Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Apr 2025Possession promisedmoved 9 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 38 documents Report an error

JCSV PRIDE is a Residential/Group Housing project by JCSV BUILDERS & DEVELOPERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/191015/002920 on 15 Oct 2019. Possession is promised by 30 Apr 2025. The completion date has moved by 9 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameJCSV PRIDE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/191015/002920
  • ReraGenie IDRG-KA-22431

Builder

  • NameJCSV BUILDERS & DEVELOPERS
  • Entity typePartnership Firm
  • Authorized SignatoryJAGADISH K
  • DirectorsK Santhosh, K JAGADISH

Key dates

this monthRegisteredOct 2019First promiseJul 2024Revised toApr 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Oct 2019
  • Promised completion30 Apr 2025
  • Revised completionRevised to 30 Apr 2025 (originally 31 Jul 2024)
  • Buildings1 building record
  • Documents filed38 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JCSV PRIDE---80080

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities46

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
senior citizen LoungeNoNot applicable
Jogging TrackNoNot applicable
Single Basket Ball hoopNoNot applicable
STPNoNot applicable
LiftsNoNot applicable
Trees all round the projectNoNot applicable
StaircasesYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallNoNot applicable
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,481 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 19.50 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAni Sambyal Singh
EngineerACME Consultants.inc

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJul 2024 → Apr 2025

No reason recorded in the filing

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01493/2025-JCSV BUILDERS & DEVELOPERS19/12/2025

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/191015/002920 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: JCSV FORM D.pdf-
Sanction plan jcsv-
JCSV Pride site plan-
11-2 release deeds katha cer tax paid conversion-
JCSV Pride SP 4 section plan-
EC 1-6-89 to 15-8-2019 jcsv pride-
Affidavit Authorization-
Affidavit with JD-shareing agree-
11-2 BBMP KATHA AND CERIFICATE 2017-18-
11-2 JCSV JD-
NOC receipts, RTC-
CONVERSION CERTIFICATE-
NOC land use-
11-2 BWSSB PLAN FEES RECEIPT-
polution control board-
JCSV Pride Sanction plan site plan _All-
JCSV PRIDE- GROUND FLOOR-
JCSV PRIDE- SECOND & THIRD-
Legal openion of JCSV Pride-
Balance Sheet 2017 - 2018File: BALANCE SHEET OF JCSV.pdf-
Audited Profit and Loss Statement 2017 - 2018File: jcsv P & L.pdf-
Cash Flow Statement 2017 - 2018File: JCSV SCHEDULES.pdf-
Auditor's Report 2017 - 2018File: Audit report declaration jcsv.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: Audit report declaration jcsv.pdf-
FORM B JCSV-
Tower Excel SheetFile: PRMKARERA1251310PR191015002920.xlsx-
Stability CertificateFile: Structural stability Certificate.pdf-
Occupancy CertificateFile: OC JCSV PRIDE 11 07 25.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Electrical inspectorate Approval 1.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: Electrical inspectorate Approval 2.pdf-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: Completion of External work.pdf-
Common Area and other amenities facilities are completed or not and details of handling over of the same to asFile: Completion of Amenities.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit cum Declaration for completion.pdf-
Completion Certificate 23 05 25File: Completion Certificate 23 05 25.pdf-
Electrical inspectorate Approval 3File: Electrical inspectorate Approval 3.pdf-
OC Application Letter 01 03 25File: OC Application Letter 01 03 25.pdf-
JCSV BUILDERS - Lift LicenseFile: JCSV BUILDERS - Lift License.pdf-
No change in inventoryFile: No change in inventory.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep JCSV PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmJCSV PRIDEOther 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: JCSV BUILDERS & DEVELOPERS

JCSV BUILDERS & DEVELOPERS has 1 registration on RERA Karnataka, including JCSV PRIDE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if JCSV PRIDE is delayed beyond 30 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of JCSV PRIDE?

The registered promoter entity is JCSV BUILDERS & DEVELOPERS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in JCSV PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against JCSV PRIDE?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at JCSV PRIDE?

The professionals named in the filing: Architect: Ani Sambyal Singh; Engineer: ACME Consultants.inc. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JCSV PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JCSV PRIDE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JCSV PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.