Red flags

  • Completion date moved by 33 months
  • 3 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Jul 2023Possession promisedmoved 33 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 64 documents Report an error

Jayani Paradise is a Residential/Group Housing project by M/s Jayani Builders and Developers in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/190215/002379 on 15 Feb 2019. Possession is promised by 10 Jul 2023. The completion date has moved by 33 months from the original filing.

At a glance

Project

  • NameJayani Paradise
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/190215/002379
  • ReraGenie IDRG-KA-03338

Builder

  • NameM/s Jayani Builders and Developers
  • Entity typePartnership Firm
  • Authorized SignatoryS Rajagopal
  • OthersG Srinivasappa

Key dates

this monthRegisteredFeb 2019First promiseOct 2020Revised toJul 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Feb 2019
  • Promised completion10 Jul 2023
  • Revised completionRevised to 10 Jul 2023 (originally 10 Oct 2020)
  • Buildings2 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower A---1040104
Tower B---1190119

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 22 Dec 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 22 Dec 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemNoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,509 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 42.00 cr

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionOct 2020 → Jul 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1251/446/PR/230310/002379Jul 2021 → Jul 2022

Reason as filed by the promoterShortage of Labour

ExtensionJul 2022 → Jul 2023

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed64

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/190215/002379 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Affidavit for BESCOM NOCFile: Affidavit for BESCOM NOC.pdf22 Dec 2021
Contractor/Engineers/ArchitectFile: Contractor-Engineer-Architect.pdf22 Dec 2021
NOC SEIAAFile: NOC SEIAA.pdf22 Dec 2021
Provision of STP with drawing and DocumentsFile: Provision of STP.pdf22 Dec 2021
Provision of STP with drawing and DocumentsFile: STP drawing and document.pdf22 Dec 2021
Template-6 (FORM(Ex-7))File: Form-Ex7 Affidavit for seeking extension of registered project.pdf7 Oct 2021
Commencement Certificate for Block AFile: CC of JAYANI block A.pdf7 Oct 2021
Commencement Certificate for Block BFile: CC of block b JAYANI.pdf7 Oct 2021
Affidavit abiding to pay compensation event due to delay as per Section 18(1) of RERA ActFile: Affidavit as per Section 18(1) of RERA Act.pdf7 Oct 2021
Certificate from Registered Engineer indicating the structural safety of the buildingFile: Structural Stability Certificate.pdf7 Oct 2021
Contractor/Engineer/Architects detailsFile: Contractor-Structural-Architect.pdf7 Oct 2021
Latitude and LongitudeFile: Latitude and Longitude .pdf7 Oct 2021
Project on going status Block-AFile: BlockA Status1.pdf7 Oct 2021
Project on going status Block-BFile: BlockBStatus1.pdf7 Oct 2021
Break up development Details with type of flat, size and numbersFile: Break up Developement details2.pdf7 Oct 2021
NOC issued by Power supplyFile: Noc Bescom.pdf7 Oct 2021
NOC issued by KSPCBFile: Noc kspcb.pdf7 Oct 2021
Area statementFile: Land Area Details.pdf7 Oct 2021
CertificateFile: jayani- firm reg certificate.pdf-
Project Details-
Architect Certificate for Work Completion Schedule till DateFile: Form-Ex1 Architect Certificate For Status of Work As On Date.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form-Ex5 Engineers Certificate for Status of Work as on date.pdf-
CA Certificate for Funds UtilizationFile: Form-Ex3 Chartered Accountant Certificate For Fund Utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Form-Ex2 Architect Certificate For Pending Work As On Date.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form-Ex6 Engineers Certifictae for Pending work as on date.pdf-
CA Certificate for Funds required for Project CompletionFile: Form-Ex4 Chartered Accountant Certificate For Fund Required.pdf-
AffidavitFile: Affidavit_Rera.pdf-
Latest Encumbrance CertificateFile: EC_Jayani.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: Form-B Rera.pdf-
PLAN ALL-min-
PLAN ALL-min-
partion deed and Rtc-
PLAN ALL-min-
plan laisence copy-
Broucher of jayani-
specifications-
ec of jayani-
Katharine and Katharine extract of jayani-
jd of jayani-
title deeds-
conversion copy of jayani-
bwssb copy-
Unnamed document-
PLAN ALL-min-
PLAN ALL-min-
conversion copy of jayani-
Prospectus/BrochureFile: jayani.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_190215_002379 (2).xlsx-
Loan raised documentFile: LoanDetails_JayaniParadise.pdf-
Stability CertificateFile: Structural Stability Certificate.pdf-
Road cutting permission letter issued by the planning Authority for laying Water supply line, sanitary line, UFile: JayaniPDF.pdf-
Occupancy CertificateFile: Final _OC jayani.pdf-
Consent for operation issued by KSPCBFile: Consent for operation by KSPCB.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Jayani Paradise_20200810_0001.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: Bescom Sanction letter Jayani.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB sanction letter Jayani.pdf-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: Form-6_Engineer_Closingproject.pdf-
Common Area and other amenities facilities are completed or not and details of handling over of the same to asFile: Aminities and Common arera work.pdf-
Details of undivided share of land handed over to the association of allotteesFile: CommonAreaUDS.pdf-
Architect certificate for having completed the work(in format no 5)File: Form-5_Architect_Closingproject.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4_CA Certificate Completion.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Completion Affidavit jayani.pdf-
Structural Engineer CertificateFile: Form-6_Engineer_Closingproject.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 33 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Jayani Paradise on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: M/s Jayani Builders and Developers

M/s Jayani Builders and Developers has 1 registration on RERA Karnataka, including Jayani Paradise. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Jayani Paradise is delayed beyond 10 Jul 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Jayani Paradise?

The registered promoter entity is M/s Jayani Builders and Developers, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Jayani Paradise?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in Jayani Paradise?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jayani Paradise. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jayani Paradise to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.