JWALAMALA TEMPLE CREST
By Mehta Real Assets Bangalore Pvt Ltd
RG-KA-79787 · RERA PRM/KA/RERA/1251/310/PR/270625/007874 · Last updated on RERA Karnataka portal: 13 Apr 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
JWALAMALA TEMPLE CREST is a Residential/Group Housing project by Mehta Real Assets Bangalore Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/270625/007874 on 27 Jun 2025. Possession is promised by 23 Oct 2026. 4 of the 36 units on this registration are recorded sold or booked, and 16 of 16 construction stages are filed complete.
At a glance
Project
- NameJWALAMALA TEMPLE CREST
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/270625/007874
- ReraGenie IDRG-KA-79787
Builder
- NameMehta Real Assets Bangalore Pvt Ltd
- Entity typeCompany
- GSTIN29AAFCM7889R1Z3
- Authorized SignatoryBharat G Mehta
- DirectorsBharat G Mehta, Bharat G Mehta
- Project HeadBharath G Mehta
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on27 Jun 2025
- Promised completion23 Oct 2026
- Revised completionNone
- Buildings1 building record
- Documents filed130 files
Current status
Figures as on 13 Apr 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| JWALAMALA TEMPLE CREST | - | - | - | 36 | 0 | 36 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 16 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 13 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | Yes | - |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 100% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | Yes | 100% |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | Yes | 100% |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Bharat G Mehta | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 26.00 cr | Rs 26.00 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SATHASHIVAM V |
| Engineer | MANJUNATH G S |
| Chartered Accountant | Vinay G Lal |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed130
As listed on the registration, under the names the promoter filed them with; the newest 80 of 130 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/270625/007874 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: JTC-Form-4 (1).pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Architect certificate(2).pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engineer certificate (3).pdf | 13 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 13 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4_JTC-Dec 25 (1).pdf | 3 Apr 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 as on Dec 2025 (1).pdf | 3 Apr 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 as on Dec 2025 (1).pdf | 3 Apr 2026 |
| Engineer certificate Form-6File: Engineer certificate Form-6.pdf | 19 Jun 2025 |
| Proforma Allotment letterFile: Proforma Allotment letter.pdf | 19 Jun 2025 |
| BWSSB AND BESCOM NOCFile: BWSSB AND BESCOM NOC.pdf | 19 Jun 2025 |
| Google project locationFile: Google project location.jpeg | 19 Jun 2025 |
| ALLOTMENT LETTERFile: ALLOTMENT LETTER(3).pdf | 16 Jun 2025 |
| BESCOM NDCFile: BESCOM NDC (2).pdf | 16 Jun 2025 |
| bwssb ndcFile: bwssb ndc (1).pdf | 16 Jun 2025 |
| JTC - Engineer Certificate 21-May-2025 09-02-13File: JTC - Engineer Certificate 21-May-2025 09-02-13.pdf | 16 Jun 2025 |
| Project mapFile: Project map.jpeg | 16 Jun 2025 |
| Upload Directors report for 2021-22File: Details of directors.pdf | 21 May 2025 |
| Upload Directors report for2022-23File: Director Details.pdf | 21 May 2025 |
| Upload Directors report for 2023-24File: Director Details.pdf | 21 May 2025 |
| Source of fund - SBI bankFile: SBI SANCTION LETTER (1) (1).pdf | 21 May 2025 |
| ADLR, layout plan, work orderFile: ADLR.pdf | 21 May 2025 |
| KSPCB NOCFile: JTC KSPCB NOC_1 (1).pdf | 21 May 2025 |
| Please update the Latitude and Longitude of the project location details on the project detail pageFile: Latitude (1).pdf | 21 May 2025 |
| Engineer certificateFile: JTC - Engineer Certificate 21-May-2025 09-02-13.pdf | 21 May 2025 |
| BESCOM NOCFile: BESCOM NDC (1) (1).pdf | 21 May 2025 |
| BWSSB NOCFile: bwssb ndc (1).pdf | 21 May 2025 |
| Land costFile: guidance value.pdf | 21 May 2025 |
| Letter of explanationFile: letter for explanation.pdf | 21 May 2025 |
| company registration certificateFile: Incorporation certificate.pdf | 22 Apr 2025 |
| FY 21-22-BalancesheetFile: Financials MRA 21-22-BS.pdf | 22 Apr 2025 |
| FY 22-23-BalancesheetFile: Financial Statement 2022-23-BS.pdf | 22 Apr 2025 |
| FY 23-24-BalancesheetFile: Financials FY 2023-24-BS.pdf | 22 Apr 2025 |
| FY 21-22-Profit and lossFile: Financials MRA 21-22-CF.pdf | 22 Apr 2025 |
| FY 22-23-Profit and lossFile: Financial Statement 2022-23-PL.pdf | 22 Apr 2025 |
| FY 23-24-Profit and lossFile: Financial Statement 2023-24-PL.pdf | 22 Apr 2025 |
| Cash flow- FY 20-21File: Financials MRA 21-22-CF.pdf | 22 Apr 2025 |
| Cash flow- FY 21-22File: Financial Statement 2022-23-CF.pdf | 22 Apr 2025 |
| Cash flow- FY 22-23File: Financials FY 2023-24-CF.pdf | 22 Apr 2025 |
| Sources of fund-1File: Source of fund-supporting_ICICI home finance.pdf | 22 Apr 2025 |
| Sources of fund-2File: Source of fund-supporting_SBI SANCTION LETTER (1).pdf | 22 Apr 2025 |
| Sanction planFile: Building plan.pdf | 22 Apr 2025 |
| CA certificate in prescribed format form-01File: Form-1_JTC.pdf | 22 Apr 2025 |
| Bank account affidavitFile: Bank-Affidavit.pdf | 22 Apr 2025 |
| company registration certificateFile: Incorporation certificate.pdf | 22 Apr 2025 |
| MR showing flow of titles in favor of landowner - KhataFile: latest katha.pdf | 22 Apr 2025 |
| Defect free ECFile: EC-28032025.pdf | 22 Apr 2025 |
| title deed of the current land owner as per latest transaction - Sale deedFile: Sale Deed JTC.pdf | 22 Apr 2025 |
| latest katha extract issued by BBMPFile: latest katha.pdf | 22 Apr 2025 |
| notarized affidavitFile: Notarised affidavit-Litigation jtc.pdf | 22 Apr 2025 |
| AffidavitFile: Affidavit.pdf | 22 Apr 2025 |
| ADLR Certified survey sketchFile: ADLR.pdf | 22 Apr 2025 |
| commencement certificateFile: jtc cc.pdf | 22 Apr 2025 |
| Approved Master planFile: Building plan.pdf | 22 Apr 2025 |
| Village map certifiedFile: Village map.pdf | 22 Apr 2025 |
| KSPCB NOCFile: BESCOM NDC (1).pdf | 22 Apr 2025 |
| Latitude and Longitude of the project locationFile: Latitude.pdf | 22 Apr 2025 |
| Engineer certificateFile: Form 3 -Engineer.pdf | 22 Apr 2025 |
| calculation sheet for the amenities and common area details certified by the engineerFile: estimation engineer.pdf | 22 Apr 2025 |
| latest dated self-attested copy of the Engineer license certificateFile: structural engineer self attested incorporation certificate.pdf | 22 Apr 2025 |
| brief estimated cost of construction certified by the registered Civil EngineerFile: estimation engineer.pdf | 22 Apr 2025 |
| project specification by incorporating the project Name and Project Address certified by the EngineeFile: specification and area.pdf | 22 Apr 2025 |
| project name and project address, and upload the project section 3(1) notarized affidavitFile: Affidavit.pdf | 22 Apr 2025 |
| proforma of the Allotment letter in the prescribed formatFile: ALLOTMENT LETTER(2).pdf | 22 Apr 2025 |
| proforma of the Agreement for SaleFile: Agreement for sale.pdf | 22 Apr 2025 |
| BESCOM NOCFile: BESCOM NDC (1).pdf | 22 Apr 2025 |
| BWSSB NOCFile: bwssb ndc.pdf | 22 Apr 2025 |
| STP design drawing certified by the EngineerFile: stp dwg.pdf | 22 Apr 2025 |
| Land cost calculation sheetFile: estimation engineer.pdf | 22 Apr 2025 |
| source of water supplyFile: water source.pdf | 22 Apr 2025 |
| Registered Engineer indicating the structural safety adopted for the proposed buildingFile: structura stability JTC.pdf | 22 Apr 2025 |
| Building licenceFile: Building licence(2).pdf | 22 Apr 2025 |
| CDP PLANFile: CDP PLAN.pdf | 22 Apr 2025 |
| Village mapFile: Village map.pdf | 22 Apr 2025 |
| RTC, survey 63/1 | - |
| Mutation, survey 63/1 | - |
| Encumbrance Certificate, survey 63/1 | - |
| Conversion/Alienation Order, survey 63/1 | - |
| Khatha, survey 63/1 | - |
| Memorandum of AssociationFile: MOA & AOA.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep JWALAMALA TEMPLE CREST on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Mehta Real Assets Bangalore Pvt Ltd
Mehta Real Assets Bangalore Pvt Ltd has 1 registration on RERA Karnataka, including JWALAMALA TEMPLE CREST. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if JWALAMALA TEMPLE CREST is delayed beyond 23 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of JWALAMALA TEMPLE CREST?
The registered promoter entity is Mehta Real Assets Bangalore Pvt Ltd, a company as per the filing. Its GSTIN 29AAFCM7889R1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in JWALAMALA TEMPLE CREST?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at JWALAMALA TEMPLE CREST?
The professionals named in the filing: Architect: SATHASHIVAM V; Engineer: MANJUNATH G S; Chartered Accountant: Vinay G Lal. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in JWALAMALA TEMPLE CREST?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.