Home / Browse projects / Mumbai Suburban, Maharashtra / IVY CHS LTD ADITYARAJ ONE

Completed No litigation declared Residential / Group Housing project

IVY CHS LTD ADITYARAJ ONE

By SAI ADITYARAJ

RG-MH-46223 · RERA P51800033847 · Last updated on MahaRERA portal: 6 Aug 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jan 2026Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

IVY CHS LTD ADITYARAJ ONE is a Residential / Group Housing project by SAI ADITYARAJ in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800033847 on 14 Mar 2022. The registration is recorded completed; possession was promised by 31 Jan 2026.

At a glance

Project

  • NameIVY CHS LTD ADITYARAJ ONE
  • TypeResidential / Group Housing
  • Location
    • 2101 BUILDING NO 3 PURNIMA CHS LTD TAGORE NGAR
    • VIKHROLI EAST
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • RERA no.P51800033847
  • ReraGenie IDRG-MH-46223

Builder

  • NameSAI ADITYARAJ
  • Entity typePartnership
  • PartnerROCKY RAJKUMAR KHUSHALANI

Key dates

this monthRegisteredMar 2022PromisedJan 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Mar 2022
  • Promised completion31 Jan 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ADITYARAJ ONENA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

ADITYARAJ ONE: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area682 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SAI ADITYARAJKurlaMumbai Suburban

Approvals and building plan

Permissible FSI4340.6
Proposed, not sanctioned4,341 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBUILDING NO 150 STELLA RESIDENCY KANNAMWAR NAGAR VIKHROLI EAST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANKIT M MAKANI
EngineerNAVINDER PAL SINGH
Chartered AccountantCHIRAG SURANA
PartnerRole in project
SAI ADITYARAJ-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 May 2025

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM - 2A.pdf6 Aug 2025
Form 1File: Form 1.pdf24 May 2025
Form 2File: Form 2.pdf24 May 2025
Form 3File: Form 3.pdf24 May 2025
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf24 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf24 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Full OC.pdf22 May 2025
Other - TechnicalFile: FORM 4.pdf22 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Mar 2025
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf23 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Sale Agreement.pdf23 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023 24.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 bldg 01.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BLDG NO 1.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BLDG NO 1.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 23.pdf16 Mar 2024
Other - FinanceFile: revised annexure A.pdf11 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSER INTEREST OF RRK.pdf7 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 20 Disclosure of Interest MRK.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Feb 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES ON DATED 16 2 24.pdf16 Feb 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES ON DATED 16 2 24.pdf16 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SIGNED.pdf16 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf15 Jan 2024
Other - FinanceFile: self declaration.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31 12 2022.pdf13 Jan 2024
Proforma of Agreement for saleFile: Draft Agreement for Sale 12 01 2024.pdf13 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf13 Jan 2024
Other - FinanceFile: annexure A.pdf13 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Mar 22.pdf12 Jan 2024
Declaration about Commencement CertificateFile: Scan.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: bldg no 1 form 2 sep 23.pdf10 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BLDG NO 1 JUNE 22.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BLDG NO 1 SEP 22.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 bldg no 1 dec 22.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BLDG NO 1 MARCH 23.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPTEMBER 23 QUATER 3.pdf8 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: D 1 kn Final CC.pdf4 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG NO 01 JUNE 23.pdf4 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BLDG NO 1.pdf4 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: BLDG NO - 01 FORM 2A.pdf27 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 01.pdf25 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BLDG NO 01 FORM 1.pdf21 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BLDG NO 1 30 09 22.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BLDG NO 1 31 12 22.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BLDG NO 1 31 3 23.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BLDG NO 1 30 06 23.pdf20 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf9 Dec 2022
Declaration about Commencement CertificateFile: CC Declaration new.pdf9 Dec 2022
Building plan approvalFile: Approvals sai.pdf10 Mar 2022
Layout approvalFile: Plan Approval.pdf10 Mar 2022
Copy of the legal title reportFile: Title Report Sai.pdf10 Mar 2022
Details of encumbrancesFile: Encumbrances.pdf10 Mar 2022
Copy of Layout Approval (in case of layout)File: Plan Approval.pdf10 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Approvals sai.pdf10 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: CC bldg no 01.pdf10 Mar 2022
Declaration about Commencement CertificateFile: CC Declaration.pdf10 Mar 2022
Declaration in FORM BFile: form b.pdf10 Mar 2022
CERSAI detailsFile: CERSAI Undertaking.pdf10 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 sai.pdf10 Mar 2022
Proforma of Allotment letterFile: Agreement for Sale.pdf10 Mar 2022
Proforma of Allotment letterFile: BOOKING LETTER RERA.pdf10 Mar 2022
PAN CardFile: Pan Card - Sai Adityaraj.pdf4 Feb 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep IVY CHS LTD ADITYARAJ ONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIKHROLI EAST6,700+ in Mumbai Suburban

Builder: SAI ADITYARAJ

SAI ADITYARAJ has 1 registration on MahaRERA, including IVY CHS LTD ADITYARAJ ONE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if IVY CHS LTD ADITYARAJ ONE is delayed beyond 31 Jan 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IVY CHS LTD ADITYARAJ ONE?

The registered promoter entity is SAI ADITYARAJ, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IVY CHS LTD ADITYARAJ ONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for IVY CHS LTD ADITYARAJ ONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IVY CHS LTD ADITYARAJ ONE?

The professionals named in the filing: Architect: ANKIT M MAKANI; Engineer: NAVINDER PAL SINGH; Chartered Accountant: CHIRAG SURANA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IVY CHS LTD ADITYARAJ ONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IVY CHS LTD ADITYARAJ ONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IVY CHS LTD ADITYARAJ ONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.