti and Loss - 2020-21.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Profti and Loss - 2019-20.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Profti and Loss - 2018-19.pdf-
Director's Report 2020 - 2021File: Board Report - 2020-21.pdf-
Director's Report 2019 - 2020File: Board Report - 2019-20.pdf-
Director's Report 2018 - 2019File: Profti and Loss - 2018-19.pdf-
Cash Flow Statement 2020 - 2021File: Cash Flow Statement - 2020-21.pdf-
Cash Flow Statement 2019 - 2020File: Cash Flow Statement - 2019-20.pdf-
Auditor's Report 2020 - 2021File: Auditors Report - 2020-21.pdf-
Auditor's Report 2019 - 2020File: Auditors Report - 2019-20.pdf-
Auditor's Report 2018 - 2019File: Auditors Report - 2018-19.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITRV - 2019-20.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITRV - 2018-19.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITRV - 2017-18.pdf-
Brigade Senate 1 - Wing 2 - Plan Sanction Letter-
Brigade Senate 1 - BESCOM NOC-
Brigade Senate 1 - BWSSB NOC-
Brigade Senate 1 Wing 2 - Site Plan-
Brigade Senate 1 Wing 2 - Site Plan-
Brigade Senate 1 Wing 2 - Typical Floor Plan-
Brigade Senate 1 Wing 2 - Section and Specification-
Brigade Senate 1 Wing 2 - Section and Elevation-
Brigade Senate 1 Wing 2 - Specifications-
Brigade Senate 1 Wing 2 - Section and Elevation-
Brigade Senate 1 Wing 2 - Site Plan-
Brigade Senate 1 Wing 2 - Title Opinion-
Brigade Senate 1 Wing 2 - JDA-
Brigade Senate 1 Wing 2 - Conversion Order-
Brigade Senate 1 Wing 2 - Conversion Order-
Brigade Senate 1 Wing 2 - Sale Deed and RTC - Updated-
Brigade Senate 1 - Wing 2 - Agreement to Sell-
Brigade Senate 1- (Wing 2) - Allotment Notice-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Brigade 7 GardensSubramanyapura, UttarahalliOngoingJul 2022Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Brigade Senate 1 (Wing 2) on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmBrigade Senate 1 (Wing 2Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: Brigade Enterprises Ltd

Brigade Enterprises Ltd has 46 registrations on RERA Karnataka, including Brigade Oasis - Phase 1 and Brigade Atmosphere- Phase 1. Its filings declare 67 earlier projects, 41 of them declared completed. Litigation is declared on 10 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Brigade Senate 1 (Wing 2) is delayed beyond 30 Sep 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Brigade Senate 1 (Wing 2)?

The registered promoter entity is Brigade Enterprises Ltd, a company as per the filing. Its CIN L85110KA1995PLC019126 and GSTIN 29AAACB7459F1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Brigade Senate 1 (Wing 2)?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Brigade Senate 1 (Wing 2)?

The professionals named in the filing: Architect: Gauri Gore; Engineer: Sterling Engineering Consultancy Services Pvt Ltd; Chartered Accountant: T.RAMACHANDRAN AND CO.,. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Brigade Senate 1 (Wing 2)?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Brigade Senate 1 (Wing 2). Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Brigade Senate 1 (Wing 2) to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.