Red flags
- Completion date moved by 21 months
- 2 extensions taken
Clear
- No complaints on record
- Separate project account declared
Saved.
ISR INDRAPRASTHA is a Residential/Group Housing project by ISR CONSTRUCTIONS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/200811/003519 on 11 Aug 2020. Possession is promised by 30 Aug 2025. The completion date has moved by 21 months from the original filing.
At a glance
Project
- NameISR INDRAPRASTHA
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/200811/003519
- ReraGenie IDRG-KA-95935
Builder
- NameISR CONSTRUCTIONS PRIVATE LIMITED
- Entity typeCompany
- CINU45209TG2013PTC089980
- Authorized SignatoryK INDRASENA REDDY
- DirectorsK PRASHANTHI, SOMA KRISHNA REDDY, RAM MOHAN REDDY G, R NARASIMHA REDDY, K INDRASENA REDDY
- Other registrations1 more →
- No longer live1 withdrawn or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on11 Aug 2020
- Promised completion30 Aug 2025
- Revised completionRevised to 30 Aug 2025 (originally 30 Nov 2023)
- Buildings2 building records
- Documents filed94 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLOCK A | - | - | - | 74 | 0 | 74 |
| BLOCK B | - | - | - | 33 | 0 | 33 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 26 Jun 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | Not applicable |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | Not applicable |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 26 Jun 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | No | Not applicable |
| Water conservation | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | No | Not applicable |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | No | Not applicable |
| Staircases and Lift lobbies, corridor,lobbies, corridor | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building / common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| THATHAPPA REDDY | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | LANDMARK ARCHITECT'S AND ENGINEERS |
| Engineer | ECO CONSULTANTS |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterothers
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed94
As listed on the registration, under the names the promoter filed them with; the newest 80 of 94 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/200811/003519 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Local water Supply AuthorityFile: BWSSB_upload.pdf | 26 Jun 2020 |
| NOC from Power Supply AuthorityFile: BESCOM Letter_compressed.pdf | 20 Jun 2020 |
| Consolidated EC of all Survey numbers from 01/04/2019 To 28/05/2020File: Consolidated EC of all sy nos 010419 to 280520.pdf | 8 Jun 2020 |
| Payment receipt for New Project ISR INDRAPRASTHA RegistrationFile: RERA FEE PAID RECIPET.pdf | 30 May 2020 |
| Sale Deed in favor of Land Owners Part 1File: SALE DEED LAND OWNERS Part 1.pdf | 30 May 2020 |
| Sale Deed in favor of Land Owners Part 2File: SALE DEED LAND OWNERS Part 2.pdf | 30 May 2020 |
| Discharge Deed in favor to Land Owners Part 3File: DISCHARGED DEED Land Owners Part 3.pdf | 30 May 2020 |
| Katha Abstract of All Land OwnersFile: KATHA ALL OWNERS.pdf | 30 May 2020 |
| Conversion Orders for All Survey Numbers pertaining to the ProjectFile: CONVERSION COPIES.pdf | 30 May 2020 |
| EC from 01-04-2019 To 28-05-2020 First PageFile: EC First Page.jpg | 30 May 2020 |
| EC from 01-04-2019 To 28-05-2020 Last PageFile: EC last Page.jpg | 30 May 2020 |
| Plan License Letter issued by BBMPFile: BBMP LICENSE.pdf | 30 May 2020 |
| Noc issued by KSPCBFile: PCB.pdf | 30 May 2020 |
| Elevation and Section of the Building PlanFile: SECTION PLAN OR SITE PLAN-min.pdf | 30 May 2020 |
| CertificateFile: Cerficate of Incorporation.pdf | - |
| Architect Certificate for Work Completion Schedule till DateFile: Architect Certificate Work Done.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate Work Done.pdf | - |
| CA Certificate for Funds UtilizationFile: CA Certificate Utilized.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Architect Certificate Pending.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Engineer Certificate Pending Work.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: CA Certificate Required.pdf | - |
| AffidavitFile: Notarized Affidavit Form_Ex7.pdf | - |
| Latest Encumbrance CertificateFile: Latest EC.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx | - |
| Villa Plan_compressed (2) | - |
| Draft Sale Deed | - |
| Draft Agreement to Sell | - |
| RTC | - |
| ISR_Indraprastha_Brochure_RERA_compressed (1) | - |
| Project Specification | - |
| EC - Copy_compressed | - |
| Section 3(1) Notarized | - |
| Joint Affidavit Cum Declaration | - |
| bbmp licence certificate | - |
| JDA | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Balance Sheet 2018 - 2019File: ISR Balance Sheet 2018-19.jpeg | - |
| Balance Sheet 2017 - 2018File: ISR Balance Sheet 2017-18.jpeg | - |
| Balance Sheet 2016 - 2017File: ISR Balance Sheet_2016-17.jpeg | - |
| Audited Profit and Loss Statement 2018 - 2019File: ISR P & L Account 2018-19.jpeg | - |
| Audited Profit and Loss Statement 2017 - 2018File: ISR P & L Account 2017-18.jpeg | - |
| Audited Profit and Loss Statement 2016 - 2017File: ISR P & L Account 2016-17.jpeg | - |
| Director's Report 2018 - 2019File: ISR Directors Report 2018-19.jpeg | - |
| Director's Report 2017 - 2018File: ISR Directors Report 2017-18.jpeg | - |
| Director's Report 2016 - 2017File: ISR Directors Report 2017-18.jpeg | - |
| Cash Flow Statement 2018 - 2019File: ISR P & L Account 2018-19.jpeg | - |
| Cash Flow Statement 2017 - 2018File: ISR P & L Account 2017-18.jpeg | - |
| Auditor's Report 2018 - 2019File: IA report FY 2018-19.pdf | - |
| Auditor's Report 2017 - 2018File: IA report FY 2017-18.pdf | - |
| Auditor's Report 2016 - 2017File: IA report FY 2016-17_compressed (1).pdf | - |
| Income Tax Return Acknowledgement 2018 - 2019File: ISR ITR V AY 2019-20 FY 2018-19.jpeg | - |
| Income Tax Return Acknowledgement 2017 - 2018File: ISR ITR V AY 2017-18 FY 2016-17.jpg | - |
| Income Tax Return Acknowledgement 2016 - 2017File: SCAN SELF DECLARATION FOR ITR.jpeg | - |
| Form B Declaration_compressed (1) | - |
| Prospectus/BrochureFile: e-brochure_ISR_Indraprastha_2021.pdf | - |
| Advertisement Copy 1File: e-brochure_ISR_Indraprastha_2021.pdf | - |
| Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_200811_003519.xlsx | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| ISR ASHRITA | - | Ongoing | Sep 2021 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep ISR INDRAPRASTHA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 26 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: ISR CONSTRUCTIONS PRIVATE LIMITED
ISR CONSTRUCTIONS PRIVATE LIMITED has 2 registrations on RERA Karnataka, including ISR INDRAPRASTHA and ISR ASHRITA. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if ISR INDRAPRASTHA is delayed beyond 30 Aug 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of ISR INDRAPRASTHA?
The registered promoter entity is ISR CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Its CIN U45209TG2013PTC089980 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in ISR INDRAPRASTHA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at ISR INDRAPRASTHA?
The professionals named in the filing: Architect: LANDMARK ARCHITECT'S AND ENGINEERS; Engineer: ECO CONSULTANTS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ISR INDRAPRASTHA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback